Skip to main content

Stand 3 - South Point of Ridge

Submitted by Anonymous (not verified) on

This is shown as Point A in the investigation report photo referred to as Figure 3. El Cariso Superintendent King led his crew to a small bench below this south point of the ridge and held them there until he could determine if it was possible to cold trail the fire edge all the way down. King could see the Los Angeles County dozers and crews working the lower edge of the fire and believed he could tie in with them. At about 1445 Line Boss Masterson requested Division Boss Westmoreland to go down the east flank and make sure the crews were lined out. Westmoreland had a radio and several of the crews did not have radios, including the El Cariso Hotshots. By the time Westmoreland reached the tail end of the El Cariso crew, King had led the first units of his crew well down into the steep rocky chimney staying directly on the fire edge. As a result, King never had a radio exchange or face-to-face meeting with Westmoreland, who was his Division Boss.

See the southeast flank orthophoto map with fire edge shown, above.

Photo of El Cariso Superintendent Gordon King

Hear excerpts from El Cariso Superintendent Gordon King's interview:  audio file (mp3), transcript.

Looking back from Stand 3 along the ridge toward Contractors Point. This was the 40 chains of open fire edge that was assigned to the Dalton and Del Rosa crews.

Looking back from Stand 3 along the ridge toward Contractors Point. This was the 40 chains of open fire edge that was assigned to the Dalton and Del Rosa crews.

 
The direct attack route that the El Cariso crew followed down.

The direct attack route that the El Cariso crew followed down.

The alternate indirect route mentioned by Line Boss Masterson. This ended up being the location of the final control line on this flank.

The alternate indirect route mentioned by Line Boss Masterson. This ended up being the location of the final control line on this flank.

 
Rocks arranged in an 'M' or a 'W' pattern about six feet across can be found location about 100 yards below Stand 3. This is about where the El Cariso crew would have left the ridge and entered into the chimney as they cold-trailed along the fire edge. Division Boss Westmoreland probably caught up with the tail end of the crew in about this location.

Rocks arranged in an 'M' or a 'W' pattern about six feet across can be found about 100 yards below Stand 3. This is about where the El Cariso crew would have left the ridge and entered the chimney as they cold trailed along the fire edge. Division Boss Westmoreland probably caught up with the tail end of the crew in about this location.

Pacoima Reservoir as seen from the vicinity of Stand 3.

Pacoima Reservoir as seen from the vicinity of Stand 3.

 
Location (SRS)
POINT (-118.4 34.334018)

NWCG Latest Announcements

ETC Equipment Bulletin: 25-003 Flame-Resistant Shirt Survey

Date: June 12, 2025
Questions?  Please contact:
Equipment Technology Committee

The U.S. Forest Service National Technology and Development Program (NTDP) is seeking input on the Forest Service-designed flame-resistant (FR) shirt, currently available through the National Interagency Support Cache system and FedMall.

NTDP is conducting a product review to improve future FR shirt designs. As part of this effort, a short survey is now open for federal employees who have worn any of three recent FR shirt models. Feedback will guide design improvements to better meet the needs of wildland firefighters.

To comply with the Paperwork Reduction Act, responses are limited to federal employees. The survey is open through September 12, 2025. 

References:

NWCG Alerts

ETC Equipment Bulletin: 25-003

NEW! S-130, Firefighter Training (Blended) Now Available

Date: June 10, 2025
If you have questions, please visit our FAQ page. 
If your question is not answered there, you can 
submit your question using our Contact Us form. 
 

The S-130, Firefighter Training (Blended), equips new wildland firefighters with essential skills through a mix of online learning and hands-on training. The course features a required online component and an instructor-led exercise, reinforcing online concepts with practical performance-based training.

The course builds competencies in wildland fire operations, safety, and equipment use, applicable across various operational environments. Both the online component and instructor-led field exercise must be completed to receive a certificate of completion. Students are required to finish the prerequisite S-190, Introduction to Wildland Fire Behavior, before enrolling in S-130, Firefighter Training (Blended).

References:

S-130, Firefighter Training (Blended)

S-190, Introduction to Wildland Fire Behavior

Wildland Fire Learning Portal

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

Date: June 3, 2025
Questions?  Please contact:
Emergency Medical Committee

The Emergency Medical Committee has issued interim guidance for Rapid Extraction Module Support (REMS) teams. Until further notice, Type I and II REMS teams must designate a team leader qualified at Firefighter Type 1 Squad Boss (FFT1) or higher. This temporary change replaces the Single Resource Boss (SRB) requirement, which is currently not feasible due to administrative barriers.

This memorandum does not include any other changes to the NWCG Standards for Rapid Extraction Module Support, PMS 552. This interim change takes effect immediately and will remain in place until further notice.

References:

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

NWCG Standards for Rapid Extraction Module Support, PMS 552

Equipment Bulletin 25-002: Chaps, Chain Saw, M-2020, Nonconformities Affecting Use, Appearance, and Serviceability

Date: June 2, 2025
Questions?  Please contact:
Equipment Technology Committee

The Equipment Technology Committee issued Equipment Bulletin: 25-002 to address a manufacturing nonconformity affecting Forest Service specification, 6170-4K Chain Saw Chaps. The issue applies to chaps manufactured in 2024 and 2025 and distributed through FedMall. These chaps may have incorrectly bound edges that expose inner protective layers.

Independent purchasers should inspect all chain saw chaps received from FedMall beginning in 2024, prior to use. Review the full Equipment Bulletin: 25-002 for inspection criteria and recommended actions.

References:

NWCG Alerts

ETC Equipment Bulletin: 25-002