Skip to main content

PMS 448

Kit – Coffee Heating

NFES #
000480
Category
Kits
Updated
Storage and Shelf Life Checks
None

Initial Inspection Disposal Criteria

  1. Visually inspect kit components. Kit component list is found in the NWCG National Fire Equipment System Catalog.
  2. Inspect for missing or damaged O-rings on faucet.
  3. Inspect for damage or cracking to hose line. Ensure that threaded pipe fittings inside the burner have been welded completely around. If not, have work done by a certified welder.
  4. Return to stock if kit is complete, has not been used or damaged, and is clean.
  5. Refurbish if initial inspection indicates kit was used or if components are missing or damaged.
  6. Dispose of bad hose lines, badly bent stove, urn, lid, and broken faucets.

Refurbishing Procedures

A. Cleaning

  1. Clean heater components. Repaint if necessary with high-temperature paint.
  2. Clean with soap and water and disinfect urn, basket, bucket, lid, and faucets.

B. Repair

  1. All welding should be completed by a certified welder.
  2. Replace hose lines as necessary.
  3. Replace damaged or missing O-rings as necessary.

C. Testing for Performance

  1. Have a fire extinguisher in working area prior to testing burner performance.
  2. Connect stove and all fittings to propane source.
  3. Turn on tank with burner valve in “OFF” position.
  4. Check all fittings and connections for gas leaks using mild soap and water solution. NEVER INSPECT FOR LEAKS USING A MATCH OR ANY OTHER TYPE OF FLAME. Should a gas leak occur, shut off the gas supply to the burner immediately and wait a minimum of five minutes before repairing the leak.
  5. Once fuel line assembly is free of leaks, light burner and make sure it is operable.
  6. Reference the refurbishment standards for the inspection, testing and cleaning of propane tanks.
  7. Concerns and questions regarding propane fittings, regulators, and propane tanks should be directed to an authorized liquid propane gas service representative.

D. Repackaging

  • Package one kit in NFES #000500 carton (22” x 22” x 36”).

 

Reference

OPD Valves

 

NWCG Latest Announcements

NEW! S-130, Firefighter Training (Blended) Now Available

Date: June 10, 2025
If you have questions, please visit our FAQ page. 
If your question is not answered there, you can 
submit your question using our Contact Us form. 
 

The S-130, Firefighter Training (Blended), equips new wildland firefighters with essential skills through a mix of online learning and hands-on training. The course features a required online component and an instructor-led exercise, reinforcing online concepts with practical performance-based training.

The course builds competencies in wildland fire operations, safety, and equipment use, applicable across various operational environments. Both the online component and instructor-led field exercise must be completed to receive a certificate of completion. Students are required to finish the prerequisite S-190, Introduction to Wildland Fire Behavior, before enrolling in S-130, Firefighter Training (Blended).

References:

S-130, Firefighter Training (Blended)

S-190, Introduction to Wildland Fire Behavior

Wildland Fire Learning Portal

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

Date: June 3, 2025
Questions?  Please contact:
Emergency Medical Committee

The Emergency Medical Committee has issued interim guidance for Rapid Extraction Module Support (REMS) teams. Until further notice, Type I and II REMS teams must designate a team leader qualified at Firefighter Type 1 Squad Boss (FFT1) or higher. This temporary change replaces the Single Resource Boss (SRB) requirement, which is currently not feasible due to administrative barriers.

This memorandum does not include any other changes to the NWCG Standards for Rapid Extraction Module Support, PMS 552. This interim change takes effect immediately and will remain in place until further notice.

References:

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

NWCG Standards for Rapid Extraction Module Support, PMS 552

Equipment Bulletin 25-002: Chaps, Chain Saw, M-2020, Nonconformities Affecting Use, Appearance, and Serviceability

Date: June 2, 2025
Questions?  Please contact:
Equipment Technology Committee

The Equipment Technology Committee issued Equipment Bulletin: 25-002 to address a manufacturing nonconformity affecting Forest Service specification, 6170-4K Chain Saw Chaps. The issue applies to chaps manufactured in 2024 and 2025 and distributed through FedMall. These chaps may have incorrectly bound edges that expose inner protective layers.

Independent purchasers should inspect all chain saw chaps received from FedMall beginning in 2024, prior to use. Review the full Equipment Bulletin: 25-002 for inspection criteria and recommended actions.

References:

NWCG Alerts

ETC Equipment Bulletin: 25-002

2024 Wildland Fire Emergency Medical Service Awards

Date: May 22, 2025
Questions?  Please contact:
Emergency Medical Committee

The NWCG Emergency Medical Committee (EMC) is proud to announce the recipients of the 2024 Wildland Fire Emergency Medical Service Awards. Each year, EMC recognizes individuals and groups who have demonstrated exceptional actions or accomplishments that go above and beyond their normal mission or job duties.

Congratulations to all the awardees and nominees. Through leadership and initiative, they have made significant contributions to the safety and well-being of the wildland fire community. These honors are well deserved.

References:

2024 Wildland Fire EMS Awards

NWCG Emergency Medical Committee