Skip to main content

Pump – Portable, Lightweight, 4 Cycle

NWCG Committee Realignment Website Updates: Content will continue to be updated over the coming days as we work through final reviews and adjustments, and all publications and products are currently under revision.

NFES #
006000
Category
Small Engine Equipment
Updated
Storage and Shelf Life Checks
Yes
Storage and Shelf Life Procedure
Date Last Tested (DLT) not to exceed 12 months.

Initial Inspection/Disposal Criteria

  1. Visually inspect for evidence of use (dust, oil, starter seal broken), damage or missing parts.
  2. Return to stock if there is no sign of use or damage and date last tested (DLT) does not exceed 12 months.
  3. Refurbish as necessary if unit has been used or fueled, damaged, or shelf life is exceeded.
  4. Dispose of the unit if it is not economically repairable.

Refurbishment Procedures

A. Cleaning

  1. Remove dirt and oil, using detergent or degreaser as necessary.
  2. Use pressure washer to remove heavy deposits of oil and grease.
  3. Equipment should be serviced and test run as quickly as possible after pressure washing to minimize rust formation on metal parts.

B. Repair

  1. Check for loose and/or missing parts or mounting hardware; tighten or replace as needed.
  2. Check condition of engine oil, spark plug, air filter, and fuel filter; clean or replace as needed.
  3. Inspect power-head (engine) for freeness of all moving parts, ensuring that the crankshaft, piston/cylinder and all engine bearings are not damaged.
  4. Inspect exhaust system; make sure there are no cracks or leaks. Clean spark arrestor of excess carbon build-up, replace screen if damaged.
  5. Ensure all decals (operations and warning) are affixed and legible.
  6. Check to make sure that all gaskets on the pump fittings/adapters are in place and functioning properly.

C. Test for Performance

  1. Refer to the owner’s manual for operations and specifications information specific to pump model. 
  2. Ensure fuel is fresh for running tests.
  3. Ensure recoil starter functions properly. Check for damage or fraying of pull cord; repair or replace as necessary.
  4. Ensure pump packing or mechanical seal is not leaking, repair or replace as necessary.
  5. Should any function fail a test, refer to the manufacturer’s repair manual and troubleshooting guide to correct the problem.
  6. Remove all gasoline from fuel tank and run engine until carburetor is completely empty of gas.
  7. Remove all water from pump end. Grease pump as necessary.

D. Repackaging

  1. Use nylon “zip-tie” to tie off (seal) starter rope to the frame.
  2. Attach certification tag; that indicates date last tested (DLT), property #, and name of individual certifying performance.
  3. Ensure that all identification (property #, serial #, owner ID) is affixed and legible.

 

NWCG Latest Announcements

Intermediate Faller (FAL2) Position Task Book Update

Date:  July 24, 2026
Questions? 
Please contact: Tree Felling Subcommittee

NWCG Operations Management Committee (OMC) has issued an update to the NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91. To ensure clarity for both trainees and evaluators, the updated FAL2 Position Task Book (PTB) explicitly states who is authorized to sign off on your tasks:

“Evaluators must be qualified as a FAL2, or an Advanced Faller (FAL1).”

If you are currently working out of a previously published version of the FAL2 PTB, you do not need to restart. However, OMC highly encourages you to take the following step to prevent any confusion in the field:

  • Print and replace the updated evaluator information page (page 2) in your current physical PTB.

References:

Intermediate Faller (FAL2) Position Page

RMC Memo 26-01: Transition Plan for Implementing Updates to Intermediate Faller (FAL2) Position Qualifications

NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Date:  July 10, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics/Equipment Management Committee (LMC) has released Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups. This advisory highlights multiple U.S. Forest Service regions reporting front driveline joint failure incidents.

This advisory recommends firefighters and fire managers to: 

  • Follow all Ram-issued inspection, maintenance, and service guidance for front driveline joints. 
  • Consider installing a driveline loop. 
  • Coordinate with fleet managers and service providers to determine the most appropriate driveline loop kit for each pickup.

For further details, please refer to the complete advisory.

References:

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Technical Service Bulletin: 03-002-21

NEW! NWCG Standard Operating Procedures, PMS 900

Date:  July 9, 2026
Questions? 
Please contact: NWCG Staff

NWCG is excited to announce the publication of the NWCG Standard Operating Procedures, PMS 900.

The new publication establishes general, consistent, and uniform standards for conducting business with the National Wildfire Coordinating Group.

References:

NWCG Standard Operating Procedures, PMS 900

Quarter Four Materials for the 2025-2026 Wildland Fire Leadership Campaign Now Available

Date:  July 8, 2026
Questions? 
Please contact: Leadership Development Subcommittee

NWCG is excited to announce that Fourth Quarter materials for the 2025/2026 Wildland Fire Leadership Campaign are now available. This annual initiative offers all students of leadership and wildland fire management an opportunity to engage with essential leadership skills and knowledge needed to lead effectively in dynamic environments.

Quarter Four materials focus on Leadership Level 4: Leader of Leaders (Provide Direction). Leadership Level 4 is where you are setting the conditions for others to do things well, even when you are not present. This quarter focuses on equipping experienced leaders with skills to provide direction, build trust across teams, and foster strong decision making. 

References:

2025/2026 NWCG Leadership Campaign - Leadership Levels

Wildland Fire Leadership Development Program

Leadership Development Subcommittee