Planning Section Chief Type 3*

PSC3 decorative banner: photos depicting PSC3 position.

The Planning Section Chief Type 3 (PSC3) manages all aspects of incident planning, situation and resource status, and demobilization of an incident. The PSC3 supervises members of the Planning section and may perform all functions of various positions in that section dependent upon incident complexity and assigned resources. The PSC3 is part of the Command and General (C&G) and reports to the Incident Commander (IC) under typical incident organizations. The PSC3 works in the Planning functional area.

The PSC3 performs position duties commensurate with Type 3 incident complexity and characteristics stated in the Interagency Standards for Fire and Fire Aviation Operations (Red Book). (Type 1, 2 and 3 PSC duties are identical but performed at different complexity levels.)

USWDS Paragraphs

The Forest Service and Department of Interior are enabled by Administratively Determined Pay Plans (AD Pay Plans) to hire persons for temporary duration for the following reasons:

  1. To cope with a sudden and unexpected emergency caused by a fire, or extreme fire potential, flood, storm, or any other all-hazard emergency that threatens damage to federally protected property, has the potential to cause loss of life, serious injury, public health risk, or damage to natural or cultural resources unless brought under immediate control.
  2. To provide emergency assistance to States under formalized agreements.
  3. To meet mission assignments issued by the Federal Emergency Management Agency (FEMA).

The National Wildfire Coordinating Group (NWCG) Incident Business Committee (IBC) reviews positions annually and establishes pay rate classifications for each position.

For more information on the AD Pay Plans, visit Incident Business Committee.

Date: Jan 2023

Added: 

  • Planning Section Chief Complex (PSCC) to "These Positions Maintain Currency For PSC3."
  • Planning Section Chief Complex (PSCC) to "PSC3 Maintains Currency For These Positions."
Date: Dec 2020

Added: Incident Position Description (IPD) approved.

Date: Oct 2019

Added: Qualification Requirements:  Note: Once qualified as SITL, RESL, or ICT3, the PSC3 qualification may be granted by the certifying official. Certification must be documented on a “verification/certification” page of the PSC3 Position Task Book (PMS 311-55).

Date: Oct 2018

Added: Type 3 All-Hazard Incident Management Team (O-305) to Other Training Which Supports Development of Knowledge and Skills.

Date: Oct 2016

Added: Introduction to ICS (ICS-100) and NIMS: An Introduction (IS-700) to Required Training.

Date: Oct 2015

Updated:  footnote language:

The Planning Section Chief Type 3 (PSC3) position is also utilized in the DOI All Hazard Qualification System. The FEMA All Hazard Planning Section Chief PTB is appropriate for use with this position and is available on the NWCG website.

Date: Oct 2014

Position created.

Type 3 Position standards are being introduced to provide an agreed to minimum standard for National Mobilization and to help develop local capability.  Currently the PSC3, LSC3, and FSC3 positions are utilized by FEMA and the Department of the Interior All Hazard qualification program.

NWCG recognizes the ability of cooperating agencies at the local level to jointly define and accept each other’s qualifications for initial attack, extended attack, large fire operations, and prescribed fire.

Position qualification pathways for the LSC3PSC3, and FSC3 positions include both equivalency and position task book alternatives for position qualification.   FEMA position task books will be utilized for these positions and are available at training.fema.gov/position%20specific%20taskbooks/taskbook_list.asp.

USWDS Paragraph Bundles



Last Modified / Reviewed:

Please Provide Feedback

NWCG values your constructive input and we thank you for taking the time to provide feedback.

Although contact information is optional, we hope that you provide a way for us to contact you in case we need clarification on your comment. If you would like to be contacted regarding your feedback, you must provide contact information. 

Would you like a response?
If you would like a response, you must provide contact information (name and email) below.
One file only.
9.28 GB limit.
Allowed types: gif, jpg, jpeg, png, bmp, eps, tif, pict, psd, txt, rtf, html, odf, pdf, doc, docx, ppt, pptx, xls, xlsx, xml, avi, mov, mp3, mp4, ogg, wav, bz2, dmg, gz, jar, rar, sit, svg, tar, zip.

NWCG Latest Announcements

Updated NWCG Guide for Wildland Fire Modules, PMS 431

Date: May 14, 2025
Questions?  Please contact:
Fire Use Subcommittee

The updated NWCG Guide for Wildland Fire Modules, PMS 431 serves as a supplemental resource for wildland fire module operations, providing information frequently used in the field.

PMS 431 defines the organizational structure, staffing, and qualifications for Type 1 and Type 2 Wildland Fire Modules, outlining their roles in wildland fire suppression, prescribed fire, and resource management. The NWCG Guide for Wildland Fire Modules, PMS 431, should be used in conjunction with the NWCG Standards for Wildland Fire Module Operations, PMS 430.

References:

NWCG Guide for Wildland Fire Modules, PMS 431

NWCG Standards for Wildland Fire Module Operations, PMS 430

Updated NWCG Standards for Wildland Fire Resource Typing, PMS 200 Now Includes Off-Highway Vehicle Typing Standards

Date: May 13, 2025
Questions?  Please contact:
Mobile Fire Equipment Subcommittee 

The NWCG Standards for Wildland Fire Resource Typing, PMS 200 has been updated to include newly developed Off-Highway Vehicle (OHV) typing standards. These standards organize OHV information into logical categories and outline key safety requirements for occupants.

NWCG Standards for Wildland Fire Resource Typing, PMS 200 establishes minimum typing standards for aircraft, crews, and equipment used in national mobilization to wildland fire incidents. Typing designations are assigned based on measurable capability and performance criteria.

References:

NWCG Standards for Wildland Fire Resource Typing, PMS 200

NEW! S-204, Interpersonal and Critical Thinking Skills for Safety Officers Now Available

Date: May 12, 2025
Questions?  Please contact:
Risk Management Committee

The S-204, Interpersonal and Critical Thinking Skills for Safety Officers self-directed online course is now available! Developed through the Incident Performance and Training Modernization (IPTM) effort, this training supports individuals working towards Safety Officer, Field (SOFF) incident qualifications.

S-204, Interpersonal and Critical Thinking Skills for Safety Officers focuses on facilitating hazard mitigation conversations and building trust to influence safety-related decisions. Individuals can self-enroll through the Wildland Fire Learning Portal (WFLP).

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

S-204, Interpersonal and Critical Thinking Skills for Safety Officers 

NWCG Safety Officer, Field (SOFF) Position Page

Wildland Fire Learning Portal

Great Basin Cache Upgrading to New Inventory System

Date: May 7, 2025
Questions?  Please contact:
Great Basin Cache
Phone: (208) 387-5104
Fax: (208) 387-5573

The Great Basin Cache (GBK) is transitioning to a new inventory system to better serve the wildland fire community. During this upgrade, GBK will be unable to process standard orders from Part 1: Fire Supplies and Equipment and Part 2: Publications between May 8-20, 2025, with exceptions made for emergency fire orders. Orders will be accepted through close of business May 7.

To browse the latest available items, please refer to the National Fire Equipment System (NFES) catalogs. 

References:

NWCG NFES Catalog-Part 1: Fire Supplies and Equipment, PMS 449-1

NWCG NFES Catalog-Part 2: Publications, PMS 449-2