Skip to main content

Stand 2 - Powerline Junction

Submitted by Anonymous (not verified) on

At 0230 the Perryville crew met with Division Supervisor Dale Ashby at the Control Road and Walk Moore Canyon Junction. The crew's assignment was to anchor at the Control Road and construct line up the jeep trail. The crew completed the line on the jeep trail and continued up the power line right-of-way into the Bonita Creek Estates Subdivision.

By 0300 the main fire was within one-quarter mile of the Subdivision structures. The brisk down canyon winds continued to push the fire to approximately 500 acres by 0500. By 0600 the fire was estimated to be 1900 acres.

The Perryville crew and Prescott IHC (Interagency Hotshot Crew) worked in the Subdivision until approximately 0930. By this time the jeep trail in Walk Moore Canyon had been bladed by a dozer, the crew was instructed to improve this line.

From the junction of the power line and Walk Moore Canyon, one can look up the power line through the brush and see the direction the crew began working. At the time of the fire, the hillside consisted of thick Pine trees with a brush and needle-cast understory. Saw work in the dense dog-hair-thicket was slow and finding a place swamp the cut material was tough because of the density of vegetation. The crew's original assignment was to proceed up the jeep trail in the bottom of the canyon, it changed to building line up the power line and around the south and east of the Subdivision.

This is the developed interpretive site/parking area. It is utilized to access Stands 2-4 and has a capacity for approximately 10 vehicles.

This is the developed interpretive site/parking area. It is utilized to access Stands 2-4 and has a capacity for approximately 10 vehicles.

Looking up the handline that was constructed by the Perryville crew in the powerline right-of-way immediately after the fire.

Looking up the handline that was constructed by the Perryville crew in the powerline right-of-way immediately after the fire.

 
The powerline looking in the direction the Perryville crew built line.

The powerline looking in the direction the Perryville crew built line.

Saw team working in the area of Bonita Creek Estates during the Dude Fire – note the vegetation conditions.

Saw team working in the area of Bonita Creek Estates during the Dude Fire – note the vegetation conditions.

 
Location (SRS)
POINT (-111.2336 34.3752667)

NWCG Latest Announcements

ETC Equipment Bulletin: 25-003 Flame-Resistant Shirt Survey

Date: June 12, 2025
Questions?  Please contact:
Equipment Technology Committee

The U.S. Forest Service National Technology and Development Program (NTDP) is seeking input on the Forest Service-designed flame-resistant (FR) shirt, currently available through the National Interagency Support Cache system and FedMall.

NTDP is conducting a product review to improve future FR shirt designs. As part of this effort, a short survey is now open for federal employees who have worn any of three recent FR shirt models. Feedback will guide design improvements to better meet the needs of wildland firefighters.

To comply with the Paperwork Reduction Act, responses are limited to federal employees. The survey is open through September 12, 2025. 

References:

NWCG Alerts

ETC Equipment Bulletin: 25-003

NEW! S-130, Firefighter Training (Blended) Now Available

Date: June 10, 2025
If you have questions, please visit our FAQ page. 
If your question is not answered there, you can 
submit your question using our Contact Us form. 
 

The S-130, Firefighter Training (Blended), equips new wildland firefighters with essential skills through a mix of online learning and hands-on training. The course features a required online component and an instructor-led exercise, reinforcing online concepts with practical performance-based training.

The course builds competencies in wildland fire operations, safety, and equipment use, applicable across various operational environments. Both the online component and instructor-led field exercise must be completed to receive a certificate of completion. Students are required to finish the prerequisite S-190, Introduction to Wildland Fire Behavior, before enrolling in S-130, Firefighter Training (Blended).

References:

S-130, Firefighter Training (Blended)

S-190, Introduction to Wildland Fire Behavior

Wildland Fire Learning Portal

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

Date: June 3, 2025
Questions?  Please contact:
Emergency Medical Committee

The Emergency Medical Committee has issued interim guidance for Rapid Extraction Module Support (REMS) teams. Until further notice, Type I and II REMS teams must designate a team leader qualified at Firefighter Type 1 Squad Boss (FFT1) or higher. This temporary change replaces the Single Resource Boss (SRB) requirement, which is currently not feasible due to administrative barriers.

This memorandum does not include any other changes to the NWCG Standards for Rapid Extraction Module Support, PMS 552. This interim change takes effect immediately and will remain in place until further notice.

References:

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

NWCG Standards for Rapid Extraction Module Support, PMS 552

Equipment Bulletin 25-002: Chaps, Chain Saw, M-2020, Nonconformities Affecting Use, Appearance, and Serviceability

Date: June 2, 2025
Questions?  Please contact:
Equipment Technology Committee

The Equipment Technology Committee issued Equipment Bulletin: 25-002 to address a manufacturing nonconformity affecting Forest Service specification, 6170-4K Chain Saw Chaps. The issue applies to chaps manufactured in 2024 and 2025 and distributed through FedMall. These chaps may have incorrectly bound edges that expose inner protective layers.

Independent purchasers should inspect all chain saw chaps received from FedMall beginning in 2024, prior to use. Review the full Equipment Bulletin: 25-002 for inspection criteria and recommended actions.

References:

NWCG Alerts

ETC Equipment Bulletin: 25-002