Skip to main content

coyote tactics

Submitted by Anonymous (not verified) on

A progressive line construction duty involving self-sufficient crews which build fire line until the end of the operational period, remain at or near the point while off duty, and begin building fireline the next operational period where they left off.

span of control

Submitted by Anonymous (not verified) on

The number of subordinates for which a supervisor is responsible, usually expressed as the ratio of supervisors to individuals. The optimum ratio is five-to-one.

cloudy

Submitted by Anonymous (not verified) on

Adjective class representing the degree to which the sky is obscured by clouds. In weather forecast terminology, expected cloud cover of about 0.7 or more warrants use of this term. In the National Fire Danger Rating System, 0.6 or more cloud cover is termed "cloudy."

held line

Submitted by Anonymous (not verified) on

All control line that still contains the fire when mopup is completed. Excludes lost line, natural barriers not backfired, and unused secondary lines.

PM10

Submitted by Anonymous (not verified) on

Particulate matter of mass median aerodynamic diameter (MMAD) less than or equal to 10 micrometers.

Subscribe to

NWCG Latest Announcements