Skip to main content

Stand 2 - The Ponderosa Pine

Submitted by Anonymous (not verified) on

When the first firefighters arrived, the fire was about 1 ½ -acres in size and was centered in Stand 2's general location. The fire was spreading slowly uphill against the wind and moderately in all other directions. The head of the fire was possibly along the north side spreading toward the confluence of Cart and Spruce Creeks. Hatch took two firefighters with him and walked partway up the slope to a point near the origin of the fire and began building a fireline along the edge of the fire uphill to the west. One helitack crewmember was left at H-1 to receive personnel and Helitack Foreman Black set up a helibase at Cedar Springs Lagoon.

Tom Plasky and Dave Strantz were placed on the fire at 1300 and joined Hatch's squad. The strategy at this point was to build a line along the southeast flank of the fire uphill and then swing northwest to cut it off before it reached the ridge top. As the flame lengths were ½- to 1½-foot high, the squad worked a direct line with one foot in the black. The helicopter returned to Dutch John Airport for a load of tools and water. In the meantime, the fire had burned downhill far enough that the original landing area (helispot) had to be moved east. This new landing area is referred to as H-2. The exact location of H-1 and H-2 is not known but must have been between Stand 2 and Spruce Creek. The tools and water were dropped at H-2.

Barry Sheakley and John Uphoff arrived over the fire at 1340, and Sheakley requested a recon of the fire so he could assess the situation. Recognizing the desirability of heading off the fire at the ridge top, Sheakley had the pilot place Uphoff and himself on the ridge above the point where Hatch and his squad were building line. Sheakley established voice contact with Hatch and they discussed the situation. Sheakley and Uphoff began to build a separate indirect and unanchored section line along the ridge line to the west. Hatch sent Plasky and Strantz up to assist Sheakley in building this line. Karen Coleman, Yolanda Jenkins, and Dwight Hodgkinson were delivered to H-2 at 1350. These three firefighters left H-2 and began walking uphill to join Hatch's squad.

This is the locked gate at the dirt road turnoff from Highway 191. Travel down the dirt road to the foot bridge across Cart Creek in order to get to Stand 2.

This is the locked gate at the dirt road turnoff from Highway 191. Travel down the dirt road to the footbridge across Cart Creek to get to Stand 2.

View of the site from near the point of origin.

View of the site from near the point of origin.

 
Location (SRS)
POINT (-109.43925 40.8907667)

NWCG Latest Announcements

WFSTAR 2026 Core Components Module Package and 2025 Fire Year in Review Now Available

Date:  March 23, 2026
Questions? 
Please contact: Joe Schindel

The 2026 Core Components Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2025 Fire Year in Review are now available on the NWCG website. The 2026 Core Components Module Package provides all content needed to deliver RT-130.

References:

2026 Core Components Module Package

2025 Fire Year in Review Module

NEW! S-490, Advanced Fire Behavior Calculations (Blended) Available Now

Date:  March 17, 2026
Questions? 
Please contact: Fire Behavior Subcommittee

NWCG is pleased to announce that the new S-490, Advanced Fire Behavior Calculations (Blended), 2026 course is now available.

This training includes performance-based activities that allow students to apply the knowledge and concepts required for the Fire Behavior Analyst (FBAN), Long Term Fire Analyst (LTAN), and Prescribed Fire Burn Boss Type 1 (RXB1) positions. It supports individuals working towards these incident qualifications.

This blended course begins with a self-paced online training (OLT) in the Wildland Fire Learning Portal (WFLP), followed by an in-person instructor-led training (ILT).

References:

S-490, Advanced Fire Calculations (Blended)

NWCG Fire Behavior Analyst (FBAN) Position Page

NWCG Long Term Fire Analyst (LTAN) Position Page

NWCG Prescribed Fire Burn Boss Type 1 (RXB1) Position Page

2024 Paul Gleason Award Winners Announced

Date:  March 13, 2026
Questions? 
Please contact: Leadership Committee

The NWCG Leadership Committee is proud to announce the recipients of the 2024 Paul Gleason "Lead By Example" awards. Award categories include Initiative and Innovation, Mentoring and Teamwork, Motivation and Vision, as well as a Lifetime Achievement Award.

Congratulations to the awardees:

  • Justin Baxter, National Unmanned Aerial System (UAS) Operations Specialist, with the U.S. Forest Service — Initiative and Innovation
  • Kelly Woods, Director of the Wildland Firefighting Lessons Learned Center — Mentoring and Teamwork
  • Doug Booster, Instructor, ProHealth Net, Inc. — Motivation and Vision
  • Pam McDonald, Writer-Editor for the National Interagency Fire Center — Lifetime Achievement Award

References:

Paul Gleason Lead By Example Award

Wildland Fire Leadership Development Program (WFLDP)

Leadership Committee

NEW! S-231, Engine Boss Course Available Now

Date:  March 6, 2026
Questions? 
Please contact: Incident Operations Subcommittee

NWCG is pleased to announce the new S-231, Engine Boss (Single Resource) course is now available on the Wildland Fire Learning Portal (WFLP). Developed through the Incident Performance and Training Modernization (IPTM) effort, this training supports individuals working towards Engine Boss, Single Resource (ENGB) incident qualifications. 

This is a performance-based instructor-led training (ILT) that focuses on the application of ENGB responsibilities during wildland fire operations, emphasizing readiness, information gathering, risk management, engine tactics, and Wildland Urban Interface (WUI) operations. Trainees apply these skills through scenario-based group work and an optional field day that reinforces hands-on engine operation tasks. 

References:

S-231, Engine Boss (Single Resource) (Instructor-led)

NWCG Engine Boss, Single Resource (ENGB) Position Page

Wildland Fire Learning Portal