The IRM-PMO maintains various documents for use by the wildland fire
community. The documents have been organized by subject and document type. To
view the list of documents within a subject or of a document type, select one of
the following links.
| Criteria for NWCG System of Record |
A description of the criteria to be met for an information storage system to be designated an NWCG System of Record. (current version: January 10, 2004) [12K, PDF] |
| Inventory Information Submittal Form |
Blank form to be used for submitting inventory additions or corrections to the IRM-PMO. This form is in MS Word format. (current version: May 9, 2003) [79K, DOC] |
| NWCG Guide for Interconnecting Information Technology Systems |
Guidelines describing and establishing a standardized and
repeatable process for interconnecting NWCG-chartered IT systems.
(Version 1.3, May 2003) [600K, DOC] |
| Principles, Guidelines, and Standards for Data Exchange Between Applications |
A document identifying certain principles, guidelines, and standards to be used when providing for data exchange between applications during the development and maintenance of NWCG IRM systems. (Version 1.0, January 2003) [172K, PDF] |
| Validation
Status of Inventory Entries |
The IRM-PMO has been updating and validating
information in the inventory. This report shows which entries have been
recently validated and which have not. (updated: July 15, 2003) [260K, PDF] |
| Wildland Fire Software Application Inventory Concept Paper |
Concept paper setting forth the concepts and approaches for the NWCG Wildland Fire Software Inventory. (Version 1.1, September 7, 2001) [193K, PDF] |
| Project
Charter Guidelines |
Recommendations and guidelines for preparing
project charters. A Project Charter Template accompanies this document.
(Version 1.4, September 2002) [200K, PDF] |
| Project
Charter Template |
A template document for use in preparing
project charters. The template is intended for use with the NWCG Project
Charter Guidelines document. The template is an MSWord document formatted
with section headers matching the guidelines. (Version 1.0, November 2001)
[57K, MSWord] |
| Project
Management Principles, Guidelines, and Standards |
A document identifying certain principles,
guidelines, and standards to be used in the development and maintenance of
NWCG IRM systems. (Version 1.0, July 2002) [184K, PDF] |
| Project
Plan Guidelines |
A document defining project plans and the
components of project plans. The document contains recommendations and
guidelines for preparing project plans. (Version 1.2, November 2001)
[202K, PDF] |
| Project
Status Report Template |
Template for use in periodically reporting
project status and activity to the IRMWT and IRM-PMO. (Version 1.2,
November 2001) [56K, MSWord] |
| Criteria for NWCG System of Record |
A description of the criteria to be met for an information storage system to be designated an NWCG System of Record. (current version: January 10, 2004) [12K, PDF] |
| Document
Review Guidelines |
Policy, process and standards applicable to
document reviews conducted by the IRM-PMO. (Version 1.2, November 2001)
[187K, PDF] |
| Principles,
Guidelines, and Standards for Data Exchange Between Applications |
A document identifying certain principles,
guidelines, and standards to be used when providing for data exchange
between applications during the development and maintenance of NWCG IRM
systems. (Version 1.0, January 2003) [172K, PDF] |
| NWCG Guide for Interconnecting Information Technology Systems |
Guidelines describing and establishing a standardized and
repeatable process for interconnecting NWCG-chartered IT systems.
(Version 1.3, May 2003) [600K, DOC] |
| Project
Charter Guidelines |
Recommendations and guidelines for preparing
project charters. A Project Charter Template accompanies this document.
(Version 1.4, September 2002) [200K, PDF] |
| Project
Charter Template |
A template document for use in preparing
project charters. The template is intended for use with the NWCG Project
Charter Guidelines document. The template is an MSWord document formatted
with section headers matching the guidelines. (Version 1.0, November 2001)
[57K, MSWord] |
| Project
Management Principles, Guidelines, and Standards |
A document identifying certain principles,
guidelines, and standards to be used in the development and maintenance of
NWCG IRM systems. (Version 1.0, July 2002) [184K, PDF] |
| Project
Plan Guidelines |
A document defining project plans and the
components of project plans. The document contains recommendations and
guidelines for preparing project plans. (Version 1.2, November 2001)
[202K, PDF] |
| Project
Status Report Template |
Template for use in periodically reporting
project status and activity to the IRMWT and IRM-PMO. (Version 1.2,
November 2001) [56K, MSWord] |
| White
Paper Guidelines |
Recommendations and guidelines for preparing
white papers. Two templates accompany the guidelines -- one template is
for short papers, the other is for longer papers. (Version 1.1, November
2001) [176K, PDF] |
| White
Paper Template (long) |
Template for use in preparing long white
papers. The template is formatted with a title page and table of contents.
The template is intended for use with the White paper Guidelines
documents. (Version 1.0, November 2001) [46K, MSWord] |
| White
Paper Template (short) |
Template for use in preparing short white
papers. the template is formatted as a single page without title page or
table of contents. The template is intended for use with the White Paper
Guidelines document. (Version 1.0, November 2001) [32K, MSWord] |
| Current
Initiatives Status |
A spreadsheet showing the status of IRM-PMO
involvement in current automation initiatives in the wildland fire
community. (Current as of January 15, 2002) [24K, PDF] |
| IRM-PMO
Products List |
A list, with descriptions and current status,
of products identified in the IRM-PMO Strategic Plan. (Current as of
January 2002) [52K, PDF] |
| Validation
Status of Inventory Entries |
The IRM-PMO has been updating and validating
information in the inventory. This report shows which entries have been
recently validated and which have not. (updated: July 15, 2003) [260K, PDF] |
| Project
Status Report Template |
Template for use in periodically reporting
project status and activity to the IRMWT and IRM-PMO. (Version 1.2,
November 2001) [56K, MSWord] |
| Project
Charter Template |
A template document for use in preparing
project charters. The template is intended for use with the NWCG Project
Charter Guidelines document. The template is an MSWord document formatted
with section headers matching the guidelines. (Version 1.0, November 2001)
[57K, MSWord] |
| Project
Status Report Template |
Template for use in periodically reporting
project status and activity to the IRMWT and IRM-PMO. (Version 1.2,
November 2001) [56K, MSWord] |
| White
Paper Template (long) |
Template for use in preparing long white
papers. The template is formatted with a title page and table of contents.
The template is intended for use with the White paper Guidelines
documents. (Version 1.0, November 2001) [46K, MSWord] |
| White
Paper Template (short) |
Template for use in preparing short white
papers. the template is formatted as a single page without title page or
table of contents. The template is intended for use with the White Paper
Guidelines document. (Version 1.0, November 2001) [32K, MSWord] |
| DAWG
Concept Paper |
Concept paper setting forth the concepts and
approaches for the NWCG Data Administration Working Group (DAWG). (Final
version, December 19, 2001) [196K, PDF] |
| White
Paper Guidelines |
Recommendations and guidelines for preparing
white papers. Two templates accompany the guidelines -- one template is
for short papers, the other is for longer papers. (Version 1.1, November
2001) [176K, PDF] |
| White
Paper Template (long) |
Template for use in preparing long white
papers. The template is formatted with a title page and table of contents.
The template is intended for use with the White paper Guidelines
documents. (Version 1.0, November 2001) [46K, MSWord] |
| White
Paper Template (short) |
Template for use in preparing short white
papers. the template is formatted as a single page without title page or
table of contents. The template is intended for use with the White Paper
Guidelines document. (Version 1.0, November 2001) [32K, MSWord] |
| Wildland
Fire Software Application Inventory Concept Paper |
Concept paper setting forth the concepts and
approaches for the NWCG Wildland Fire Software Inventory. (Version 1.1,
September 7, 2001) [193K, PDF] |
| Document
Review Guidelines |
Policy, process and standards applicable to
document reviews conducted by the IRM-PMO. (Version 1.2, November 2001)
[187K, PDF] |
| IRM-PMO
Products List |
A list, with descriptions and current status,
of products identified in the IRM-PMO Strategic Plan. (Current as of
January 2002) [52K, PDF] |
| White
Paper Guidelines |
Recommendations and guidelines for preparing
white papers. Two templates accompany the guidelines -- one template is
for short papers, the other is for longer papers. (Version 1.1, November
2001) [176K, PDF] |
| White
Paper Template (long) |
Template for use in preparing long white
papers. The template is formatted with a title page and table of contents.
The template is intended for use with the White paper Guidelines
documents. (Version 1.0, November 2001) [46K, MSWord] |
| White
Paper Template (short) |
Template for use in preparing short white
papers. the template is formatted as a single page without title page or
table of contents. The template is intended for use with the White Paper
Guidelines document. (Version 1.0, November 2001) [32K, MSWord] |