Skip to main content

Kit – Shelter, 20’ Octagon

NFES #:
000549
Category:
Kits
Updated:
Storage and Shelf Life Checks:
None

Initial Inspection/Disposal Criteria

  1. Inspect packing list and instructions. Refer to NWCG National Fire Equipment System Catalog for a complete list of kit components.
    1. Assemble the mainframe and components according to instructions. All locking pins and flex joints should move easily.
    2. Inspect for burrs on all components of mainframe, eve bars, and base bars.
    3. Loosen flex joints and remove burrs as needed.
  2. Inspect and install door. Door should open and close easily.
  3. Inspect roof and wall panels for any tears or rips and repair as needed.
  4. Inspect windows and screens in wall panels. Repair or replace where necessary.
  5. Check for broken welds on key flange, repair by bolting.
  6. Return to stock if shelter was not used, all kit contents are accounted for, and the shelter is clean.
  7. Refurbish kit if the shelter was used or is missing components.
  8. Disposal of complete kits is not recommended. Seek direction from local cache management for specific disposal criteria. Components that are damaged beyond repair should be disposed of and replaced with like items.

Refurbishing Procedures

A. Cleaning

  1. Clean main frame and misc. parts with a damp cloth and mild detergent if necessary.
  2. Clean the roof and wall panels with a mild detergent and water solution. Use a brush to remove hard dirt and grime or high pressure wash. Rinse well.
  3. Air dry completely before repackaging.

B. Repair

  1. Repair or replace any part of the main frame as needed. Bolt key flange.
  2. When dismantling, wipe all component parts with a damp cloth and return to proper container.
  3. Repair any holes, tears or rips as needed.
  4. Ensure that all locking buttons snap into place.
  5. Ensure that the Velcro is dry on all panels before folding and placing in proper container.
  6. Stencil main frame with property number, stencil inside the center roof ring.
  7.  Ensure that all kit components are accounted for prior to repacking.

C. Testing for Performance

  • none

D. Repackaging

  1. Repack according to manufacturer’s instructions and local cache option.
  2. Ensure that installation/assembly instructions are included in package.

 

Reference:

<p>
Replacement parts may be obtained by contacting:<br />
<a href="https://westernshelter.com/">Western Shelter Systems</a><br />
830 Wilson Street<br />
Eugene, OR 97402<br />
Phone: 541–344–7267</p>

<p>
&nbsp;</p>

NWCG Latest Announcements

NWCG Training Catalog now on Wildland Fire Learning Portal

Date: April 25, 2023
Contact: NWCG Training  

The National Wildfire Coordinating Group (NWCG) has migrated the training catalog from the NWCG website to the Wildland Fire Learning Portal (WFLP) as part of our ongoing efforts to streamline processes and improve efficiency. To facilitate this transition, the training catalog remains available on www.nwcg.gov through April 2024.

Starting May 2024, the training catalog will no longer be accessible on www.nwcg.gov. However, you can still access the complete training catalog by logging in as a guest to the WFLP.

References:

Wildland Fire Learning Portal

 

NWCG Website Migration

Date: April 01, 2024
Contact: NWCG Webmaster

The National Wildfire Coordinating Group is thrilled to announce a significant upgrade to https://www.nwcg.gov, involving a comprehensive redesign of over 7,000 web pages. This enhancement is focused on improving user experience. The migration to the new NWCG website will commence on April 2, 2024, starting at noon EST and is expected to take a few hours. 

During the migration period, as the www.nwcg.gov domain-name-location updates across the Internet, you might encounter either the current or the new site depending on your location. We request your patience during this transition. If you are not redirected to the new site by April 3, 2024, we recommend clearing your browser’s cache and refreshing the page.

Please note that while navigating the revamped website, there may be instances of broken links or errors. Our dedicated web migration team has made significant efforts to minimize such issues prior to launch and will promptly address any that arise via use of analytic reports. We value your patience and understanding as we work towards enhancing your overall website experience.

WFSTAR 2023 Year in Review and 2024 Core Component Module Packages Available

Date: March 6, 2024
Contact: Joe Schindel 

The 2023 Fire Year in Review module and 2024 Core Component Module Packages for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) are now available on the NWCG website. The 2024 Core Component Module Package provides all content needed to deliver RT-130.

 

References:

WFSTAR 2023 Fire Year in Review module

WFSTAR 2024 Core Component Module Packages

2024 NWCG Executive Board Annual Letter

Date: March 6, 2024
Contact: NWCG

The NWCG Executive Board is privileged to share with you the 2024 NWCG Executive Board Annual Letter. As we look into the future and navigate an incredibly complex and dynamic environment, we must remain focused on our mission while actively engaging in national conversations regarding numerous wildland fire initiatives. In 2024, we prioritize building upon our successes and committing to continuous improvement. Key priorities and considerations for this year include: 

  • Determining Core Workload
  • Ensuring Incident Performance and Training Modernization (IPTM) Success
  • Improving Efficiencies
  • Firefighter Health and Wellness
  • Engagement in National Conversations

Together we will continue to make significant strides in the challenging and vital work that lies ahead. 

 

References:

2024 NWCG Executive Board Annual Letter