Skip to main content

Stand 3 - South Point of Ridge

Submitted by Anonymous (not verified) on

This is shown as Point A in the investigation report photo referred to as Figure 3. El Cariso Superintendent King led his crew to a small bench below this south point of the ridge and held them there until he could determine if it was possible to cold trail the fire edge all the way down. King could see the Los Angeles County dozers and crews working the lower edge of the fire and believed he could tie in with them. At about 1445 Line Boss Masterson requested Division Boss Westmoreland to go down the east flank and make sure the crews were lined out. Westmoreland had a radio and several of the crews did not have radios, including the El Cariso Hotshots. By the time Westmoreland reached the tail end of the El Cariso crew, King had led the first units of his crew well down into the steep rocky chimney staying directly on the fire edge. As a result, King never had a radio exchange or face-to-face meeting with Westmoreland, who was his Division Boss.

See the southeast flank orthophoto map with fire edge shown, above.

Photo of El Cariso Superintendent Gordon King

Hear excerpts from El Cariso Superintendent Gordon King's interview:  audio file (mp3), transcript.

Looking back from Stand 3 along the ridge toward Contractors Point. This was the 40 chains of open fire edge that was assigned to the Dalton and Del Rosa crews.

Looking back from Stand 3 along the ridge toward Contractors Point. This was the 40 chains of open fire edge that was assigned to the Dalton and Del Rosa crews.

 
The direct attack route that the El Cariso crew followed down.

The direct attack route that the El Cariso crew followed down.

The alternate indirect route mentioned by Line Boss Masterson. This ended up being the location of the final control line on this flank.

The alternate indirect route mentioned by Line Boss Masterson. This ended up being the location of the final control line on this flank.

 
Rocks arranged in an 'M' or a 'W' pattern about six feet across can be found location about 100 yards below Stand 3. This is about where the El Cariso crew would have left the ridge and entered into the chimney as they cold-trailed along the fire edge. Division Boss Westmoreland probably caught up with the tail end of the crew in about this location.

Rocks arranged in an 'M' or a 'W' pattern about six feet across can be found about 100 yards below Stand 3. This is about where the El Cariso crew would have left the ridge and entered the chimney as they cold trailed along the fire edge. Division Boss Westmoreland probably caught up with the tail end of the crew in about this location.

Pacoima Reservoir as seen from the vicinity of Stand 3.

Pacoima Reservoir as seen from the vicinity of Stand 3.

 
Location (SRS)
POINT (-118.4 34.334018)

NWCG Latest Announcements

2025 Paul Gleason Award Winners Announced

Date:  August 13, 2026
Questions? 
Please contact: Leadership Development Subcommittee

The NWCG Qualifications Management Committee (QMC) and Leadership Development Subcommittee (LDSC) are proud to announce the recipients of the 2025 Paul Gleason "Lead By Example" awards. Award categories include Initiative and Innovation, Mentoring and Teamwork, and Motivation and Vision.

Congratulations to the awardees:

  • Hunter Bell, U.S. Forest Service — Initiative and Innovation
  • Shannon Deane, U.S. Wildland Fire Service— Initiative and Innovation
  • Chris Delaney, U.S. Wildland Fire Service — Motivation and Vision
  • Sean Peterson, U.S. Forest Service — Mentoring and Teamwork

References:

Paul Gleason Lead By Example Award

Wildland Fire Leadership Development Program (WFLDP)

Leadership Development Subcommittee

LMC Equipment Bulletin 26-001: Aquatic Invasive Species – Seasonal Reminder for Mussels

Date:  July 30, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics and Equipment Management Committee (LMC) issued Equipment Bulletin 26-001: Aquatic Invasive Species - Seasonal Reminder for Mussels, reminding the wildland fire community that aquatic mussels continue to be a problem. Mussels rapidly colonize hard and soft surfaces, including aquatic plants and fire equipment, clogging pipes, fouling motors, disrupting water systems, and impacting native species.

To help prevent their spread, fire personnel must follow the decontamination procedures outlined in the NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444. Additionally, report any sightings immediately to your Lead Resource Advisor and include clear, close-up photos (with a pen or your hand for size reference) and location details.”

Read the complete LMC Equipment Bulletin 26-001, to learn more. 

References:

NWCG Alerts

LMC Equipment Bulletin 26-001: Aquatic Invasive Species - Seasonal Reminder for Mussels

NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444

Intermediate Faller (FAL2) Position Task Book Update

Date:  July 24, 2026
Questions? 
Please contact: Tree Felling Subcommittee

NWCG Operations Management Committee (OMC) has issued an update to the NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91. To ensure clarity for both trainees and evaluators, the updated FAL2 Position Task Book (PTB) explicitly states who is authorized to sign off on your tasks:

“Evaluators must be qualified as a FAL2, or an Advanced Faller (FAL1).”

If you are currently working out of a previously published version of the FAL2 PTB, you do not need to restart. However, OMC highly encourages you to take the following step to prevent any confusion in the field:

  • Print and replace the updated evaluator information page (page 2) in your current physical PTB.

References:

Intermediate Faller (FAL2) Position Page

RMC Memo 26-01: Transition Plan for Implementing Updates to Intermediate Faller (FAL2) Position Qualifications

NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Date:  July 10, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics/Equipment Management Committee (LMC) has released Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups. This advisory highlights multiple U.S. Forest Service regions reporting front driveline joint failure incidents.

This advisory recommends firefighters and fire managers to: 

  • Follow all Ram-issued inspection, maintenance, and service guidance for front driveline joints. 
  • Consider installing a driveline loop. 
  • Coordinate with fleet managers and service providers to determine the most appropriate driveline loop kit for each pickup.

For further details, please refer to the complete advisory.

References:

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Technical Service Bulletin: 03-002-21