Skip to main content

Stand 3 - The Pep Talk

Submitted by Anonymous (not verified) on
Photo of Raymond Gabica, ranch hand

Interview excerpts from Raymond Gabica, ranch hand that helped initial attack the fire:  audio file (mp3), transcript.

Tippin's squad crossed the saddle from Rock Creek heading east up a dry drainage. The McConnell Trail parallels this drainage leading up to the fire. They stopped and took short breaks several times as they hiked up toward the fire. They left one person at Rock Creek as a water boy. As they progressed up the trail, four squad members fell behind. Sometime between 1515 and 1530, Tippin and five of his squad reached the ridge at the head of the dry drainage. The fire was backing down the ridge to the north of this location. It is here that Tippin gave his tactical briefing, described by survivors as the "Pep Talk". He delivered his briefing before the four other squad members reached his location. Within seconds of finishing or during his briefing the wind abruptly shifted from the west to the east and increased to more than 40 miles per hour. They were now directly in the path of the oncoming head fire. He gave the order to begin walking back to the truck. The four squad members who were still hiking up saw Tippin and party hiking back toward them. They immediately turned around and began running back toward the truck. Tippin gives an order not to run and "save your breath for the fatal moment." Tippin then hears the roar of the fire, turns and looks again; he then gives the order to run. As they dropped down into the drainage the fire outflanks them on the ridgetops and heavy smoke hinders their orientation.

See the topo map with fire progression and stand locations, above.

Above Stand 3, looking west down the dry drainage that Tippin's squad hiked up.

Above Stand 3, looking west down the dry drainage that Tippin's squad hiked up.

Typical of the fuel conditions that were present in the area prior to 1939.

Typical of the fuel conditions that were present in the area before 1939.

 
Location (SRS)
POINT (-117.735 41.5502667)

NWCG Latest Announcements

2025 Paul Gleason Award Winners Announced

Date:  August 13, 2026
Questions? 
Please contact: Leadership Development Subcommittee

The NWCG Qualifications Management Committee (QMC) and Leadership Development Subcommittee (LDSC) are proud to announce the recipients of the 2025 Paul Gleason "Lead By Example" awards. Award categories include Initiative and Innovation, Mentoring and Teamwork, and Motivation and Vision.

Congratulations to the awardees:

  • Hunter Bell, U.S. Forest Service — Initiative and Innovation
  • Shannon Deane, U.S. Wildland Fire Service— Initiative and Innovation
  • Chris Delaney, U.S. Wildland Fire Service — Motivation and Vision
  • Sean Peterson, U.S. Forest Service — Mentoring and Teamwork

References:

Paul Gleason Lead By Example Award

Wildland Fire Leadership Development Program (WFLDP)

Leadership Development Subcommittee

LMC Equipment Bulletin 26-001: Aquatic Invasive Species – Seasonal Reminder for Mussels

Date:  July 30, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics and Equipment Management Committee (LMC) issued Equipment Bulletin 26-001: Aquatic Invasive Species - Seasonal Reminder for Mussels, reminding the wildland fire community that aquatic mussels continue to be a problem. Mussels rapidly colonize hard and soft surfaces, including aquatic plants and fire equipment, clogging pipes, fouling motors, disrupting water systems, and impacting native species.

To help prevent their spread, fire personnel must follow the decontamination procedures outlined in the NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444. Additionally, report any sightings immediately to your Lead Resource Advisor and include clear, close-up photos (with a pen or your hand for size reference) and location details.”

Read the complete LMC Equipment Bulletin 26-001, to learn more. 

References:

NWCG Alerts

LMC Equipment Bulletin 26-001: Aquatic Invasive Species - Seasonal Reminder for Mussels

NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444

Intermediate Faller (FAL2) Position Task Book Update

Date:  July 24, 2026
Questions? 
Please contact: Tree Felling Subcommittee

NWCG Operations Management Committee (OMC) has issued an update to the NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91. To ensure clarity for both trainees and evaluators, the updated FAL2 Position Task Book (PTB) explicitly states who is authorized to sign off on your tasks:

“Evaluators must be qualified as a FAL2, or an Advanced Faller (FAL1).”

If you are currently working out of a previously published version of the FAL2 PTB, you do not need to restart. However, OMC highly encourages you to take the following step to prevent any confusion in the field:

  • Print and replace the updated evaluator information page (page 2) in your current physical PTB.

References:

Intermediate Faller (FAL2) Position Page

RMC Memo 26-01: Transition Plan for Implementing Updates to Intermediate Faller (FAL2) Position Qualifications

NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Date:  July 10, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics/Equipment Management Committee (LMC) has released Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups. This advisory highlights multiple U.S. Forest Service regions reporting front driveline joint failure incidents.

This advisory recommends firefighters and fire managers to: 

  • Follow all Ram-issued inspection, maintenance, and service guidance for front driveline joints. 
  • Consider installing a driveline loop. 
  • Coordinate with fleet managers and service providers to determine the most appropriate driveline loop kit for each pickup.

For further details, please refer to the complete advisory.

References:

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Technical Service Bulletin: 03-002-21