Hear excerpts from Bear Divide Foreman Cliff Johnson's interview:  audio file (mp3), transcript.

El Cariso Regional Park was established by the County of Los Angeles in honor of the hotshot crewmembers who were entrapped on the 1966 Loop Fire. This is a good location to begin a Staff Ride as it is easy to find, has good parking capacity, and provides an excellent perspective of the site from the monument.

The Loop Fire started at 0519 on November 1, 1966, from a faulty electrical line at the U.S. Army's Los Pinetos Nike Missile Site. This facility is approximately 1 mile north of Contractors Point. The fire burned downhill in a southwesterly direction under the influence of 40 to 60 mile per hour Santa Ana winds. Contractors Point was a key anchor point on this east flank of the fire, which was designated as Division A. Suppression efforts in Division A on the morning of November 1st were focused on protecting the missile facility and establishing a control line south from that facility toward Contractors Point.

See travel map above.

See fire perimeter map above.

The entrance to the park is well marked. It will be a right turn if traveling north on Hubbard Street. The actual monument is all the way to the back of the parking area.

The entrance to the park is well marked. It will be a right turn if traveling north on Hubbard Street. The actual monument is to the back of the parking area.

When viewing the San Gabriel Mountains from the park, one gains an appreciation for the extreme terrain over which the Loop Fire burned.  Contractors Point is the high point of the ridge just behind the tree on the left. The south point of the ridge is clearly visible in the center.

When viewing the San Gabriel Mountains from the park, one gains an appreciation for the extreme terrain over which the Loop Fire burned.
Contractors Point is the high point of the ridge just behind the tree on the left. The south point of the ridge is clearly visible in the center.

 
El Cariso Hotshots: Photo of Crew 1 taken in October 1966.

El Cariso Hotshots: Photo of crew 1 taken in October 1966.

El Cariso Hotshots: Photo of Crew 2 taken in October 1966.

El Cariso Hotshots: Photo of crew 2 taken in October 1966.

 
 
Location (SRS)
POINT (-118.4175779 34.3169761)

NWCG Latest Announcements

2025 Paul Gleason Award Winners Announced

Date:  August 13, 2026
Questions? 
Please contact: Leadership Development Subcommittee

The NWCG Qualifications Management Committee (QMC) and Leadership Development Subcommittee (LDSC) are proud to announce the recipients of the 2025 Paul Gleason "Lead By Example" awards. Award categories include Initiative and Innovation, Mentoring and Teamwork, and Motivation and Vision.

Congratulations to the awardees:

  • Hunter Bell, U.S. Forest Service — Initiative and Innovation
  • Shannon Deane, U.S. Wildland Fire Service— Initiative and Innovation
  • Chris Delaney, U.S. Wildland Fire Service — Motivation and Vision
  • Sean Peterson, U.S. Forest Service — Mentoring and Teamwork

References:

Paul Gleason Lead By Example Award

Wildland Fire Leadership Development Program (WFLDP)

Leadership Development Subcommittee

LMC Equipment Bulletin 26-001: Aquatic Invasive Species – Seasonal Reminder for Mussels

Date:  July 30, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics and Equipment Management Committee (LMC) issued Equipment Bulletin 26-001: Aquatic Invasive Species - Seasonal Reminder for Mussels, reminding the wildland fire community that aquatic mussels continue to be a problem. Mussels rapidly colonize hard and soft surfaces, including aquatic plants and fire equipment, clogging pipes, fouling motors, disrupting water systems, and impacting native species.

To help prevent their spread, fire personnel must follow the decontamination procedures outlined in the NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444. Additionally, report any sightings immediately to your Lead Resource Advisor and include clear, close-up photos (with a pen or your hand for size reference) and location details.”

Read the complete LMC Equipment Bulletin 26-001, to learn more. 

References:

NWCG Alerts

LMC Equipment Bulletin 26-001: Aquatic Invasive Species - Seasonal Reminder for Mussels

NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444

Intermediate Faller (FAL2) Position Task Book Update

Date:  July 24, 2026
Questions? 
Please contact: Tree Felling Subcommittee

NWCG Operations Management Committee (OMC) has issued an update to the NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91. To ensure clarity for both trainees and evaluators, the updated FAL2 Position Task Book (PTB) explicitly states who is authorized to sign off on your tasks:

“Evaluators must be qualified as a FAL2, or an Advanced Faller (FAL1).”

If you are currently working out of a previously published version of the FAL2 PTB, you do not need to restart. However, OMC highly encourages you to take the following step to prevent any confusion in the field:

  • Print and replace the updated evaluator information page (page 2) in your current physical PTB.

References:

Intermediate Faller (FAL2) Position Page

RMC Memo 26-01: Transition Plan for Implementing Updates to Intermediate Faller (FAL2) Position Qualifications

NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Date:  July 10, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics/Equipment Management Committee (LMC) has released Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups. This advisory highlights multiple U.S. Forest Service regions reporting front driveline joint failure incidents.

This advisory recommends firefighters and fire managers to: 

  • Follow all Ram-issued inspection, maintenance, and service guidance for front driveline joints. 
  • Consider installing a driveline loop. 
  • Coordinate with fleet managers and service providers to determine the most appropriate driveline loop kit for each pickup.

For further details, please refer to the complete advisory.

References:

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Technical Service Bulletin: 03-002-21