Skip to main content

PMS 448

Mat, Sleeping – 3/8” x 23 5/8” x 74 ¾”, Polyethylene

NFES #
001566
Category
Camp
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Visually inspect for exposure to bodily fluids, any cuts, splits, tears, holes or cracks, cleanliness or the presence of foreign matter. Inspect for uniformity in material; if it contains large voids or inclusions. Note: Tie straps are not a requirement for serviceability.  Remove singular tie straps or straps that are damaged.
  2. Return to stock if item is in clean serviceable condition with no signs of soiling, use, or damage.
  3. Refurbish if item is easily cleaned and in serviceable condition.
  4. Dispose of item if item has been exposed to bodily fluids, contains cut or damage, voids, inclusions, or the presence of foreign matter that cannot be removed through cleaning.

Refurbishing Procedures

A.Cleaning

  1. If mat is wet, wash with a mild detergent, expose to sun or other heat source until dry.
  2. If mat is dry, brush with stiff-bristle brush to eliminate dirt or other foreign matter.
  3. Blow off remaining dust or fine dirt particles with high-pressure air hose or vacuum.
  4. Disinfect with mild detergent and air dry.

B. Repair

  • None

C. Testing for performance

  • None

D. Repackaging

  • Repack 50 each in original carton (if serviceable) or use NFES #008213  Carton – Fiberboard 76" X 24 1/2" X 21 1/2"

 

NWCG Latest Announcements

Incident Position Standards and Next Generation Position Task Book Available for Firing Boss, Single Resource

Date: April 30, 2025
Questions?  Please contact:
Fuels Management Committee

NWCG is excited to announce that the NWCG Incident Position Standards for Firing Boss, Single Resource, PMS 350-105, and the NWCG Position Task Book for Firing Boss, Single Resource (FIRB), PMS 311-105, are now available. 

These resources, part of the Performance Support Package developed through the Incident Performance and Training Modernization (IPTM) effort, support trainees, qualified personnel, and evaluators. 

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

 

References:

NWCG Firing Boss, Single Resource Position Page

NWCG Incident Position Standards for Firing Boss, Single Resource, PMS 350-105

NWCG Position Task Book for Firing Boss, Single Resource (FIRB), PMS 311-105

Incident Position Standards and Next Generation Position Task Book Available for Helicopter Crewmember

Date: April 28, 2025
Questions?  Please contact:
Interagency Helicopter Operations Subcommittee

NWCG is excited to announce that the NWCG Incident Position Standards for Helicopter Crewmember, PMS 350-22, and the NWCG Position Task Book for Helicopter Crewmember (HECM), PMS 311-22, are now available.

These resources, part of the Performance Support Package developed through the Incident Performance and Training Modernization (IPTM) effort, support trainees, qualified personnel, and evaluators.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Incident Position Standards for Helicopter Crewmember, PMS 350-22

NWCG Incident Position Standards for Helicopter Crewmember, PMS 350-22

NWCG Position Task Book for Helicopter Crewmember (HECM), PMS 311-22

Updated NWCG Standards for Fire Unmanned Aircraft Systems Operations, PMS 515

Date: April 23, 2025
Questions?  Please contact:
Interagency Fire Unmanned Aircraft Systems Subcommittee

The NWCG Standards for Fire Unmanned Aircraft Systems Operations, PMS 515 standardizes processes and procedures for the interagency use of Unmanned Aircraft Systems (UAS), including pilot inspections and approvals. This updated publication provides the aviation community with standards to ensure UAS are used safely, effectively, and efficiently in support of fire management goals and objectives.

References:

NWCG Standards for Fire Unmanned Aircraft Systems Operations, PMS 515

NWCG National Interagency Aviation Committee

ETC Bulletin 25-001: Retrofitted Hot/Cold Beverage Kits - 2025 Field Season

Date: April 16, 2025
Questions?  Please contact:
Equipment Technology Committee

Due to spout failures and the associated risk of burn injuries, manufacturers have retrofitted the Hot/Cold Beverage Kits using a heat-shrinking band to secure the black spout at the insertion site. The updated kits feature a fluorescent label on each full kit assembly for easy identification. Catering units are encouraged to confirm the clear heat-shrinking bands are intact around each spout before filling.

ETC Bulletin 24-001 regarding Hot/Cold Beverage Kits has been archived and replaced by ETC Bulletin 25-001 for the 2025 season.

References:

NWCG Alerts

ETC-EB-25-001 Retrofitted Hot/Cold Beverage Kits