Skip to main content

PMS 448

Shelter – Fire, Large (Shelter Only), M2002

NFES #
000973
Category
PPE
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect the following:
    1. Shelter – Do not open polyvinyl liner for inspection. 
      1. Large size fire shelters were not produced until after 2006, so NWCG Equipment Advisory 22-03 does not apply.
      2. Check to ensure that the bag has been modified to include small slits under the pull tabs as per NWCG Equipment Advisory 21-01. Retro fitted bags will have an orange dot sticker on the bag. New bags will have the slits and no sticker.
      3. Inspect polyvinyl bag for cuts, puncture, or torn seams. If the bag has any anomaly that may affect the integrity of the bag or the shelter, remove shelter from service.
      4. Inspect that the red pull rings are unbroken and the quick-opening tear strip is sealed to the bag the entire length and is unbroken. Dispose of shelters with damaged or missing red tear strip.
      5. Look through bag at the shelter for tears in shelter material along seams. If any tears are evident in the shelter material or polyvinyl bag, or if significant gray discoloration of the interior of the polyvinyl bag has obscured interior inspection, remove shelter from service and dispose.
      6. Further inspection should include identifying PVC bags which have unreinforced yellow pull tabs. Per Cache Memo #07-4 “Polyvinyl Bag Retrofit” Some shelters may have a glued webbing reinforcement visible on the PVC bag yellow pull strap. Any shelter lacking webbing reinforcement (glued or stitched) should be removed from service.
      7. Fire shelters with a yellow re-bag label or lacking any label inside of the PVC bag should be removed from service.
  2. Return to stock if item is new or like new, passes inspection, and does not require refurbishment.
  3. Refurbish if item passes inspection but light cleaning is required.
  4. Dispose of item if it fails inspection.
    1. Shelters that show signs of damage can be used as practice shelters. Clearly identify each as PRACTICE ONLY. This item may be used for practice when clearly marked as practice only.

Refurbishing Procedures

A. Cleaning

Do not open polyvinyl liner for refurbishment.

  1. Clean the Shelter with a damp cloth.

B. Repair

  • None

C. Testing for performance

  • None

D. Repackaging

  1. 10 each in  NFES #008072 carton (24" X 12" X 10").

 

NWCG Latest Announcements

NEW! S-130, Firefighter Training (Blended) Now Available

Date: June 10, 2025
If you have questions, please visit our FAQ page. 
If your question is not answered there, you can 
submit your question using our Contact Us form. 
 

The S-130, Firefighter Training (Blended), equips new wildland firefighters with essential skills through a mix of online learning and hands-on training. The course features a required online component and an instructor-led exercise, reinforcing online concepts with practical performance-based training.

The course builds competencies in wildland fire operations, safety, and equipment use, applicable across various operational environments. Both the online component and instructor-led field exercise must be completed to receive a certificate of completion. Students are required to finish the prerequisite S-190, Introduction to Wildland Fire Behavior, before enrolling in S-130, Firefighter Training (Blended).

References:

S-130, Firefighter Training (Blended)

S-190, Introduction to Wildland Fire Behavior

Wildland Fire Learning Portal

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

Date: June 3, 2025
Questions?  Please contact:
Emergency Medical Committee

The Emergency Medical Committee has issued interim guidance for Rapid Extraction Module Support (REMS) teams. Until further notice, Type I and II REMS teams must designate a team leader qualified at Firefighter Type 1 Squad Boss (FFT1) or higher. This temporary change replaces the Single Resource Boss (SRB) requirement, which is currently not feasible due to administrative barriers.

This memorandum does not include any other changes to the NWCG Standards for Rapid Extraction Module Support, PMS 552. This interim change takes effect immediately and will remain in place until further notice.

References:

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

NWCG Standards for Rapid Extraction Module Support, PMS 552

Equipment Bulletin 25-002: Chaps, Chain Saw, M-2020, Nonconformities Affecting Use, Appearance, and Serviceability

Date: June 2, 2025
Questions?  Please contact:
Equipment Technology Committee

The Equipment Technology Committee issued Equipment Bulletin: 25-002 to address a manufacturing nonconformity affecting Forest Service specification, 6170-4K Chain Saw Chaps. The issue applies to chaps manufactured in 2024 and 2025 and distributed through FedMall. These chaps may have incorrectly bound edges that expose inner protective layers.

Independent purchasers should inspect all chain saw chaps received from FedMall beginning in 2024, prior to use. Review the full Equipment Bulletin: 25-002 for inspection criteria and recommended actions.

References:

NWCG Alerts

ETC Equipment Bulletin: 25-002

2024 Wildland Fire Emergency Medical Service Awards

Date: May 22, 2025
Questions?  Please contact:
Emergency Medical Committee

The NWCG Emergency Medical Committee (EMC) is proud to announce the recipients of the 2024 Wildland Fire Emergency Medical Service Awards. Each year, EMC recognizes individuals and groups who have demonstrated exceptional actions or accomplishments that go above and beyond their normal mission or job duties.

Congratulations to all the awardees and nominees. Through leadership and initiative, they have made significant contributions to the safety and well-being of the wildland fire community. These honors are well deserved.

References:

2024 Wildland Fire EMS Awards

NWCG Emergency Medical Committee