Skip to main content

LCES – June 26, 1990

This Day in History is a brief summary of a powerful learning opportunity and is not intended to second guess or be judgmental of decisions and actions. Put yourself in the following situation as if you do not know the outcome. What are the conditions? What are you thinking? What are YOU doing?

The afternoon of June 26, 1990, as I knelt beside a dead Perryville firefighter, I made a promise to the best of my ability to help end the needless fatalities, and alleviate the near misses, by focusing on training and operations pertinent to these goals.” Paul Gleason from LCES and Other Thoughts published June 1991.

Note: Gleason had used Lookouts, Communications, Escape Routes, and Safety Zones (LCES) with his crew, the Zig Zag Interagency Hot Shot Crew (IHC), for several years, but it was the Dude Fire fatalities that became the catalyst for LCES to hit the mainstream.

“LCES is just a re-focusing on the essential elements of the FIRE ORDERS. The systems view stresses the importance of the components working together. The LCES system is a result of analyzing fatalities and near misses for over 20 years of active fireline suppression duties. I believe that all firefighters should be given an interconnecting view of Lookout(s), Communications(s), Escape routes, and Safety zone(s).” ~ Paul Gleason

Gleason cites two types of hazards:

  • Subjective hazards are those which one has direct control over (e.g., condition of the equipment, choices and decisions).
  • Objective hazards are a natural part of the environment (e.g., lightning, fire-weakened timber, rolling rocks, entrapment). They cannot be eliminated, and one must either (1) not go into the environment where they exist, or (2) adhere to a procedure where safety from the hazard is assured.

Gleason suggested that LCES is the key to safe procedures in an environment of hazards and that LCES must be established AND communicated to ALL firefighters BEFORE it is needed.


L

Lookouts need to be in a position where both the objective hazard and the firefighters can be seen. Lookouts must be trained to observe the wildland fire environment and to recognize and anticipate changes in fire behavior. When the objective hazard becomes a danger, the lookout relays the information to the firefighters so they can reposition to the safety zone or a safer area.

  • What are the objective hazards that a Lookout is looking for?
  • What are the tools and skills that a good Lookout should possess?
  • Discuss how your crew can utilize a roving Lookout.

C

Communications is the vehicle which delivers the message to the firefighters, alerting them of the approaching hazard. Communication must be prompt and clear.

  • Radios are limited and it is vital to have at least one backup way to quickly communicate information. Identify some options that your crew/team can use as a backup.
  • Discuss how each person on your crew/team has a role and responsibility in recognizing and communicating hazards.
  • Using Communication Responsibilities in the NWCG Incident Response Pocket Guide, (IRPG) PMS 461 (white section),discuss the five communication responsibilities of every firefighter. Identify how your crew/team will translate these ideas into action when working in the field.

E

Escape routes are the paths firefighters take from their current location, in which they are exposed to danger, to an area free from danger. Unlike the other components, there must always be more than one escape route available to the firefighter. With their effectiveness continually changing, escape routes are probably the most elusive component of LCES. As the firefighter works along the fire perimeter, fatigue and spatial separation increase the time required to reach the safety zone. On indirect or parallel firelines, situations become compounded. Unless escape routes have been identified ahead, as well as behind, a firefighter’s retreat may not be possible.

  • Using LCES in the IRPG (Operational Engagement section, green), discuss the qualities of effective escape routes.

S

Safety Zones are planned locations where firefighters may find refuge from danger and where no fire shelter is needed. Fire intensity and topography determine a safety zone’s effectiveness.

  • Activity: Using Safety Zones in the IRPG (Operational Engagement section, green), mark off a safety zone that would be effective for the area you are currently in or often work in. Being able to see just how big an effective safety zone should be can help us chose one quickly in the field.

    (FYI: The Safety Zone guidelines in the IRPG are for no-wind and no-slope conditions. Make necessary adjustments in size to reflect realistic slope and wind.)

6MFS Suggestion Form


Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee
 


Follow NWCG on X and Facebook
 


 

Last Modified / Reviewed:

NWCG Latest Announcements

Leadership Committee IAP Flyer Now Available

Date:  May 8, 2026
Questions? 
Please contact: Leadership Committee

The NWCG Leadership Committee promotes and enables leadership development across the wildland fire service. The committee provides education, training opportunities, and support for leadership innovation and best practices throughout the community.

A new IAP flyer is now available on the committee website, offering an overview of the products, curriculum, and learning opportunities the Leadership Committee develops. This resource is ideal for posting in your office, sharing with new employees, or distributing through your incident management teams to engage new voices in the leadership journey and reinforce a culture of self‑reflection, development, and growth.

References:

Leadership Committee 2026 IAP Flyer

Incident Operations Subcommittee Updates the Next Generation Position Task Book for FFT1

Date:  May 7, 2026
Questions? 
Please contact: Incident Operations Subcommittee

The NWCG Incident Operations Subcommittee (IOSC) has updated the NWCG Position Task Book for Firefighter Type 1 (Squad Boss) (FFT1), PMS 311‑14. The FFT1 Position Task Book transitioned to the Next Generation (Next Gen PTB) format in June 2025 through the Incident Performance and Training Modernization effort. Since then, IOSC has received feedback from the wildland fire community regarding coding for one of the tasks. Task #13 has been updated to include the option of evaluation in a simulation.

See IOSC Memorandum 26‑01: Transition Plan for Implementation of Updates to the NWCG Position Task Book for Firefighter Type 1 (Squad Boss) (FFT1), PMS 311‑14 for more information.

References:

IOSC Memorandum 26-01: Transition Plan for Implementation of Updates to the NWCG Postion Task Book for Firefighter Type 1

NWCG Firefighter Type 1 Squad Boss Position Page 

NEW! S-212, Intermediate Faller (Online) Course Available Now 

Date:  April 23, 2026
Questions? 
Please contact: Hazard Tree and Tree Felling Subcommittee

NWCG is pleased to announce that the new S‑212, Intermediate Faller (Online), course is now available on the Wildland Fire Learning Portal (WFLP). This second course in the series provides students with the knowledge and skills required to perform the duties of an Intermediate Faller (FAL2), as described in the FAL2 Incident Position Description. This course is intended for individuals seeking to advance from Basic Faller (FAL3) to FAL2.

S‑212, Intermediate Faller is a fully online, self‑paced training program consisting of 13 units. Learners will engage with interactive, scenario‑based content designed to progressively build foundational skills and knowledge essential for the FAL2 role.

Students must be qualified as a Basic Faller (FAL3) prior to enrolling in S‑212, Intermediate Faller course.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1, scheduled for January 2027.

References:

S-212 Intermediate Faller (Online)

RMC Memo 26-01: Transition Plan for Implementing Updates to Intermediate Faller (FAL2) Position Qualifications

Intermediate Faller (FAL2) Position Page

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212

New Aircraft Flight Schedule Form, PMS 249

Date:  April 17, 2026
Questions? 
Please contact: National Coordination System Committee

A new publication from the National Coordination System Committee (NCSC) is now available. The NWCG Aircraft Flight Schedule Form, PMS 249, will be used for aviation crews and dispatch to share flight information that is needed for resource tracking, and if needed, for emergency procedures.

For further details, please contact your NCSC representative. 

References:

NCSC Memo 26-01: Implementation of NWCG Aircraft Flight Schedule Form, PMS 249

NWCG Aircraft Flight Schedule Form, PMS 249