Skip to main content

Stand 5 - The Upper Helispot

Submitted by Anonymous (not verified) on

At the morning briefing on July 17th, the Mormon Lake Hotshots were assigned to improve the line on top, the ridge which was previously worked by the night shift. Line construction was just to the lee side of the slope. Fire shelters were not mandatory equipment for BLM personnel at the time of the fire. The Mormon Lake Hotshots had fire shelters but left them in camp that morning because of their weight - a common practice at the time.

The Mormon Lake Hotshots arrived at the helibase at 0730; due to a series of other priorities, they never reached the upper helispot until about 1100. At this time they began improving the line from the rock bluff back down to the upper helispot.

From their position along the top of the ridge, Mormon Lake Hotshot crewmembers would have seen residual smoke in the 16th Bowl and few smokes along the dozer line from the burnout operation on July 16th.

Fire activity was established in the bottom of the 17th Bowl from the Happy Jack Hotshots' burnout operation. The 17th Bowl mirrors the 16th Bowl in fuel and topography. Suppression actions on July 17th were based on the previous days' fire behavior in the 16th Bowl.

Radios at the time were typically single-channel or had only a few channels. Radios had "crystals" in them and could not be field programmed like today. They were also very expensive and only issued to key personnel. Crew Boss Tony Czak had to carry two radios: one to talk to his crew and a second to talk to overhead.

From the upper helispot looking south, up the slope, evidence of the old fireline can be seen, tying the lee side of the slope to the cliff face. Note the vegetation change of the northeast aspect slopes, large thick stands of aspen.

From the upper helispot looking south, up the slope, evidence of the old fireline can be seen, tying the lee side of the slope to the cliff face. Note the vegetation change of the northeast aspect slopes to large thick stands of aspen.

To the east of the upper helispot, you can see the edge of the Roan Plateau, and in the far distance, the Flat Tops Wilderness and Storm King Mountain. Storm King Mountain was the site of the fatalities which occurred during the South Canyon Fire on Storm King Mountain in 1994.

To the east of the upper helispot, you can see the edge of the Roan Plateau, and in the far distance, the Flat Tops Wilderness and Storm King Mountain. Storm King Mountain was the site of the fatalities which occurred during the South Canyon Fire on Storm King Mountain in 1994.

 
Location (SRS)
POINT (-107.9525167 39.4306833)

NWCG Latest Announcements

2025 Week of Remembrance

Date: June 27, 2025
Questions?  Please contact:
6 Minutes for Safety Subcommittee

As we approach the 2025 Week of Remembrance (WOR), June 30–July 6, we dedicate this time to reflect on the past incidents from 2015 and honor the fallen through learning. Since its inception in 2014, WOR has honored wildland firefighters who made the ultimate sacrifice while encouraging critical discussions that reinforce lessons learned.

Throughout the week, we encourage thoughtful and generative conversations—whether in briefing rooms or at tailgates—that promote a culture of continuous learning and safety.

References:

2025 Week of Remembrance: Letter to Leadership

Wildland Fire Lessons Learned Center

ETC Equipment Bulletin: 25-003 Flame-Resistant Shirt Survey

Date: June 12, 2025
Questions?  Please contact:
Equipment Technology Committee

The U.S. Forest Service National Technology and Development Program (NTDP) is seeking input on the Forest Service-designed flame-resistant (FR) shirt, currently available through the National Interagency Support Cache system and FedMall.

NTDP is conducting a product review to improve future FR shirt designs. As part of this effort, a short survey is now open for federal employees who have worn any of three recent FR shirt models. Feedback will guide design improvements to better meet the needs of wildland firefighters.

To comply with the Paperwork Reduction Act, responses are limited to federal employees. The survey is open through September 12, 2025. 

References:

NWCG Alerts

ETC Equipment Bulletin: 25-003

NEW! S-130, Firefighter Training (Blended) Now Available

Date: June 10, 2025
If you have questions, please visit our FAQ page. 
If your question is not answered there, you can 
submit your question using our Contact Us form. 
 

The S-130, Firefighter Training (Blended), equips new wildland firefighters with essential skills through a mix of online learning and hands-on training. The course features a required online component and an instructor-led exercise, reinforcing online concepts with practical performance-based training.

The course builds competencies in wildland fire operations, safety, and equipment use, applicable across various operational environments. Both the online component and instructor-led field exercise must be completed to receive a certificate of completion. Students are required to finish the prerequisite S-190, Introduction to Wildland Fire Behavior, before enrolling in S-130, Firefighter Training (Blended).

References:

S-130, Firefighter Training (Blended)

S-190, Introduction to Wildland Fire Behavior

Wildland Fire Learning Portal

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

Date: June 3, 2025
Questions?  Please contact:
Emergency Medical Committee

The Emergency Medical Committee has issued interim guidance for Rapid Extraction Module Support (REMS) teams. Until further notice, Type I and II REMS teams must designate a team leader qualified at Firefighter Type 1 Squad Boss (FFT1) or higher. This temporary change replaces the Single Resource Boss (SRB) requirement, which is currently not feasible due to administrative barriers.

This memorandum does not include any other changes to the NWCG Standards for Rapid Extraction Module Support, PMS 552. This interim change takes effect immediately and will remain in place until further notice.

References:

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

NWCG Standards for Rapid Extraction Module Support, PMS 552