Skip to main content

Review and Export Layout

NWCG Committee Realignment Website Updates: Content will continue to be updated over the coming days as we work through final reviews and adjustments, and all publications and products are currently under revision.


Refer to the Map Elements page of GeoOps and review your layout to ensure that all required elements (STANDL SGD) are present and correct.

Export the layout from the Share tab on the ribbon > Export Layout button. Export settings may vary depending on the plotter and driver used. Ensure export of georeference information and font embedding are good practice.

Review the exported layout to ensure it appears as intended, i.e., all fonts display correctly, assignment breaks and labels appear, labels do not overlap, there are no data selections in the map, etc.

If needed, reduce or optimize the size of the exported PDF. This can be done in Adobe Acrobat Pro, Foxit PDF, or with several free online tools. The smaller the file size of the PDF, the faster uploads to and downloads from FTP and/or SharePoint will be for both GISS and firefighters using the products in the Avenza Maps application.

Additional Considerations for Digital-Only Geospatial PDFs

All PDFs exported from ArcGIS are geo-enabled (unless default settings have been modified) and can be used in any software that works with 'GeoPDFs.'

However, creating a Geospatial PDF designed specifically for digital use in an application like Avenza Maps follows a different workflow than creating a traditional paper map since it is not constrained by paper sizes. The Geospatial PDF should be designed with the user's area of interest and map scale in mind first with the "page" size determined second.

Operational needs will dictate the type of Geospatial PDF to be created. Once that determination is made, decide on the base map that best suits that type of map. For example, an IAP map will require topography, while transportation will need a roads layer. Aerial imagery can also be very beneficial for some maps. In some cases, the background on the topographic map can be made transparent and the topo can be displayed on top of aerial imagery.

The appropriate map scale for use on a mobile device also needs to be determined. Typical topo maps should be at 1:24k; aerial imagery may be 1:8k-12k; and a travel map may be 1:50k-100k.

Focus on the map scale the end-user needs to do their job. Since a PDF is a single static image, not a tile cache like a web map, there will be no additional information when a user "zooms in," only what's already there but bigger. This is why the scale is important, if the features, and labels are all sized for 8k, but the map needs to be used at 24k, everything will be far too small.

The last consideration is the “page size.” Since the map is designed for digital use only and not being printed, it does not need to adhere to a standard size. Rather than the paper size, the “page size” is determined by the area of interest and ArcMap/Pro allows you to set a custom page size to cover the area that you need. There is a trade-off between page size, scale, and output file size, so be sure to keep that in mind during this process. The PDF file should be compressed/optimized for easier distribution before being loaded onto devices for use on the fireline.

The map must still have all the standard map elements (STANDL SGD), however, a few modifications are useful. The title, legend, etc. need to be legible, but they don’t have to be large enough to read at a 1:1 scale. Additionally, the amount of white space around the borders can be minimized since there is no risk of a printer cutting it off.

After exporting a map designed primarily for digital consumption, it’s best practice to test the map in the application in which it will be used.

Job Aids

 

Last Modified / Reviewed:

NWCG Latest Announcements

Intermediate Faller (FAL2) Position Task Book Update

Date:  July 24, 2026
Questions? 
Please contact: Tree Felling Subcommittee

NWCG Operations Management Committee (OMC) has issued an update to the NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91. To ensure clarity for both trainees and evaluators, the updated FAL2 Position Task Book (PTB) explicitly states who is authorized to sign off on your tasks:

“Evaluators must be qualified as a FAL2, or an Advanced Faller (FAL1).”

If you are currently working out of a previously published version of the FAL2 PTB, you do not need to restart. However, OMC highly encourages you to take the following step to prevent any confusion in the field:

  • Print and replace the updated evaluator information page (page 2) in your current physical PTB.

References:

Intermediate Faller (FAL2) Position Page

RMC Memo 26-01: Transition Plan for Implementing Updates to Intermediate Faller (FAL2) Position Qualifications

NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Date:  July 10, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics/Equipment Management Committee (LMC) has released Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups. This advisory highlights multiple U.S. Forest Service regions reporting front driveline joint failure incidents.

This advisory recommends firefighters and fire managers to: 

  • Follow all Ram-issued inspection, maintenance, and service guidance for front driveline joints. 
  • Consider installing a driveline loop. 
  • Coordinate with fleet managers and service providers to determine the most appropriate driveline loop kit for each pickup.

For further details, please refer to the complete advisory.

References:

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Technical Service Bulletin: 03-002-21

NEW! NWCG Standard Operating Procedures, PMS 900

Date:  July 9, 2026
Questions? 
Please contact: NWCG Staff

NWCG is excited to announce the publication of the NWCG Standard Operating Procedures, PMS 900.

The new publication establishes general, consistent, and uniform standards for conducting business with the National Wildfire Coordinating Group.

References:

NWCG Standard Operating Procedures, PMS 900

Quarter Four Materials for the 2025-2026 Wildland Fire Leadership Campaign Now Available

Date:  July 8, 2026
Questions? 
Please contact: Leadership Development Subcommittee

NWCG is excited to announce that Fourth Quarter materials for the 2025/2026 Wildland Fire Leadership Campaign are now available. This annual initiative offers all students of leadership and wildland fire management an opportunity to engage with essential leadership skills and knowledge needed to lead effectively in dynamic environments.

Quarter Four materials focus on Leadership Level 4: Leader of Leaders (Provide Direction). Leadership Level 4 is where you are setting the conditions for others to do things well, even when you are not present. This quarter focuses on equipping experienced leaders with skills to provide direction, build trust across teams, and foster strong decision making. 

References:

2025/2026 NWCG Leadership Campaign - Leadership Levels

Wildland Fire Leadership Development Program

Leadership Development Subcommittee