Skip to main content

PMS 448

Kit – Coffee Heating

NWCG Committee Realignment Website Updates: Content will continue to be updated over the coming days as we work through final reviews and adjustments, and all publications and products are currently under revision.

NFES #
000480
Category
Kits
Updated
Storage and Shelf Life Checks
None

Initial Inspection Disposal Criteria

  1. Visually inspect kit components. Kit component list is found in the NWCG National Fire Equipment System Catalog.
  2. Inspect for missing or damaged O-rings on faucet.
  3. Inspect for damage or cracking to hose line. Ensure that threaded pipe fittings inside the burner have been welded completely around. If not, have work done by a certified welder.
  4. Return to stock if kit is complete, has not been used or damaged, and is clean.
  5. Refurbish if initial inspection indicates kit was used or if components are missing or damaged.
  6. Dispose of bad hose lines, badly bent stove, urn, lid, and broken faucets.

Refurbishing Procedures

A. Cleaning

  1. Clean heater components. Repaint if necessary with high-temperature paint.
  2. Clean with soap and water and disinfect urn, basket, bucket, lid, and faucets.

B. Repair

  1. All welding should be completed by a certified welder.
  2. Replace hose lines as necessary.
  3. Replace damaged or missing O-rings as necessary.

C. Testing for Performance

  1. Have a fire extinguisher in working area prior to testing burner performance.
  2. Connect stove and all fittings to propane source.
  3. Turn on tank with burner valve in “OFF” position.
  4. Check all fittings and connections for gas leaks using mild soap and water solution. NEVER INSPECT FOR LEAKS USING A MATCH OR ANY OTHER TYPE OF FLAME. Should a gas leak occur, shut off the gas supply to the burner immediately and wait a minimum of five minutes before repairing the leak.
  5. Once fuel line assembly is free of leaks, light burner and make sure it is operable.
  6. Reference the refurbishment standards for the inspection, testing and cleaning of propane tanks.
  7. Concerns and questions regarding propane fittings, regulators, and propane tanks should be directed to an authorized liquid propane gas service representative.

D. Repackaging

  • Package one kit in NFES #000500 carton (22” x 22” x 36”).

 

Reference

OPD Valves

 

NWCG Latest Announcements

LMC Equipment Bulletin 26-001: Aquatic Invasive Species – Seasonal Reminder for Mussels

Date:  July 30, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics and Equipment Management Committee (LMC) issued Equipment Bulletin 26-001: Aquatic Invasive Species - Seasonal Reminder for Mussels, reminding the wildland fire community that aquatic mussels continue to be a problem. Mussels rapidly colonize hard and soft surfaces, including aquatic plants and fire equipment, clogging pipes, fouling motors, disrupting water systems, and impacting native species.

To help prevent their spread, fire personnel must follow the decontamination procedures outlined in the NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444. Additionally, report any sightings immediately to your Lead Resource Advisor and include clear, close-up photos (with a pen or your hand for size reference) and location details.”

Read the complete LMC Equipment Bulletin 26-001, to learn more. 

References:

NWCG Alerts

LMC Equipment Bulletin 26-001: Aquatic Invasive Species - Seasonal Reminder for Mussels

NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444

Intermediate Faller (FAL2) Position Task Book Update

Date:  July 24, 2026
Questions? 
Please contact: Tree Felling Subcommittee

NWCG Operations Management Committee (OMC) has issued an update to the NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91. To ensure clarity for both trainees and evaluators, the updated FAL2 Position Task Book (PTB) explicitly states who is authorized to sign off on your tasks:

“Evaluators must be qualified as a FAL2, or an Advanced Faller (FAL1).”

If you are currently working out of a previously published version of the FAL2 PTB, you do not need to restart. However, OMC highly encourages you to take the following step to prevent any confusion in the field:

  • Print and replace the updated evaluator information page (page 2) in your current physical PTB.

References:

Intermediate Faller (FAL2) Position Page

RMC Memo 26-01: Transition Plan for Implementing Updates to Intermediate Faller (FAL2) Position Qualifications

NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Date:  July 10, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics/Equipment Management Committee (LMC) has released Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups. This advisory highlights multiple U.S. Forest Service regions reporting front driveline joint failure incidents.

This advisory recommends firefighters and fire managers to: 

  • Follow all Ram-issued inspection, maintenance, and service guidance for front driveline joints. 
  • Consider installing a driveline loop. 
  • Coordinate with fleet managers and service providers to determine the most appropriate driveline loop kit for each pickup.

For further details, please refer to the complete advisory.

References:

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Technical Service Bulletin: 03-002-21

NEW! NWCG Standard Operating Procedures, PMS 900

Date:  July 9, 2026
Questions? 
Please contact: NWCG Staff

NWCG is excited to announce the publication of the NWCG Standard Operating Procedures, PMS 900.

The new publication establishes general, consistent, and uniform standards for conducting business with the National Wildfire Coordinating Group.

References:

NWCG Standard Operating Procedures, PMS 900