Skip to main content

Stand 4 - Entrapment Site

Submitted by Anonymous (not verified) on
Deployment site with fatality markers and shelter deployment markers in place.

Deployment site with fatality markers and shelter deployment markers in place.

As the Perryville crew noticed the fire moving above them, they also saw that the Navajo Scouts crew was running past them and yelling to "get out". Everyone began to run towards the Control Road. The Perryville crew became separated into an upper and lower group, the lower group being closer to the Control Road. Several crewmembers had trouble with equipment such as chaps falling down and difficulty removing fusees. The upper portion of the crew was cut off when the fire crossed the dozer line below them. Those cut off were forced to move back up the canyon. The cut off crewmembers struggled to deploy their fire shelters.

At this location, 11 Perryville crewmembers were entrapped resulting in six fatalities. At the time of the fire, this canyon was full of closely spaced Ponderosa Pine trees limiting the view of the surrounding area. The existing jeep trail in the canyon bottom had just been bladed by a dozer for use as a control line.

Walk Moore Canyon immediately following the fire showing the height and density of the trees at the time of the fire.

Walk Moore Canyon immediately following the fire showing the height and density of the trees at the time of the fire.

Looking up Walk Moore Canyon at the deployment site immediately following the fire.

Looking up Walk Moore Canyon at the deployment site immediately following the fire.

 
Location (SRS)
POINT (-111.2321167 34.37815)

NWCG Latest Announcements

ETC Equipment Bulletin: 25-003 Flame-Resistant Shirt Survey

Date: June 12, 2025
Questions?  Please contact:
Equipment Technology Committee

The U.S. Forest Service National Technology and Development Program (NTDP) is seeking input on the Forest Service-designed flame-resistant (FR) shirt, currently available through the National Interagency Support Cache system and FedMall.

NTDP is conducting a product review to improve future FR shirt designs. As part of this effort, a short survey is now open for federal employees who have worn any of three recent FR shirt models. Feedback will guide design improvements to better meet the needs of wildland firefighters.

To comply with the Paperwork Reduction Act, responses are limited to federal employees. The survey is open through September 12, 2025. 

References:

NWCG Alerts

ETC Equipment Bulletin: 25-003

NEW! S-130, Firefighter Training (Blended) Now Available

Date: June 10, 2025
If you have questions, please visit our FAQ page. 
If your question is not answered there, you can 
submit your question using our Contact Us form. 
 

The S-130, Firefighter Training (Blended), equips new wildland firefighters with essential skills through a mix of online learning and hands-on training. The course features a required online component and an instructor-led exercise, reinforcing online concepts with practical performance-based training.

The course builds competencies in wildland fire operations, safety, and equipment use, applicable across various operational environments. Both the online component and instructor-led field exercise must be completed to receive a certificate of completion. Students are required to finish the prerequisite S-190, Introduction to Wildland Fire Behavior, before enrolling in S-130, Firefighter Training (Blended).

References:

S-130, Firefighter Training (Blended)

S-190, Introduction to Wildland Fire Behavior

Wildland Fire Learning Portal

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

Date: June 3, 2025
Questions?  Please contact:
Emergency Medical Committee

The Emergency Medical Committee has issued interim guidance for Rapid Extraction Module Support (REMS) teams. Until further notice, Type I and II REMS teams must designate a team leader qualified at Firefighter Type 1 Squad Boss (FFT1) or higher. This temporary change replaces the Single Resource Boss (SRB) requirement, which is currently not feasible due to administrative barriers.

This memorandum does not include any other changes to the NWCG Standards for Rapid Extraction Module Support, PMS 552. This interim change takes effect immediately and will remain in place until further notice.

References:

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

NWCG Standards for Rapid Extraction Module Support, PMS 552

Equipment Bulletin 25-002: Chaps, Chain Saw, M-2020, Nonconformities Affecting Use, Appearance, and Serviceability

Date: June 2, 2025
Questions?  Please contact:
Equipment Technology Committee

The Equipment Technology Committee issued Equipment Bulletin: 25-002 to address a manufacturing nonconformity affecting Forest Service specification, 6170-4K Chain Saw Chaps. The issue applies to chaps manufactured in 2024 and 2025 and distributed through FedMall. These chaps may have incorrectly bound edges that expose inner protective layers.

Independent purchasers should inspect all chain saw chaps received from FedMall beginning in 2024, prior to use. Review the full Equipment Bulletin: 25-002 for inspection criteria and recommended actions.

References:

NWCG Alerts

ETC Equipment Bulletin: 25-002