Stand 3 - East Ridge of Cerro Grande Peak

Submitted by Anonymous (not verified) on
Photo taken in September 2003 from top of Cerro Grande Peak looking along the east flank toward Los Alamos. Fuels are primarily clump grass with mixed conifer only on the north edge outside the planned burn unit.

Photo was taken in September 2003 from top of Cerro Grande Peak looking along the east flank toward Los Alamos. Fuels are primarily clump grass with mixed conifer only on the north edge outside the planned burn unit.

The modified blackline operation continues down the east flank and completed about 2200. The Burn Boss walks back to the area of the test fire and discovers that the fire had burned through the blackline and burning southwest into the burn unit faster than anticipated. The decision is made to curtail the fire burning towards the west perimeter (Baca Ranch) by burning out the west flank into the saddle.

At 2300, the ignition crew and holding crew return to the test fire area (via Cerro Grande Peak) to complete this operation, while two additional personnel arrive and are assigned to the east flank. Upon successful completion of this operation, the Burn Boss is becoming concerned about the fatigue levels of his personnel. The hand crew plus six NPS employees hike down to the vehicles to rest. The burn plan calls for the Type II crew to be the holding crew during the night operations and once they are released, the remaining NPS personnel become holding resources for the remainder of the night.

The Burn Boss leaves the burn to return to the Bandelier office to begin requesting additional resources.

Photo taken in September 2003 from east flank of Cerro Grande Peak looking southwest. The fuels consist of light grass and more prevalent mixed conifer on the interior portion of the burn.

Photo was taken in September 2003 from the east flank of Cerro Grande Peak looking southwest. The fuels consist of light grass and more prevalent mixed conifer on the interior portion of the burn.

USGS brass marker on the top of Cerro Grande Peak.

USGS brass marker on the top of Cerro Grande Peak.

 
Location (SRS)
POINT (-106.4012 35.8629333)

NWCG Latest Announcements

2025 Paul Gleason Award Winners Announced

Date:  August 13, 2026
Questions? 
Please contact: Leadership Development Subcommittee

The NWCG Qualifications Management Committee (QMC) and Leadership Development Subcommittee (LDSC) are proud to announce the recipients of the 2025 Paul Gleason "Lead By Example" awards. Award categories include Initiative and Innovation, Mentoring and Teamwork, and Motivation and Vision.

Congratulations to the awardees:

  • Hunter Bell, U.S. Forest Service — Initiative and Innovation
  • Shannon Deane, U.S. Wildland Fire Service— Initiative and Innovation
  • Chris Delaney, U.S. Wildland Fire Service — Motivation and Vision
  • Sean Peterson, U.S. Forest Service — Mentoring and Teamwork

References:

Paul Gleason Lead By Example Award

Wildland Fire Leadership Development Program (WFLDP)

Leadership Development Subcommittee

LMC Equipment Bulletin 26-001: Aquatic Invasive Species – Seasonal Reminder for Mussels

Date:  July 30, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics and Equipment Management Committee (LMC) issued Equipment Bulletin 26-001: Aquatic Invasive Species - Seasonal Reminder for Mussels, reminding the wildland fire community that aquatic mussels continue to be a problem. Mussels rapidly colonize hard and soft surfaces, including aquatic plants and fire equipment, clogging pipes, fouling motors, disrupting water systems, and impacting native species.

To help prevent their spread, fire personnel must follow the decontamination procedures outlined in the NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444. Additionally, report any sightings immediately to your Lead Resource Advisor and include clear, close-up photos (with a pen or your hand for size reference) and location details.”

Read the complete LMC Equipment Bulletin 26-001, to learn more. 

References:

NWCG Alerts

LMC Equipment Bulletin 26-001: Aquatic Invasive Species - Seasonal Reminder for Mussels

NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444

Intermediate Faller (FAL2) Position Task Book Update

Date:  July 24, 2026
Questions? 
Please contact: Tree Felling Subcommittee

NWCG Operations Management Committee (OMC) has issued an update to the NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91. To ensure clarity for both trainees and evaluators, the updated FAL2 Position Task Book (PTB) explicitly states who is authorized to sign off on your tasks:

“Evaluators must be qualified as a FAL2, or an Advanced Faller (FAL1).”

If you are currently working out of a previously published version of the FAL2 PTB, you do not need to restart. However, OMC highly encourages you to take the following step to prevent any confusion in the field:

  • Print and replace the updated evaluator information page (page 2) in your current physical PTB.

References:

Intermediate Faller (FAL2) Position Page

RMC Memo 26-01: Transition Plan for Implementing Updates to Intermediate Faller (FAL2) Position Qualifications

NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Date:  July 10, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics/Equipment Management Committee (LMC) has released Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups. This advisory highlights multiple U.S. Forest Service regions reporting front driveline joint failure incidents.

This advisory recommends firefighters and fire managers to: 

  • Follow all Ram-issued inspection, maintenance, and service guidance for front driveline joints. 
  • Consider installing a driveline loop. 
  • Coordinate with fleet managers and service providers to determine the most appropriate driveline loop kit for each pickup.

For further details, please refer to the complete advisory.

References:

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Technical Service Bulletin: 03-002-21