Stand 4 - Fatality Site

Submitted by Anonymous (not verified) on

This is shown as Point E in the investigation report photo referred to as Figure 3. By about 15:30 the El Cariso Hotshots were fully committed, cold trailing their way down through the steep rocky chimney canyon with Superintendent King and the lead elements of the crew just starting to approach this point. Division Boss Westmoreland had followed them about halfway down and observed minimal fire activity, but he also stated that it was not a clean burn.

Photo of El Cariso Superintendent Gordon King

Hear excerpts from El Cariso Superintendent Gordon King's interview:  audio file (mp3), transcript.

At about this same time, line construction by the Los Angeles County dozer and crews, that were working west along the bottom of the slope, was halted by a deep gully. This gully was adjacent to and just below the chimney canyon that the El Cariso crew was working down. There was no radio communication capability between the two groups, but they did have visual contact. Independently, both were trying to figure out how best to tie in the line. At this point, there was no more than 500 feet separating them.

Several individuals, who were working at the bottom of the fire, stated that the fire behavior was in a static situation with hot spots near the bottom of the gully and that there were favorable southeast winds. In addition, a helicopter was making water drops on the hotspots. According to these same observers, sometime between 1535 and 1545, the fire started to cross the bottom of the gully. Within the next 5 to 10 minutes the fire crossed the gully, made a run upslope to the bottom of the chimney, and then flashed very quickly up the length of the chimney. The steep rocky terrain made it very difficult for firefighters to move toward the previously burned area. Terrain conditions combined with the rapid fire spread resulted in all members of the El Cariso Hotshot crew being burned over as they worked from this stand location and up several hundred yards in the chimney above.

See the Investigation Report Figure 3 map, above, showing the fatality site with fire edge.

Looking up from Stand 4 at the rock slide in the chimney canyon.

Looking up from Stand 4 at the rock slide in the chimney canyon.

Rock cairn that marks Stand 4. This was put up in 2002.

Rock cairn that marks Stand 4. This was put up in 2002.

 
Looking down from Stand 4 toward the gully that impeded the Los Angeles County crews line construction effort.

Looking down from Stand 4 toward the gully that impeded the Los Angeles County crews line construction effort.

Reptile hazard encountered on the hike up in warm weather.

Reptile hazard encountered on the hike up in warm weather.

 
Location (SRS)
POINT (-118.4 34.330133)

NWCG Latest Announcements

RMC Safety Bulletin 26-001: Rhabdomyolysis in Wildland Firefighters

Date:  May 28, 2026
Questions? 
Please contact: Risk Management Committee

The Risk Management Committee (RMC) has issued Safety Bulletin 26-001: Rhabdomyolysis in Wildland Firefighters. Research from 2016 to 2025 shows that 88 cases of rhabdomyolysis (rhabdo) were reported. Analysis of reports from eSafety, the Safety Management Information System (SMIS), and the Wildland Fire Lessons Learned Center (LLC) indicates that rhabdo is common during this time of year due to Work Capacity Tests and contributing factors such as weather, hydration, nutrition, and medication or supplement use.

RMC issued this safety bulletin to raise awareness in the Wildland Fire Community, and to provide research findings and educational resources that support reducing future cases of rhabdo.

References:

NWCG Alerts

RMC Safety Bulletin 26-001: Rhabdomyolysis in Wildland Firefighters

NEW! D-110, Expanded Dispatch Recorder Course Available Now

Date:  May 15, 2026
Questions? 
Please contact: Dispatch Position and Curriculum Management Subcommittee

NWCG is pleased to announce the new D-110, Expanded Dispatch Recorder (Instructor-led) course is now available on the Wildland Fire Learning Portal (WFLP). Developed through the National Coordination System Committee, this course introduces the structure and function of expanded dispatch, the qualities of an effective dispatcher, and provides hands-on experience with the Interagency Resource Ordering Capability (IROC) system. 

The D-110, Expanded Dispatch Recorder course aligns with the competencies and duties outlined in the NWCG Incident Position Standards for Expanded Dispatch Recorder, PMS 350-59, and is designed for individuals with no prior experience who may be called upon to support dispatch operations.

References:

D-110, Expanded Dispatch Recorder (Instructor-Led)

Expanded Dispatch Recorder (EDRC), Position Page

NWCG Incident Position Standards for Expanded Dispatch Recorder, PMS 350-59

Wildland Fire Learning Portal

Leadership Committee IAP Flyer Now Available

Date:  May 8, 2026
Questions? 
Please contact: Leadership Committee

The NWCG Leadership Committee promotes and enables leadership development across the wildland fire service. The committee provides education, training opportunities, and support for leadership innovation and best practices throughout the community.

A new IAP flyer is now available on the committee website, offering an overview of the products, curriculum, and learning opportunities the Leadership Committee develops. This resource is ideal for posting in your office, sharing with new employees, or distributing through your incident management teams to engage new voices in the leadership journey and reinforce a culture of self‑reflection, development, and growth.

References:

Leadership Committee 2026 IAP Flyer

Incident Operations Subcommittee Updates the Next Generation Position Task Book for FFT1

Date:  May 7, 2026
Questions? 
Please contact: Incident Operations Subcommittee

The NWCG Incident Operations Subcommittee (IOSC) has updated the NWCG Position Task Book for Firefighter Type 1 (Squad Boss) (FFT1), PMS 311‑14. The FFT1 Position Task Book transitioned to the Next Generation (Next Gen PTB) format in June 2025 through the Incident Performance and Training Modernization effort. Since then, IOSC has received feedback from the wildland fire community regarding coding for one of the tasks. Task #13 has been updated to include the option of evaluation in a simulation.

See IOSC Memorandum 26‑01: Transition Plan for Implementation of Updates to the NWCG Position Task Book for Firefighter Type 1 (Squad Boss) (FFT1), PMS 311‑14 for more information.

References:

IOSC Memorandum 26-01: Transition Plan for Implementation of Updates to the NWCG Position Task Book for Firefighter Type 1

NWCG Firefighter Type 1 Squad Boss Position Page