Skip to main content

Pump – 1½” Multiquip, 5.5 HP

NWCG Committee Realignment Website Updates: Content will continue to be updated over the coming days as we work through final reviews and adjustments, and all publications and products are currently under revision.

NFES #
007647
Category
Small Engine Equipment
Updated
Storage and Shelf Life Checks
Yes
Storage and Shelf Life Procedure
Date Last Tested (DLT) not to exceed 12 months.

Initial Inspection/Disposal Criteria

  1. Visually inspect for evidence of use (dust, oil, starter seal broken), damage or missing parts.
  2. Return to stock if there is no sign of use or damage and date last tested (DLT) does not exceed 12 months.
  3. Refurbish as necessary if unit has been used or fueled, damaged, or shelf life is exceeded.
  4. Dispose of the unit if it is not economically repairable.

Refurbishment Procedures

A. Cleaning

  1. Remove dirt and oil, using detergent or degreaser as necessary.
  2. Use pressure washer to remove heavy deposits of oil and grease.
  3. Equipment should be repaired and tested as quickly as possible after pressure washing to minimize rust formation on metal parts.

B. Repair

  1. Check for loose and/or missing parts or mounting hardware; tighten or replace as needed.
  2. Inspect power-head (engine) for freeness of all moving parts, ensuring that the crankshaft, piston/cylinder and all engine bearings are not damaged.
  3. Check condition of spark plug, air filter, and fuel filter; clean or replace as needed.
  4. Inspect exhaust system; make sure there are no cracks or leaks. Check for loose and/or missing parts and hardware, tighten or replace as needed.
  5. Ensure all decals (operations and warning) are affixed and legible.
  6. Ensure all gaskets on the pump fittings/adapters are in place and functioning properly.

C. Test for Performance

  1. Ensure recoil starter functions properly. Check for damage or fraying of pull cord; repair or replace as necessary.
  2. Engine should start easily, run smoothly, be free from fuel leaks, and provide sufficient power to the pump end.
  3. Ensure engine controls are operational and functional; stop switch, throttle and choke.
  4. Adjust carburetor by setting idle speed to 1200 RPM, Maximum engine speed is 3500 RPM.
  5. Check max PSI with nozzle closed. Minimum pressure: 50 PSI.
  6. Ensure pump packing or mechanical seal is not leaking, repair or replace as necessary.
  7. Should any function fail a test, refer to the manufacturer’s repair manual and troubleshooting guide to correct the problem.
  8. Remove all gasoline from fuel tank and run engine until carburetor is completely empty of gas.
  9. Remove all water from pump end.

D. Repackaging

  1. Use nylon “zip-tie” to tie off (seal) starter rope to the frame.
  2. Attach certification tag that indicates date last tested (DLT), property #, and name of individual certifying performance.
  3. Ensure that all identification (property #, serial #, owner ID) is affixed and legible.

 

NWCG Latest Announcements

NEW! S-420, Intermediate Incident Management Available Now

Date:  October 26, 2026
Questions? 
Please contact: Qualifications Management Committee

NWCG is excited to announce that S-420, Intermediate Incident Management (Instructor-led) is now available on the Wildland Fire Learning Portal! This performance-based course is designed to prepare individuals interested in serving on a Complex Incident Management Team (CIMT).

Prior to attending S-420, students must be qualified as a Type 3 Command and General Staff, Unit Leaders, or Division/Group Supervisor (DIVS). Students will also be required to complete the prerequisite trainings ICS-300, Intermediate Incident Command System (ICS) for Expanding Incidents and one of the following:

  • S-320, Introduction to Incident Management Teams
  • O-305, Type 3 All-Hazards Incident Management Team Introduction
  • H-337, Command and General Staff Functions for Local Incident Management Teams

References:

S-420, Intermediate Incident Management (Instructor-led)

Wildland Fire Learning Portal

Make an Impact: Serve the Wildland Fire Community as an IPTM SME!

Date:  October 23, 2026
Questions? 
Please contact: NWCG SME Specialist

NWCG is seeking experienced wildland firefighters and support personnel to serve as Subject Matter Experts (SMEs) for the Incident Performance and Training Modernization (IPTM) initiative. IPTM aims to transition NWCG’s training and qualification system to a performance-based model by updating position descriptions, Incident Position Standards, Next Generation Position Task Books (Next Gen PTBs), and training where needed.

NWCG is currently recruiting SMEs for the Spring 2027 positions listed below:

  • Finance/Administration Section Chief Complex (FSCC) 
  • Incident Commander Complex (ICCI)
  • Logistics Section Chief Complex (LSCC)
  • Operations Section Chief Complex (OSCC)
  • Planning Section Chief Complex (PSCC)
  • Safety Officer Complex (SOFC)
  • Base/Camp Manager (BCMG)
  • Infrared Interpreter (IRIN)
  • Prescribed Fire Burn Boss Type 1 (RXB1)
  • Situation Unit Leader (SITL)
     

Projects begin mid-January 2027. Sign up by November 15, 2026, at the link below and review the attached document for additional details.

References:

NWCG SME Interest Sign-up

IPTM Subject Matter Expert Duties and Expectations Document

Incident Performance and Training Modernization (IPTM)

Incident Position Standards and the Next Generation Position Task Book Now Available for FOBS

Date:  October 22, 2026
Questions? 
Please contact: Fire Planning Management Committee

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Book are now available for Field Observer (FOBS).

The Performance Support Package for this position was developed as part of the Incident Performance and Training Modernization effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1, scheduled for release in January 2027.

References:

NWCG Field Observer Position Page

Incident Position Standards and the Next Generation Position Task Book Now Available for GISS

Date:  October 22, 2026
Questions? 
Please contact: Integration Management Committee

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Book are now available for Geographic Information System Specialist (GISS).

The Performance Support Package for this position was developed as part of the Incident Performance and Training Modernization effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1, scheduled for release in January 2027.

References:

NWCG Geographic Information System Specialist Position Page