Skip to main content

PMS 448

Fence – Barricade, Plastic, 4’ X 100’

NFES #
000608
Category
Kits
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Visually inspect for damage, tears, rips, dirt, grease, oil or paint. Inspect for length, if less than 100’ splicing may be required following refurbishment procedures. There should be no more than four splices in a 100’ section of fencing using fencing of similar style and pattern.
  2. Return to stock if item is in clean serviceable condition with four or less splices and minimal torn fence sections.
  3. Refurbish if item is repairable and easily cleaned.
  4. Dispose of item if sections are less than 50’ with previous spliced sections, if there is excessive damage, or shows paint, oil, or soiling that cannot be easily removed.

Refurbishing Procedures

A. Cleaning

  • Clean by sweeping or with high-pressure wash; or clean with mild detergent using a brush or scouring pad.

B. Repair

  1. Replace damage barricade section by splicing.
  2. Splice using small cable ties or small hog rings one top, one bottom, and one every 6 inches to ensure splice security; up to four splices of same type and pattern for each 100’ barricade fence.

C. Testing for performance

  • None

D. Repackaging

  • Re-roll and secure.

 

NWCG Latest Announcements

RMC Memorandum 26-02: SAFENET Modernization and SafeNetX Launch

Date:  June 25, 2026
Questions? 
Please contact: Risk Management Committee

The Risk Management Committee (RMC) is pleased to announce the launch of SafeNetX, the modernized safety reporting system now available to the wildland fire community. Effective June 15, 2026, SafeNetX enables reporting of unsafe, unhealthy, near-miss, and high-risk operations across wildland fire, all-hazard incidents, training, and related work environments.

SafeNetX is the result of a multi-agency modernization effort led by RMC, which began evaluating improvements to the legacy SAFENET system in 2021. To learn more, read the full RMC memorandum in the links provided.

References:

SafeNetX

RMC Safety Memorandum 26-02: SAFENET Modernization and SafeNet X Launch

2025 Wildland Fire EMS Awards

Date:  June 12, 2026
Questions? 
Please contact: Emergency Medical Committee

The NWCG Emergency Medical Committee (EMC) announces the recipients of the 2025 Wildland Fire Emergency Medical Service (EMS) Awards. EMC annually recognizes individuals and groups who have demonstrated outstanding actions or accomplishments that are above and beyond the expectation of one’s normal mission or job duties.

Congratulations to all the awardees and nominees. Through leadership and initiative, they have made significant contributions to the safety of the wildland fire community. These awards are well deserved.

References:

2025 Wildland Fire EMS Awards

Emergency Medical Committee

Incident Position Standards and the Next Generation Position Task Book Now Available for RAMP

Date:  June 12, 2026
Questions? 
Please contact: Airtanker Base Operations Unit

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Book are now available for Ramp Manager (RAMP).

The Performance Support Package for this position was developed as part of the Incident Performance and Training Modernization effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1, scheduled for release in January 2027.

References:

NWCG Ramp Manager Position Page

National Interagency Aviation Committee

Make an Impact: Serve the Wildland Fire Community as an IPTM SME!

Date:  June 11, 2026
Questions? 
Please contact: NWCG SME Specialist

Note: Positions with an * will last approximately 6 months.
Positions with ** will last 12 - 18 months.

NWCG is seeking experienced wildland firefighters and support personnel to serve as Subject Matter Experts (SMEs) for the Incident Performance and Training Modernization (IPTM) initiative. IPTM aims to transition NWCG’s training and qualification system to a performance-based model by updating position descriptions, Incident Position Standards, Next Generation Position Task Books (Next Gen PTBs), and training where needed.

NWCG is currently recruiting SMEs for the Fall 2026 positions listed below:

  • Equipment Manager (EQPM)*
  • Fixed Wing Parking Tender (FWPT)**
  • Mixmaster (MXMS)*
  • Public Information Officer Complex (PIOC)*
  • Retardant Crewmember (RTCM)*
  • Strike Team Leader Crew (STCR)*
  • Strike Team Leader Engine (STEN)*
  • Strike Team Leader Heavy Equipment (STEQ)*
  • Task Force Leader (TFLD)**
  • Wildland Fire Investigator (INVF)** 

Projects begin October 2026. Sign up by July 10, 2026, at the link below and review the attached document for additional details. 

References:

NWCG SME Interest Sign-up

IPTM Subject Matter Expert Duties and Expectations Document

Incident Performance and Training Modernization (IPTM)