Skip to main content

Test 6MFS Graphic

Building fireline downhill requires special attention to safety factors because of the potential for rapid uphill fire spread. This Watch Out depicts firefighters building fireline downhill without first mitigating the existing hazards.

Read about all 18 Watch Out Situations..

Downhill fireline construction is hazardous in steep terrain, fast-burning fuels, or rapidly changing weather. Downhill fireline construction should not be attempted unless there is no tactical alternative. When building downhill fireline:

  • Crew supervisor(s) and fireline overhead must discuss assignments prior to committing personnel. Qualified, responsible overhead individuals such as a Task Force Leader (TFLD) or an Incident Commander Type 4 (ICT4) at minimum, will stay with resources until the job is completed.
  • Decisions about downhill fireline construction will be made only after proposed fireline has been scouted by supervisor(s) of involved crew(s).
  • Lookouts, Communications, Escape Routes, and Safety Zones (LCES) will be coordinated for all personnel involved. This includes verifying:
    • Crew supervisors are in direct contact with lookout(s) who can see the fire.
    • Communication is established between crews.
    • Rapid access to safety zones is ensured in case fire crosses below crews.
  • Direct attack will be used whenever possible; if not possible, the fireline should be completed between anchor points before being fired out.
  • Fireline will not lie in or adjacent to a chute or chimney.
  • Starting point will be anchored for crews building fireline down from the top.
  • Bottom of the fire will be monitored; if the potential exists for the fire to spread, action will be taken to secure the fire edge.
  • Before carrying fire with you, ensure it can be done safely.

Last Modified / Reviewed:

Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee.


Follow NWCG on Twitter and Facebook

NWCG Latest Announcements

New Job Aids Available: Packing Lists for Wildland Fire Fireline Personnel and Support Staff, J-101 and J-102

Date: December 3, 2024
Contact: NWCG TRAINING

Two new job aids are now available: Packing List for Wildland Fire Fireline Personnel, J-101 and Packing List for Wildland Fire Support Personnel, J-102, should serve as a baseline for items needed on a wildland fire assignment. These lists will help personnel prepare for a 14 to 21-day assignment on the fireline or in a support role.

References:

Job Aid Catalog

NWCG Packing List for Wildland Fire Fireline Personnel, J-101

NWCG Packing List for Wildland Fire Support Staff, J-102

NWCG Equipment Technology Committee Releases Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention

Date: November 14, 2024
Contact: Equipment Technology Committee

The Equipment Technology Committee (ETC) has released Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention. Misaligned toolless fuel caps on Stihl chainsaws have led to recurring fuel spillage, fuel ignition, and burn injuries during wildland fire management operations.

This Safety Warning is intended to highlight the details and recommended procedures for the installation of a Stihl chainsaw toolless fuel cap, as well as how to identify and correct a misaligned, damaged, or broken fuel cap to help prevent fuel spillage.

References:

NWCG Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention

Advertencia de equipos 24-001: Prevención de derrames de la tapa de combustible sin herramientas de la motosierra Stihl

NWCG Alerts

The Incident Position Standards and Next Generation Position Task Book are now available for Equipment Time Recorder (EQTR)

Date: November 13, 2024
Contact: Incident Business Committee

NWCG is excited to announce that the NWCG Incident Position Standards for Equipment Time Recorder, PMS 350-51 and NWCG Position Task Book for Equipment Time Recorder (EQTR), PMS 311-51 are now available.

The Performance Support Package, which for EQTR, includes the Incident Position Standards and Next Generation Position Task Book were developed through the Incident Performance and Training Modernization (IPTM) effort. The Performance Support Package will support trainees, those qualified in the position, and evaluators.

References:

NWCG Equipment Time Recorder Position Page

NWCG Incident Position Standards for Equipment Time Recorder, PMS 350-51

NWCG Position Task Book for Equipment Time Recorder (EQTR), PMS 311-51

The Incident Position Standards and Next Generation Position Task Book are now available for Personnel Time Recorder (PTRC)

Date: November 13, 2024
Contact: Incident Business Committee

NWCG is excited to announce that the NWCG Incident Position Standards for Personnel Time Recorder, PMS 350-53 and NWCG Position Task Book for Personnel Time Recorder (PTRC), PMS 311-53 are now available.

The Performance Support Package, which for PTRC, includes the Incident Position Standards and Next Generation Position Task Book were developed through the Incident Performance and Training Modernization (IPTM) effort. The Performance Support Package will support trainees, those qualified in the position, and evaluators.

References:

NWCG Personnel Time Recorder Position Page

NWCG Incident Position Standards for Personnel Time Recorder, PMS 350-53

NWCG Position Task Book for Personnel Time Recorder (PTRC), PMS 311-53