Skip to main content

Submission of Innovative Ideas

Image
ETC header graphic. photo of firefighter with a hose inset in photo of fire.  Decorative.

Key Points

  • The Innovation Proposal Form must contain:
    • Innovation Proposal
    • Implementation Narrative
    • Safety Narrative
  • The submission of the Innovation Proposal Form may constitute a public disclosure. Please check with the United States Patent and Trademark Office for information and timelines.
  • The Equipment Technology Committee (ETC) or the NWCG partner agencies are not responsible for the cost incurred in the preparation of proposals.
  • Materials submitted to ETC through the Innovation Proposal process may not be returned.
  • Funding for further development of a concept or product is not available through this process.
  • ETC or cooperating agencies may be working on the same or a similar idea already from another individual or organization.

Introduction

This procedure outlines the process for submitting innovative ideas to improve wildland firefighter safety, operating efficiency, and cost reduction. NWCG encourages the submission of innovative ideas or product proposals (collectively, Innovation Proposal) that will contribute to its mission. ETC is chartered under NWCG and is responsible to receive and review these proposals as part of the innovation and program lifecycle process. ETC will review innovative proposals to determine whether the innovation can be practically implemented into wildland fire suppression, prevention, or rehabilitation operations.

Innovative ideas include new technology, significant improvement to existing products or new application of existing technology. Feedback to assist the proponent to develop the concept, idea, or product further will be provided when appropriate. However, this does not imply interest or endorsement of the idea, concept, or product.

Submission of Innovative Proposals

ETC will consider innovation proposals from individuals, organizations, and manufacturers. There are no specific dates for the submission of innovation proposals; however, proposals are only reviewed twice a year. The cutoff dates are March 15 and September 15. Submissions received after the cutoff date will be accepted but not reviewed until after the next cutoff date. Receipt of proposals will be acknowledged via electronic or written communications.

Multiple submissions of an Innovation Proposal to other ETC members or cooperating agency offices are not necessary. This central receipt point is aware of other areas of interest and tries to ensure that each proposal is sent to potentially interested programs.

The proposals will be reviewed fairly and objectively by subject matter experts available to ETC. The proposer will be notified of the results of the review. Correspondence will be sent to the proposer within 60 days after the cut-of date. The proposer will be contacted if more information or time is needed for the response.

The submission of the proposal form constitutes a public disclosure and may affect the application of a patent. Please refer to the United States Patent and Trademark Office for more information. The disclosure of an Idea to ETC does not establish a confidential relationship or obligate ETC and cooperating agencies to treat the idea (or any related materials) as secret or confidential.

What to Submit

Each proposal should be self-contained and written with clarity and thoroughness. The Innovation Proposal, at a minimum, must contain the following items:

  • Innovation Proposal
  • Implementation Narrative
  • Safety Narrative

The Innovation Proposal Form serves as a base document for the proposal.

It is used to assess which program area it is most applicable to. The Innovation Proposal Form is below.

An Implementation and Safety narrative, no more than 500 words, must be included to identify the following:

  • Objectives.
  • Implementation. How the proposed idea could be implemented operationally.
  • Safety and training requirements.

Additional documents such as technical drawings, artist sketches, or product brochures should also be submitted. Concepts must be validated by test results and test methods. Prototypes or product samples may be requested later as part of the evaluation process.

Review Process

The Innovation Proposal document package will be reviewed to determine if further evaluation is warranted. The review panel consists of subject matter experts within the National Technology & Development Program (NTDP) and other cooperating agencies. The review panel will recommend one of the following:

  1. No further action – The proposal does not meet agency needs, is not a new product or application of an existing product, or implementation is beyond the scope of the agency.
  2. Evaluate as part of product lifecycle – The product can be included in a current specification and will be evaluated as part of the lifecycle to improve products covered in that specification.
  3. The proposal meets a need; however, further development beyond the authority of ETC through this program is needed – The proposal may be referred to other programs for consideration if the submitter is looking for funding assistance. Funding for further development of a concept or product is not available through the innovation process.
  4. The proposal has merit; however, more information is needed.

Submissions are reviewed twice annually. Cutoff dates are March 15 and September 15.

Submission Form

  • Receipt of proposals will be acknowledged via electronic or written communications.
  • The submission of the Innovation Proposal Form is entirely voluntary.
  • Multiple submissions are not necessary, your proposal will be shared with other cooperating agencies.

This form is not allowing attachments at this time. Please email your attachments to
NWCG Webmaster BLM_FA_NWCG_Webmaster@blm.gov.

NWCG Latest Announcements

New Job Aids Available: Packing Lists for Wildland Fire Fireline Personnel and Support Staff, J-101 and J-102

Date: December 3, 2024
Contact: NWCG TRAINING

Two new job aids are now available: Packing List for Wildland Fire Fireline Personnel, J-101 and Packing List for Wildland Fire Support Personnel, J-102, should serve as a baseline for items needed on a wildland fire assignment. These lists will help personnel prepare for a 14 to 21-day assignment on the fireline or in a support role.

References:

Job Aid Catalog

NWCG Packing List for Wildland Fire Fireline Personnel, J-101

NWCG Packing List for Wildland Fire Support Staff, J-102

NWCG Equipment Technology Committee Releases Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention

Date: November 14, 2024
Contact: Equipment Technology Committee

The Equipment Technology Committee (ETC) has released Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention. Misaligned toolless fuel caps on Stihl chainsaws have led to recurring fuel spillage, fuel ignition, and burn injuries during wildland fire management operations.

This Safety Warning is intended to highlight the details and recommended procedures for the installation of a Stihl chainsaw toolless fuel cap, as well as how to identify and correct a misaligned, damaged, or broken fuel cap to help prevent fuel spillage.

References:

NWCG Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention

Advertencia de equipos 24-001: Prevención de derrames de la tapa de combustible sin herramientas de la motosierra Stihl

NWCG Alerts

The Incident Position Standards and Next Generation Position Task Book are now available for Equipment Time Recorder (EQTR)

Date: November 13, 2024
Contact: Incident Business Committee

NWCG is excited to announce that the NWCG Incident Position Standards for Equipment Time Recorder, PMS 350-51 and NWCG Position Task Book for Equipment Time Recorder (EQTR), PMS 311-51 are now available.

The Performance Support Package, which for EQTR, includes the Incident Position Standards and Next Generation Position Task Book were developed through the Incident Performance and Training Modernization (IPTM) effort. The Performance Support Package will support trainees, those qualified in the position, and evaluators.

References:

NWCG Equipment Time Recorder Position Page

NWCG Incident Position Standards for Equipment Time Recorder, PMS 350-51

NWCG Position Task Book for Equipment Time Recorder (EQTR), PMS 311-51

The Incident Position Standards and Next Generation Position Task Book are now available for Personnel Time Recorder (PTRC)

Date: November 13, 2024
Contact: Incident Business Committee

NWCG is excited to announce that the NWCG Incident Position Standards for Personnel Time Recorder, PMS 350-53 and NWCG Position Task Book for Personnel Time Recorder (PTRC), PMS 311-53 are now available.

The Performance Support Package, which for PTRC, includes the Incident Position Standards and Next Generation Position Task Book were developed through the Incident Performance and Training Modernization (IPTM) effort. The Performance Support Package will support trainees, those qualified in the position, and evaluators.

References:

NWCG Personnel Time Recorder Position Page

NWCG Incident Position Standards for Personnel Time Recorder, PMS 350-53

NWCG Position Task Book for Personnel Time Recorder (PTRC), PMS 311-53