Skip to main content

Stand 2 - Briefing Overlook

Submitted by Anonymous (not verified) on

About 1 mile from the mouth of Mann Gulch, this open bench where Dodge and Harrison rejoined the crew provides a view which includes most of Mann Gulch, the jump spot, the cargo spot, and the main fire. It is also a good location to discuss fuel type and arrangement on this terrain in 1949, as compared to today.

The jump ship arrived over the fire at 3:10 PM. Spotter Cooley and Foreman Dodge estimated the fire to be 60 acres and noted that it had burned to the top of the ridge between Mann and Meriwether Gulches, with considerable backing down slope into Mann Gulch. They picked a jump spot across the gulch and streamers indicated the wind was about 10 mph straight up canyon, from the northeast. The air was so turbulent that several jumpers got sick, most landed hard (Dodge actually injured his elbow on landing), the cargo got scattered, and the crew's only radio was broken on impact.

Around 5:00 PM, while the crew got a bite to eat, Dodge went across the gulch for a meeting with Meriwether Guard Harrison, who had yelled down to them. James Harrison, a smokejumper the previous season, was the first to attack the Mann Gulch fire, having hiked back and forth between the guard station to the ridge top twice during the day. Dodge instructed Hellman to follow him with the men after they had collected their cargo.

When Hellman brought the crew across, Dodge and Harrison came down and met them at a point about 100 yards up from the gulch bottom. Dodge decided that this flank was not safe. Around 5:20 PM he told Hellman to take the crew back across the drainage to this stand’s north side location, and on towards the Missouri River. Dodge and Harrison hiked back to the cargo spot to get food and water.

Route Hellman leads smokejumpers on between Stand 2 (Briefing and Overlook) and Stand 3 (Crew Turnaround Point).

Route Hellman leads smokejumpers on between Stand 2 (Briefing and Overlook) and Stand 3 (Crew Turnaround Point).

Highly detailed photo from smokejumper cargo spot Aug. 16, 1949 Notice the difference between fuels then and now.

Highly detailed photo from smokejumper cargo spot Aug. 16, 1949 Notice the difference between fuels then and now.

 
Location (SRS)
POINT (-111.89505 46.8858167)

NWCG Latest Announcements

2025 Paul Gleason Award Winners Announced

Date:  August 13, 2026
Questions? 
Please contact: Leadership Development Subcommittee

The NWCG Qualifications Management Committee (QMC) and Leadership Development Subcommittee (LDSC) are proud to announce the recipients of the 2025 Paul Gleason "Lead By Example" awards. Award categories include Initiative and Innovation, Mentoring and Teamwork, and Motivation and Vision.

Congratulations to the awardees:

  • Hunter Bell, U.S. Forest Service — Initiative and Innovation
  • Shannon Deane, U.S. Wildland Fire Service— Initiative and Innovation
  • Chris Delaney, U.S. Wildland Fire Service — Motivation and Vision
  • Sean Peterson, U.S. Forest Service — Mentoring and Teamwork

References:

Paul Gleason Lead By Example Award

Wildland Fire Leadership Development Program (WFLDP)

Leadership Development Subcommittee

LMC Equipment Bulletin 26-001: Aquatic Invasive Species – Seasonal Reminder for Mussels

Date:  July 30, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics and Equipment Management Committee (LMC) issued Equipment Bulletin 26-001: Aquatic Invasive Species - Seasonal Reminder for Mussels, reminding the wildland fire community that aquatic mussels continue to be a problem. Mussels rapidly colonize hard and soft surfaces, including aquatic plants and fire equipment, clogging pipes, fouling motors, disrupting water systems, and impacting native species.

To help prevent their spread, fire personnel must follow the decontamination procedures outlined in the NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444. Additionally, report any sightings immediately to your Lead Resource Advisor and include clear, close-up photos (with a pen or your hand for size reference) and location details.”

Read the complete LMC Equipment Bulletin 26-001, to learn more. 

References:

NWCG Alerts

LMC Equipment Bulletin 26-001: Aquatic Invasive Species - Seasonal Reminder for Mussels

NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444

Intermediate Faller (FAL2) Position Task Book Update

Date:  July 24, 2026
Questions? 
Please contact: Tree Felling Subcommittee

NWCG Operations Management Committee (OMC) has issued an update to the NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91. To ensure clarity for both trainees and evaluators, the updated FAL2 Position Task Book (PTB) explicitly states who is authorized to sign off on your tasks:

“Evaluators must be qualified as a FAL2, or an Advanced Faller (FAL1).”

If you are currently working out of a previously published version of the FAL2 PTB, you do not need to restart. However, OMC highly encourages you to take the following step to prevent any confusion in the field:

  • Print and replace the updated evaluator information page (page 2) in your current physical PTB.

References:

Intermediate Faller (FAL2) Position Page

RMC Memo 26-01: Transition Plan for Implementing Updates to Intermediate Faller (FAL2) Position Qualifications

NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Date:  July 10, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics/Equipment Management Committee (LMC) has released Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups. This advisory highlights multiple U.S. Forest Service regions reporting front driveline joint failure incidents.

This advisory recommends firefighters and fire managers to: 

  • Follow all Ram-issued inspection, maintenance, and service guidance for front driveline joints. 
  • Consider installing a driveline loop. 
  • Coordinate with fleet managers and service providers to determine the most appropriate driveline loop kit for each pickup.

For further details, please refer to the complete advisory.

References:

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Technical Service Bulletin: 03-002-21