Skip to main content

Stand 2 - Overlook Ridgeline

Submitted by Anonymous (not verified) on

The trail up to the ridge takes visitors on the journey of the firefighter. It was left steep and rough allowing visitors to experience something similar to what firefighters encounter. Signs provide visitors with information about why firefighters would choose this job and what they need to be aware of to do their job safely and efficiently.

Early in the morning on July 5th, an initial attack response consisting of an Incident Commander and a crew of seven from the local BLM District was sent to the South Canyon Fire. They walked to fire up the East Drainage which took approximately 2 ½ hours. The crew cut a helispot (H-1) on the ridge above the fire and began direct line construction downhill along the fire edge below the helispot. The Incident Commander ordered another engine crew, a helicopter, and a 20-person crew. Due to a shortage of hand crews, it was decided that a load of eight smokejumpers would be substituted for the 20-person crew.

Suppression efforts that day consisted of direct hand line and airtanker drops. The drops were deemed ineffective due to high winds and steep terrain. Late in the afternoon, the BLM firefighters left the fire when the eight smokejumpers parachuted onto the main ridgeline. The two crews never made face-to-face contact and the smokejumpers talked with the Incident Commander by radio to get instructions for their assignment.

That evening the fire had crossed the line constructed earlier by the BLM crew and was burning actively. After sizing up the fire, the Jumper-in-Charge called Grand Junction District Dispatch and ordered two Type 1 hand crews. The smokejumpers began building a downhill fireline on the east side of the ridge.

On July 5th, the fire grew from 29 acres at 0800 to 50 acres by 2200.

This location provides an excellent vantage point of the Double Draws, the Lunch Spot, Petrilli's photo point, and Longanecker's position above the West Drainage. Anywhere along this ridgeline between where the trail first crests the ridge and the Overlook Point can serve as Stand 2. This location is approximately ½ mile from the Trailhead.

This location provides an excellent vantage point of the Double Draws, the Lunch Spot, Petrilli's photo point, and Longanecker's position above the West Drainage. Anywhere along this ridgeline between where the trail first crests the ridge and the Overlook Point can serve as Stand 2. This location is approximately ½ mile from the Trailhead.

The trail follows the ridgeline, there are great vantage points all along the ridgeline.

The trail follows the ridgeline, there are great vantage points all along the ridgeline.

 
Location (SRS)
POINT (-107.4275 39.5758333)

NWCG Latest Announcements

2025 Paul Gleason Award Winners Announced

Date:  August 13, 2026
Questions? 
Please contact: Leadership Development Subcommittee

The NWCG Qualifications Management Committee (QMC) and Leadership Development Subcommittee (LDSC) are proud to announce the recipients of the 2025 Paul Gleason "Lead By Example" awards. Award categories include Initiative and Innovation, Mentoring and Teamwork, and Motivation and Vision.

Congratulations to the awardees:

  • Hunter Bell, U.S. Forest Service — Initiative and Innovation
  • Shannon Deane, U.S. Wildland Fire Service— Initiative and Innovation
  • Chris Delaney, U.S. Wildland Fire Service — Motivation and Vision
  • Sean Peterson, U.S. Forest Service — Mentoring and Teamwork

References:

Paul Gleason Lead By Example Award

Wildland Fire Leadership Development Program (WFLDP)

Leadership Development Subcommittee

LMC Equipment Bulletin 26-001: Aquatic Invasive Species – Seasonal Reminder for Mussels

Date:  July 30, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics and Equipment Management Committee (LMC) issued Equipment Bulletin 26-001: Aquatic Invasive Species - Seasonal Reminder for Mussels, reminding the wildland fire community that aquatic mussels continue to be a problem. Mussels rapidly colonize hard and soft surfaces, including aquatic plants and fire equipment, clogging pipes, fouling motors, disrupting water systems, and impacting native species.

To help prevent their spread, fire personnel must follow the decontamination procedures outlined in the NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444. Additionally, report any sightings immediately to your Lead Resource Advisor and include clear, close-up photos (with a pen or your hand for size reference) and location details.”

Read the complete LMC Equipment Bulletin 26-001, to learn more. 

References:

NWCG Alerts

LMC Equipment Bulletin 26-001: Aquatic Invasive Species - Seasonal Reminder for Mussels

NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444

Intermediate Faller (FAL2) Position Task Book Update

Date:  July 24, 2026
Questions? 
Please contact: Tree Felling Subcommittee

NWCG Operations Management Committee (OMC) has issued an update to the NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91. To ensure clarity for both trainees and evaluators, the updated FAL2 Position Task Book (PTB) explicitly states who is authorized to sign off on your tasks:

“Evaluators must be qualified as a FAL2, or an Advanced Faller (FAL1).”

If you are currently working out of a previously published version of the FAL2 PTB, you do not need to restart. However, OMC highly encourages you to take the following step to prevent any confusion in the field:

  • Print and replace the updated evaluator information page (page 2) in your current physical PTB.

References:

Intermediate Faller (FAL2) Position Page

RMC Memo 26-01: Transition Plan for Implementing Updates to Intermediate Faller (FAL2) Position Qualifications

NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Date:  July 10, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics/Equipment Management Committee (LMC) has released Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups. This advisory highlights multiple U.S. Forest Service regions reporting front driveline joint failure incidents.

This advisory recommends firefighters and fire managers to: 

  • Follow all Ram-issued inspection, maintenance, and service guidance for front driveline joints. 
  • Consider installing a driveline loop. 
  • Coordinate with fleet managers and service providers to determine the most appropriate driveline loop kit for each pickup.

For further details, please refer to the complete advisory.

References:

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Technical Service Bulletin: 03-002-21