Skip to main content

Receiving/Distribution Manager

RCDM decorative banner: photos depicting RCDM position. RCDM Position Description: The Receiving/Distribution Manager (RCDM) is responsible for receiving and distributing all supplies and equipment (other than primary resources) and the service and repair of tools and equipment.

The Receiving and Distribution Manager (RCDM) is responsible for coordinating operations related to the Logistics Supply area at wildland fire incidents. RCDMs receive incoming deliveries, package and document shipments leaving the incident, maintain and report inventories, track accountable property, and initiate the delivery of supplies to incident personnel while maintaining a safe, secure, and functional supply storage area. The RCDM may supervise Camp Crews and works for the Supply Unit Leader (SPUL) or the Logistics Section Chief (LSC) and works in the Logistics functional area.

The Forest Service and Department of Interior are enabled by Administratively Determined Pay Plans (AD Pay Plans) to hire persons for temporary duration for the following reasons:

  1. To cope with a sudden and unexpected emergency caused by a fire, or extreme fire potential, flood, storm, or any other all-hazard emergency that threatens damage to federally protected property, has the potential to cause loss of life, serious injury, public health risk, or damage to natural or cultural resources unless brought under immediate control.
  2. To provide emergency assistance to States under formalized agreements.
  3. To meet mission assignments issued by the Federal Emergency Management Agency (FEMA).

The National Wildfire Coordinating Group (NWCG) Incident Business Committee (IBC) reviews positions annually and establishes pay rate classifications for each position.

For more information on the AD Pay Plans, visit Incident Business Committee.

No History

USWDS Paragraph Bundles

NWCG Latest Announcements

The Next Generation Position Task Book and Incident Position Standards are now available for Safety Officer, Field (SOFF)

Date: July 26, 2024
Contact: Risk Management Committee 

NWCG is excited to announce that the NWCG Incident Position Standards for Safety Officer, Field, PMS 350-81 and NWCG Position Task Book for Safety Officer, Field (SOFF), PMS 311-81 are now available.

The Safety Officer, Field (SOFF) is responsible for monitoring operations on an incident from a risk management perspective to provide for the welfare of incident resources and the public. The new Incident Position Standards and Next Generation Position Task Book are developed through the Incident Performance and Training Modernization (IPTM) effort.

References:

NWCG Safety Officer, Field (SOFF) Position

NWCG Incident Position Standards for Safety Officer, Field, PMS 350-81

NWCG Position Task Book for Safety Officer, Field (SOFF), PMS 311-81

Updated NWCG Standards for Electronic Documentation (eDoc), PMS 277

Date: July 25, 2024
Contact: Incident Planning Subcommittee 

The Incident Planning Subcommittee has updated the NWCG Standards for Electronic Documentation (eDoc), PMS 277.

The NWCG Standards for Electronic Documentation (eDoc) establishes the standards for collection and retention of records on wildland fires. This July 2024 update will provide incident management teams the most current standards required to maintain incident records and submit them to host units at the close of an incident.

References:

NWCG Standards for Electronic Documentation (eDoc), PMS 277

eDoc Box Directory (zip file)

NWCG Off-Highway Vehicle Typing Standard Request for Comment

Date: July 24, 2024
Contact: Mobile Fire Equipment Subcommittee 

The Mobile Fire Equipment Subcommittee has released Equipment Bulletin 24-002 NWCG Off-Highway Vehicle (OHV) Typing Standard - Request for Comment. This bulletin outlines the proposed NWCG OHV typing standard, as well as the business need for establishing the standard. Comments on the proposed standard will be accepted through August 15th using the comment form linked below.

References:

ETC-EB-2024-02: NWCG Off-Highway Vehicle (OHV) Typing Standard - Request for Comment

NWCG Off-Highway Vehicle (OHV) Typing Standard Comment Form

NWCG Standards for Airtanker Operations, PMS 514 - DRAFT

Date: July 18, 2024
Contact: National Interagency Aviation Committee 

A draft version of the new NWCG Standards for Airtanker Operations, PMS 514, is now available. The NWCG Standards for Airtanker Operations establishes the standards for dispatching, utilizing, and coordinating airtankers on wildland fires. As this is the first edition of these standards, the National Interagency Aviation Committee (NIAC) requests review and input into the 2025 final publication.

Please review and provide feedback by September 1st, 2024 for consideration. Feedback can be provided utilizing the NWCG Publication Review Form.

References:

NWCG Standards for Airtanker Operations, PMS 514 - DRAFT

NWCG Publications Review Form