Stand 2 - Contractors Point

Submitted by Anonymous (not verified) on

By mid day, the north flank of the fire had been contained along the Santa Clara Fuelbreak up to Contractors Point. With the exception of a few minor slopovers, the east flank of the fire was holding along the ridge to a point 40 chains south of Contractors Point (Stand 3). The Chilao Hotshot crew, two Los Angeles County crews, and several tankers (engines) were working a large slopover near Contractors Point. At 1200 the Dalton Hotshot crew on-scene at Contractors Point and were assigned by Division Boss William Westmoreland to build direct handline south from the Chilao crew along this east flank of the fire. At about 1300 the Del Rosa Hotshot Crew arrived, and Westmoreland directed them to work down the ridge ahead of the Dalton crew. At 1430 the El Cariso Hotshot crew arrived on-scene. Line Boss Hugh Masterson briefed El Cariso Superintendent Gordon King. Masterson's instructions were to "leap-frog the Del Rosa crew and to cold trail the fire edge if possible." He also mentioned that "the main ridge could be used as an alternate if impossible to follow the burned edge."

See the southeast flank topo map with NAD 27 GPS locations for stands shown, above.

Photo of Dalton Superintendent Chuck Hartley

Hear excerpts from Dalton Superintendent Chuck Hartley's interview:  audio file (mp3), transcript.

View looking toward the south point of the ridge from Contractors Point. Notice the break in the chamise brush field. This indicates the location of the fireline as it progressed south from Contractors Point during the late morning and early afternoon. The fireline was mostly built by dozers between the missile facility and Contractors Point. From Contractors Point south, handline was required.

View looking toward the south point of the ridge from Contractors Point. Notice the break in the chamise brush field. This indicates the location of the fireline as it progressed south from Contractors Point during the late morning and early afternoon. The fireline was mostly built by dozers between the missile facility and Contractors Point. From Contractors Point south, handline was required.

 
Loop Canyon is the major drainage looking down and to the west from Contractors Point. This is the drainage where the fire made its initial downhill run.

Loop Canyon is the major drainage looking down and to the west from Contractors Point. This is the drainage where the fire made its initial downhill run.

Typical Angeles National Forest front country brush and terrain looking east from Contractors Point.

Typical Angeles National Forest front country brush and terrain looking east from Contractors Point.

 
Location (SRS)
POINT (-118.41 34.342131)

NWCG Latest Announcements

ETC/RMC Safety Bulletin: 25-001 New Guidance on Laundering Wildland Fire Clothing to Reduce Contamination

Date: Aug 8, 2025
Questions? Please contact:
Equipment Technology Committee
 Risk Management Committee

The Equipment Technology Committee (ETC) and the Risk Management Committee (RMC) have issued Safety Bulletin 25-001: Laundering to Decontaminate Wildland Fire Clothing. Recent research revealed that wildland fire flame-resistant pants and shirts can be contaminated with chemicals from combustion byproducts, including carcinogens, and that common laundering practices can effectively remove these harmful contaminants from wildland firefighter clothing more effectively than previously understood. It is recommended to decontaminate wildland fire clothing as frequently as possible. 

Frequently Asked Questions about this new information and how to implement recommendations can be found on the NWCG Alerts page. Read the complete ETC/RMC Safety Bulletin: 25-001 to learn more. 

References:

NWCG Alerts

ETC Safety Bulletin: 25-001

Frequently Asked Questions (FAQ) on Laundering to Decontaminate Wildland Fire Clothing

Equipment Technology Committee

Risk Management Committee

FAQ Now Available for Archiving Type 1 and Type 2 Incident Positions

Date: Aug 6, 2025
Questions? Please contact:
Incident and Position Standards Committee

To support the transition to Complex Incident Management (CIM), NWCG will archive all Type 1 and Type 2 Command and General Staff (C&G) position qualifications in January 2026, as outlined in NWCG Executive Board Memo 25-002. To assist with this transition, a new Frequently Asked Questions (FAQ) document is now available.

This resource answers common questions about the status of Type 1 and Type 2 qualifications, impacts to incident qualification management, training requirements, and resource ordering considerations. Review the full FAQ to learn more.

For additional information on CIM and the transition of C&G positions, see NWCG Executive Board Memos 23-005, 24-005, and 25-002, as well as the Incident Workforce and Development Group webpage.

References:

NWCG Type 1 & Type 2 Position Archiving FAQ

NWCG Executive Board Correspondence

Incident Workforce Development Group

Incident and Position Standards Committee

Incident Position Standards and the Next Generation Position Task Books Now Available for UASD, UASM, UASL and UASP

Date: July 31, 2025
Questions?  Please contact:
Interagency Fire Unmanned Aircraft Systems Subcommittee
 

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Books are now available for all four Unmanned Aircraft Systems positions:

  • Unmanned Aircraft Systems, Data Specialist (UASD)
  • Unmanned Aircraft Systems, Manager (UASM)
  • Unmanned Aircraft Systems, Module Leader (UASL)
  • Unmanned Aircraft Systems Pilot (UASP)

The Performance Support Packages for these positions were developed as part of the Incident Performance and Training Modernization effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1, scheduled for January 2026.

References:

NWCG Unmanned Aircraft Systems, Data Specialist Position Page

NWCG Unmanned Aircraft Systems, Manager Position Page

NWCG Unmanned Aircraft Systems, Module Leader Position Page

NWCG Unmanned Aircraft Systems Pilot Position Page

Incident Position Standards and the Next Generation Position Task Books Now Available for RADO and INCM

Date: July 30, 2025
Questions?  Please contact:
Incident Logistics Subcommittee
 

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Books are now available for Radio Operator (RADO) and Incident Communications Center Manager (INCM).

The Performance Support Packages for these positions were developed as part of the Incident Performance and Training Modernization effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1, scheduled for January 2026.

References:

NWCG Radio Operator Position Page

NWCG Incident Communications Center Manager Position Page