Skip to main content

On A Hillside Where Rolling Material Can Ignite Fuel Below

 

Fires can move more quickly uphill. This Watch Out shows rolling logs and debris that are on fire and can ignite fuels below the crew building fireline.

13. On a hillside where rolling material can ignite fuel below. Several firefighters use tools to dig fireline up a steep hill.  Above them, logs and trees are on fire.

13. On a hillside where rolling material can ignite fuel below.

Read about all 18 Watch Out Situations.
 

When firefighters find themselves in Watch Out Situation #13, on a hillside where rolling material can ignite fuel below, they must answer the following questions:

  • Can you locate/construct a line to prevent material from rolling below? What do you call line that catches rolling material?
    • Describe how you would construct this type of line and what factors you would have to consider (e.g., slope, fuels, etc.).
  • Will you get enough warning of rolling material to prevent being hit by it? Who needs to be watching for rolling material? What kinds of warning systems could you establish?
  • Can you see where any material that rolls below you goes and what it does? What can happen when material rolls out of the fire and below you, out of view? What needs to be done to mitigate this danger?
  • Is the area free of large amounts of flashy fuels? Is the area free of chimneys, gullies, and steep slopes?
  • Do you have two escape routes so you can go either way? Talk about where your most likely escape routes and safety zones will be when you are on a hillside where rolling material can ignite fuel below.
  • To reduce the risks:
    • Post lookouts.
    • Consider locating line in a defensible position.
    • Talk about fires in steep terrain where you had material roll out below you and how you dealt with it.

6MFS Suggestion Form


Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee
 


Follow NWCG on X and Facebook
 


 

Last Modified / Reviewed:

NWCG Latest Announcements

Intermediate Faller (FAL2) Position Task Book Update

Date:  July 24, 2026
Questions? 
Please contact: Tree Felling Subcommittee

NWCG Operations Management Committee (OMC) has issued an update to the NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91. To ensure clarity for both trainees and evaluators, the updated FAL2 Position Task Book (PTB) explicitly states who is authorized to sign off on your tasks:

“Evaluators must be qualified as a FAL2, or an Advanced Faller (FAL1).”

If you are currently working out of a previously published version of the FAL2 PTB, you do not need to restart. However, OMC highly encourages you to take the following step to prevent any confusion in the field:

  • Print and replace the updated evaluator information page (page 2) in your current physical PTB.

References:

Intermediate Faller (FAL2) Position Page

RMC Memo 26-01: Transition Plan for Implementing Updates to Intermediate Faller (FAL2) Position Qualifications

NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Date:  July 10, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics/Equipment Management Committee (LMC) has released Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups. This advisory highlights multiple U.S. Forest Service regions reporting front driveline joint failure incidents.

This advisory recommends firefighters and fire managers to: 

  • Follow all Ram-issued inspection, maintenance, and service guidance for front driveline joints. 
  • Consider installing a driveline loop. 
  • Coordinate with fleet managers and service providers to determine the most appropriate driveline loop kit for each pickup.

For further details, please refer to the complete advisory.

References:

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Technical Service Bulletin: 03-002-21

NEW! NWCG Standard Operating Procedures, PMS 900

Date:  July 9, 2026
Questions? 
Please contact: NWCG Staff

NWCG is excited to announce the publication of the NWCG Standard Operating Procedures, PMS 900.

The new publication establishes general, consistent, and uniform standards for conducting business with the National Wildfire Coordinating Group.

References:

NWCG Standard Operating Procedures, PMS 900

Quarter Four Materials for the 2025-2026 Wildland Fire Leadership Campaign Now Available

Date:  July 8, 2026
Questions? 
Please contact: Leadership Development Subcommittee

NWCG is excited to announce that Fourth Quarter materials for the 2025/2026 Wildland Fire Leadership Campaign are now available. This annual initiative offers all students of leadership and wildland fire management an opportunity to engage with essential leadership skills and knowledge needed to lead effectively in dynamic environments.

Quarter Four materials focus on Leadership Level 4: Leader of Leaders (Provide Direction). Leadership Level 4 is where you are setting the conditions for others to do things well, even when you are not present. This quarter focuses on equipping experienced leaders with skills to provide direction, build trust across teams, and foster strong decision making. 

References:

2025/2026 NWCG Leadership Campaign - Leadership Levels

Wildland Fire Leadership Development Program

Leadership Development Subcommittee