Skip to main content

PMS 448

Kit – Coffee Heating

NFES #
000480
Category
Kits
Updated
Storage and Shelf Life Checks
None

Initial Inspection Disposal Criteria

  1. Visually inspect kit components. Kit component list is found in the NWCG National Fire Equipment System Catalog.
  2. Inspect for missing or damaged O-rings on faucet.
  3. Inspect for damage or cracking to hose line. Ensure that threaded pipe fittings inside the burner have been welded completely around. If not, have work done by a certified welder.
  4. Return to stock if kit is complete, has not been used or damaged, and is clean.
  5. Refurbish if initial inspection indicates kit was used or if components are missing or damaged.
  6. Dispose of bad hose lines, badly bent stove, urn, lid, and broken faucets.

Refurbishing Procedures

A. Cleaning

  1. Clean heater components. Repaint if necessary with high-temperature paint.
  2. Clean with soap and water and disinfect urn, basket, bucket, lid, and faucets.

B. Repair

  1. All welding should be completed by a certified welder.
  2. Replace hose lines as necessary.
  3. Replace damaged or missing O-rings as necessary.

C. Testing for Performance

  1. Have a fire extinguisher in working area prior to testing burner performance.
  2. Connect stove and all fittings to propane source.
  3. Turn on tank with burner valve in “OFF” position.
  4. Check all fittings and connections for gas leaks using mild soap and water solution. NEVER INSPECT FOR LEAKS USING A MATCH OR ANY OTHER TYPE OF FLAME. Should a gas leak occur, shut off the gas supply to the burner immediately and wait a minimum of five minutes before repairing the leak.
  5. Once fuel line assembly is free of leaks, light burner and make sure it is operable.
  6. Reference the refurbishment standards for the inspection, testing and cleaning of propane tanks.
  7. Concerns and questions regarding propane fittings, regulators, and propane tanks should be directed to an authorized liquid propane gas service representative.

D. Repackaging

  • Package one kit in NFES #000500 carton (22” x 22” x 36”).

 

Reference

OPD Valves

 

NWCG Latest Announcements

Incident Position Standards and Next Generation Position Task Book Available for Firing Boss, Single Resource

Date: April 30, 2025
Questions?  Please contact:
Fuels Management Committee

NWCG is excited to announce that the NWCG Incident Position Standards for Firing Boss, Single Resource, PMS 350-105, and the NWCG Position Task Book for Firing Boss, Single Resource (FIRB), PMS 311-105, are now available. 

These resources, part of the Performance Support Package developed through the Incident Performance and Training Modernization (IPTM) effort, support trainees, qualified personnel, and evaluators. 

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

 

References:

NWCG Firing Boss, Single Resource Position Page

NWCG Incident Position Standards for Firing Boss, Single Resource, PMS 350-105

NWCG Position Task Book for Firing Boss, Single Resource (FIRB), PMS 311-105

Incident Position Standards and Next Generation Position Task Book Available for Helicopter Crewmember

Date: April 28, 2025
Questions?  Please contact:
Interagency Helicopter Operations Subcommittee

NWCG is excited to announce that the NWCG Incident Position Standards for Helicopter Crewmember, PMS 350-22, and the NWCG Position Task Book for Helicopter Crewmember (HECM), PMS 311-22, are now available.

These resources, part of the Performance Support Package developed through the Incident Performance and Training Modernization (IPTM) effort, support trainees, qualified personnel, and evaluators.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Incident Position Standards for Helicopter Crewmember, PMS 350-22

NWCG Incident Position Standards for Helicopter Crewmember, PMS 350-22

NWCG Position Task Book for Helicopter Crewmember (HECM), PMS 311-22

Updated NWCG Standards for Fire Unmanned Aircraft Systems Operations, PMS 515

Date: April 23, 2025
Questions?  Please contact:
Interagency Fire Unmanned Aircraft Systems Subcommittee

The NWCG Standards for Fire Unmanned Aircraft Systems Operations, PMS 515 standardizes processes and procedures for the interagency use of Unmanned Aircraft Systems (UAS), including pilot inspections and approvals. This updated publication provides the aviation community with standards to ensure UAS are used safely, effectively, and efficiently in support of fire management goals and objectives.

References:

NWCG Standards for Fire Unmanned Aircraft Systems Operations, PMS 515

NWCG National Interagency Aviation Committee

ETC Bulletin 25-001: Retrofitted Hot/Cold Beverage Kits - 2025 Field Season

Date: April 16, 2025
Questions?  Please contact:
Equipment Technology Committee

Due to spout failures and the associated risk of burn injuries, manufacturers have retrofitted the Hot/Cold Beverage Kits using a heat-shrinking band to secure the black spout at the insertion site. The updated kits feature a fluorescent label on each full kit assembly for easy identification. Catering units are encouraged to confirm the clear heat-shrinking bands are intact around each spout before filling.

ETC Bulletin 24-001 regarding Hot/Cold Beverage Kits has been archived and replaced by ETC Bulletin 25-001 for the 2025 season.

References:

NWCG Alerts

ETC-EB-25-001 Retrofitted Hot/Cold Beverage Kits