Skip to main content

PMS 448

Flight Suit – Chest Size 46, Inseam 28 1/2” (S)

NFES #
000546
Category
Clothing
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for holes, cuts, tears, burns, or torn seams. Inspect hook and pile fastener missing or that does not provide adequate closure, repair or dispose of. Inspect for broken zippers or missing a sliders. Open and close the hook and pile fasteners to ensure they provide an adequate and secure closure. Open and close zipper to ensure smooth operations and secure closures.
  2. Return to stock if item is clean and all components are in good working condition
  3. Refurbish if cleaning is the only refurbishment required.
  4. Dispose of item if any damage is found in the inspection process.

Refurbishing Procedures

A. Cleaning

  1. Follow the cleaning procedures described in the publication, Nomex®- Aramid Fiber -Laundering Guide (H71603).
    Additional information can be obtained by calling DuPont at 1–800–453–8527 or by writing:
    DuPont Advanced Fibers Systems
    Chestnut Run Plaza
    Laurel Run Building
    Wilmington, DE 19880-0705
  2. Abbreviated washing procedures from above publication:
    1. “Garments of NOMEX® should be washed separately from other articles to avoid contamination with lint of flammable fibers.”
    2. “Tests show that formulations designed for use at a temperature of 140 °F (60 °C) or less – such as high-surfactant, low-alkalinity products – adequately clean NOMEX® and provide the best fabric color retention.”
    3. “For heavily stained and oily garments of NOMEX®, a higher temperature wash formula may be required for adequate cleaning.”
    4. “Garments made of NOMEX® must be adequately rinsed to remove residual wash chemicals.”
    5. “In some instances, tumble dry conditioning is the only finishing necessary for garments of NOMEX®.”
    6. “…dry cleaning is an alternative method of removing heavy soil and may be preferable to repeated high-temperature washing.”
  3. If items are taken to vendor laundry facilities for refurbishment; ensure that they receive a copy of this refurbishment standard. The laundry facility must satisfy both – the requirements as set by the manufacturer specification and the agreement made with the local agency.

B. Repairs

  • None

C. Test for performance

  • None

D. Repackaging

  • Local cache option

 

NWCG Latest Announcements

NEW! S-130, Firefighter Training (Blended) Now Available

Date: June 10, 2025
If you have questions, please visit our FAQ page. 
If your question is not answered there, you can 
submit your question using our Contact Us form. 
 

The S-130, Firefighter Training (Blended), equips new wildland firefighters with essential skills through a mix of online learning and hands-on training. The course features a required online component and an instructor-led exercise, reinforcing online concepts with practical performance-based training.

The course builds competencies in wildland fire operations, safety, and equipment use, applicable across various operational environments. Both the online component and instructor-led field exercise must be completed to receive a certificate of completion. Students are required to finish the prerequisite S-190, Introduction to Wildland Fire Behavior, before enrolling in S-130, Firefighter Training (Blended).

References:

S-130, Firefighter Training (Blended)

S-190, Introduction to Wildland Fire Behavior

Wildland Fire Learning Portal

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

Date: June 3, 2025
Questions?  Please contact:
Emergency Medical Committee

The Emergency Medical Committee has issued interim guidance for Rapid Extraction Module Support (REMS) teams. Until further notice, Type I and II REMS teams must designate a team leader qualified at Firefighter Type 1 Squad Boss (FFT1) or higher. This temporary change replaces the Single Resource Boss (SRB) requirement, which is currently not feasible due to administrative barriers.

This memorandum does not include any other changes to the NWCG Standards for Rapid Extraction Module Support, PMS 552. This interim change takes effect immediately and will remain in place until further notice.

References:

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

NWCG Standards for Rapid Extraction Module Support, PMS 552

Equipment Bulletin 25-002: Chaps, Chain Saw, M-2020, Nonconformities Affecting Use, Appearance, and Serviceability

Date: June 2, 2025
Questions?  Please contact:
Equipment Technology Committee

The Equipment Technology Committee issued Equipment Bulletin: 25-002 to address a manufacturing nonconformity affecting Forest Service specification, 6170-4K Chain Saw Chaps. The issue applies to chaps manufactured in 2024 and 2025 and distributed through FedMall. These chaps may have incorrectly bound edges that expose inner protective layers.

Independent purchasers should inspect all chain saw chaps received from FedMall beginning in 2024, prior to use. Review the full Equipment Bulletin: 25-002 for inspection criteria and recommended actions.

References:

NWCG Alerts

ETC Equipment Bulletin: 25-002

2024 Wildland Fire Emergency Medical Service Awards

Date: May 22, 2025
Questions?  Please contact:
Emergency Medical Committee

The NWCG Emergency Medical Committee (EMC) is proud to announce the recipients of the 2024 Wildland Fire Emergency Medical Service Awards. Each year, EMC recognizes individuals and groups who have demonstrated exceptional actions or accomplishments that go above and beyond their normal mission or job duties.

Congratulations to all the awardees and nominees. Through leadership and initiative, they have made significant contributions to the safety and well-being of the wildland fire community. These honors are well deserved.

References:

2024 Wildland Fire EMS Awards

NWCG Emergency Medical Committee