Skip to main content

Stand 3 - Helispot 3

Submitted by Anonymous (not verified) on

At 1400, Hodgkinson, Jenkins, and Coleman arrived at the fireline to tie in with Hatch's squad while retardant was being placed on the fire. Hatch felt they were needed in Sheakley's squad; so, he sent them up to tie in with Sheakley, who now had a total of six personnel plus himself. During this time, Dave Noel was organizing crews at Cedar Springs Lagoon. Noel, Ray Purdy, Geary Searfoss, and Darrell Parks were all shuttled in on the first load into H-2, followed by Dave Simpsom, J. Martin, Pat Crevelt, and Carel Jackson.

Martin drew a four-person squad from this group consisting of Crevelt, Searfoss, Simpson, and himself. At Noel's direction, the squad proceeded from H-2 up the slope to tie in with Hatch. Noel had radio contact with Hatch and picked a point where Martin's squad was to build the third section of unanchored line. A second squad was formed but had to wait for one more load of firefighters to be delivered. The next load was delivered to a new Helispot (H-3). At the time, some squad members were unaware of the change from H-2 to H-3, which was moved 65 yards to the southeast. The load consisted of Ray Ruble, Val Norman, Gene Campbell, and Annette Rogers. Purdy was designated as the squad leader of the second squad and was instructed by Noel to begin at the bottom of Martin's line and build line downhill. Purdy's squad headed out, picked up their tools at H-2, and walked across the relatively flat terrain of sagebrush and grass as Noel and Campbell followed about 20 yards behind the last member of the squad.

At 1450, Purdy's squad walked upslope toward the fire and were essentially parallel to the burning edge of the fire. During this time, the helicopter returned to H-3 and dropped off another firefighter, who was to tie in with one of the squads. The helicopter was running low on fuel and lifted off with Helicopter Foreman Black on board to return for fuel.

Photo of Val Norman

Hear Val Norman at Stand 3 describing his experience as a firefighter on the Cart Creek Fire:  audio file (mp3), transcript.

View from H3 looking toward Noel and Campbell fatality sites.

View from H3 looking toward Noel and Campbell fatality sites.

 
Location (SRS)
POINT (-109.4359833 40.89025)

NWCG Latest Announcements

2025 Paul Gleason Award Winners Announced

Date:  August 13, 2026
Questions? 
Please contact: Leadership Development Subcommittee

The NWCG Qualifications Management Committee (QMC) and Leadership Development Subcommittee (LDSC) are proud to announce the recipients of the 2025 Paul Gleason "Lead By Example" awards. Award categories include Initiative and Innovation, Mentoring and Teamwork, and Motivation and Vision.

Congratulations to the awardees:

  • Hunter Bell, U.S. Forest Service — Initiative and Innovation
  • Shannon Deane, U.S. Wildland Fire Service— Initiative and Innovation
  • Chris Delaney, U.S. Wildland Fire Service — Motivation and Vision
  • Sean Peterson, U.S. Forest Service — Mentoring and Teamwork

References:

Paul Gleason Lead By Example Award

Wildland Fire Leadership Development Program (WFLDP)

Leadership Development Subcommittee

LMC Equipment Bulletin 26-001: Aquatic Invasive Species – Seasonal Reminder for Mussels

Date:  July 30, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics and Equipment Management Committee (LMC) issued Equipment Bulletin 26-001: Aquatic Invasive Species - Seasonal Reminder for Mussels, reminding the wildland fire community that aquatic mussels continue to be a problem. Mussels rapidly colonize hard and soft surfaces, including aquatic plants and fire equipment, clogging pipes, fouling motors, disrupting water systems, and impacting native species.

To help prevent their spread, fire personnel must follow the decontamination procedures outlined in the NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444. Additionally, report any sightings immediately to your Lead Resource Advisor and include clear, close-up photos (with a pen or your hand for size reference) and location details.”

Read the complete LMC Equipment Bulletin 26-001, to learn more. 

References:

NWCG Alerts

LMC Equipment Bulletin 26-001: Aquatic Invasive Species - Seasonal Reminder for Mussels

NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444

Intermediate Faller (FAL2) Position Task Book Update

Date:  July 24, 2026
Questions? 
Please contact: Tree Felling Subcommittee

NWCG Operations Management Committee (OMC) has issued an update to the NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91. To ensure clarity for both trainees and evaluators, the updated FAL2 Position Task Book (PTB) explicitly states who is authorized to sign off on your tasks:

“Evaluators must be qualified as a FAL2, or an Advanced Faller (FAL1).”

If you are currently working out of a previously published version of the FAL2 PTB, you do not need to restart. However, OMC highly encourages you to take the following step to prevent any confusion in the field:

  • Print and replace the updated evaluator information page (page 2) in your current physical PTB.

References:

Intermediate Faller (FAL2) Position Page

RMC Memo 26-01: Transition Plan for Implementing Updates to Intermediate Faller (FAL2) Position Qualifications

NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Date:  July 10, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics/Equipment Management Committee (LMC) has released Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups. This advisory highlights multiple U.S. Forest Service regions reporting front driveline joint failure incidents.

This advisory recommends firefighters and fire managers to: 

  • Follow all Ram-issued inspection, maintenance, and service guidance for front driveline joints. 
  • Consider installing a driveline loop. 
  • Coordinate with fleet managers and service providers to determine the most appropriate driveline loop kit for each pickup.

For further details, please refer to the complete advisory.

References:

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Technical Service Bulletin: 03-002-21