Skip to main content

Long Term Fire Analyst

NWCG Committee Realignment Website Updates: Content will continue to be updated over the coming days as we work through final reviews and adjustments, and all publications and products are currently under revision.

LTAN decorative banner: photos depicting LTAN position. LTAN Position Description: Provides probabilistic and deterministic information on long-term fire advancement, fire behavior, and spread direction, based on local information, topography, historic and current fire spread, and with historic and current fire weather data.

The Long Term Fire Analyst (LTAN) is responsible for collecting fire behavior observations and weather, fuel, and topographic data; developing strategic fire behavior information; predicting fire growth; and interpreting fire characteristics for use by incident leadership. An LTAN may provide leadership to other LTANs, Remote Automated Weather Station (RAWS) Technicians, or Technical Specialists. The LTAN reports to the Situation Unit Leader (SITL), Planning Section Chief (PSC), host unit, or decision support center and works in the Planning functional area.

USWDS Paragraphs

The Forest Service and Department of Interior are enabled by Administratively Determined Pay Plans (AD Pay Plans) to hire persons for temporary duration for the following reasons:

  1. To cope with a sudden and unexpected emergency caused by a fire, or extreme fire potential, flood, storm, or any other all-hazard emergency that threatens damage to federally protected property, has the potential to cause loss of life, serious injury, public health risk, or damage to natural or cultural resources unless brought under immediate control.
  2. To provide emergency assistance to states under formalized agreements.
  3. To meet mission assignments issued by the Federal Emergency Management Agency (FEMA).

The National Wildfire Coordinating Group (NWCG) Incident Business Committee (IBC) reviews positions annually and establishes pay rate classifications for each position.

For more information on the AD Pay Plans, visit Finance and Business Management Committee AD Positions.

Date: Jan 2026

Added:

Other Training Which Supports Development of Knowledge and Skills

  • M-410, Facilitative Instructor
  • N-9035, Remote Automated Weather Stations

Removed:

Other Training Which Supports Development of Knowledge and Skills

  • S-482, Strategic Operational Planning
Date: Jul 2025

Removed: LTAN removed from combined PTB, PMS 311-29.

Date: Dec 2021

Added: Incident Position Description (IPD) approved.

Date: Jun 2011

Added: Intermediate Fire Danger Rating System (S-491) as Required Training.

Date: Jun 2010

Added: S-491, Intermediate National Fire Danger Rating System to Required Training.

Date: Jun 2009

Updated: LTAN training requirements were modified to include S-495, replacing S-492 and S-493.

Date: Jan 2000

Position created.

USWDS Paragraph Bundles



Last Modified / Reviewed:

NWCG Latest Announcements

LMC Equipment Bulletin 26-001: Aquatic Invasive Species – Seasonal Reminder for Mussels

Date:  July 30, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics and Equipment Management Committee (LMC) issued Equipment Bulletin 26-001: Aquatic Invasive Species - Seasonal Reminder for Mussels, reminding the wildland fire community that aquatic mussels continue to be a problem. Mussels rapidly colonize hard and soft surfaces, including aquatic plants and fire equipment, clogging pipes, fouling motors, disrupting water systems, and impacting native species.

To help prevent their spread, fire personnel must follow the decontamination procedures outlined in the NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444. Additionally, report any sightings immediately to your Lead Resource Advisor and include clear, close-up photos (with a pen or your hand for size reference) and location details.”

Read the complete LMC Equipment Bulletin 26-001, to learn more. 

References:

NWCG Alerts

LMC Equipment Bulletin 26-001: Aquatic Invasive Species - Seasonal Reminder for Mussels

NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444

Intermediate Faller (FAL2) Position Task Book Update

Date:  July 24, 2026
Questions? 
Please contact: Tree Felling Subcommittee

NWCG Operations Management Committee (OMC) has issued an update to the NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91. To ensure clarity for both trainees and evaluators, the updated FAL2 Position Task Book (PTB) explicitly states who is authorized to sign off on your tasks:

“Evaluators must be qualified as a FAL2, or an Advanced Faller (FAL1).”

If you are currently working out of a previously published version of the FAL2 PTB, you do not need to restart. However, OMC highly encourages you to take the following step to prevent any confusion in the field:

  • Print and replace the updated evaluator information page (page 2) in your current physical PTB.

References:

Intermediate Faller (FAL2) Position Page

RMC Memo 26-01: Transition Plan for Implementing Updates to Intermediate Faller (FAL2) Position Qualifications

NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Date:  July 10, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics/Equipment Management Committee (LMC) has released Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups. This advisory highlights multiple U.S. Forest Service regions reporting front driveline joint failure incidents.

This advisory recommends firefighters and fire managers to: 

  • Follow all Ram-issued inspection, maintenance, and service guidance for front driveline joints. 
  • Consider installing a driveline loop. 
  • Coordinate with fleet managers and service providers to determine the most appropriate driveline loop kit for each pickup.

For further details, please refer to the complete advisory.

References:

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Technical Service Bulletin: 03-002-21

NEW! NWCG Standard Operating Procedures, PMS 900

Date:  July 9, 2026
Questions? 
Please contact: NWCG Staff

NWCG is excited to announce the publication of the NWCG Standard Operating Procedures, PMS 900.

The new publication establishes general, consistent, and uniform standards for conducting business with the National Wildfire Coordinating Group.

References:

NWCG Standard Operating Procedures, PMS 900