Skip to main content

PMS 448

Kit – Shelter, 16’ Octagon

NFES #
000550
Category
Kits
Updated
Storage and Shelf Life Checks
None

This item has been deleted from the NFES catalog.

National Caches are not stocking or refurbishing this item.

Initial Inspection/Disposal Criteria

  1. Inspect packing list and instructions. Refer to NWCG National Fire Equipment System Catalog for a complete list of kit components.
    1. Assemble the mainframe and components according to instructions. All locking pins and flex joints should move easily.
    2. Inspect for burrs on all components of mainframe, eve bars, and base bars.
    3. Loosen flex joints and remove burrs as needed.
  2. Inspect and install door. Door should open and close easily.
  3. Inspect roof and wall panels for any tears or rips and repair as needed.
  4. Inspect windows and screens in wall panels. Repair or replace where necessary.
  5. Check for broken welds on key flange, repair by bolting.
  6. Return to stock if shelter was not used, all kit contents are accounted for, and the shelter is clean.
  7. Refurbish kit if the shelter was used or is missing components.
  8. Disposal of complete kits is not recommended. Seek direction from local cache management for specific disposal criteria. Components that are damaged beyond repair should be disposed of and replaced with like items.

Refurbishing Procedures

A. Cleaning

  1. Clean main frame and misc. parts with a damp cloth and mild detergent if necessary.
  2. Clean the roof and wall panels with a mild detergent and water solution. Use a brush to remove hard dirt and grime or high pressure wash. Rinse well.
  3. Air dry completely before repackaging.

B. Repair

  1. Repair or replace any part of the main frame as needed. Bolt key flange.
  2. When dismantling, wipe all component parts with a damp cloth and return to proper container.
  3. Repair any holes, tears or rips as needed.
  4. Ensure that all locking buttons snap into place.
  5. Ensure that the Velcro is dry on all panels before folding and placing in proper container.
  6. Stencil main frame with property number, stencil inside the center roof ring.
  7.  Ensure that all kit components are accounted for prior to repacking.

C. Testing for Performance

  • none

D. Repackaging

  1. Repack according to manufacturer’s instructions and local cache option.
  2. Ensure that installation/assembly instructions are included in package.

 

Reference

Replacement parts may be obtained by contacting:
Western Shelter Systems
830 Wilson Street
Eugene, OR 97402
Phone: 541–344–7267

 

NWCG Latest Announcements

The Incident Position Standards and Next Generation Position Task Book are now available for Medical Unit Leader (MEDL)

Date: October 16, 2024
Contact: Incident Medical Subcommittee

NWCG is excited to announce that the NWCG Incident Position Standards for Medical Unit Leader, PMS 350-39 and NWCG Position Task Book for Medical Unit Leader (MEDL), PMS 311-39 are now available.

The Performance Support Package, which for MEDL includes the Incident Position Standards and Next Generation Position Task Book, were developed through the Incident Performance and Training Modernization (IPTM) effort. The Performance Support Package will support trainees, those qualified in the position, and evaluators.

References:

NWCG Medical Unit Leader Position Page

NWCG Incident Position Standards for Medical Unit Leader, PMS 350-39

NWCG Position Task Book for Medical Unit Leader (MEDL), PMS 311-39

The Wildland Fire Learning Portal is Now Available

Date: October 9, 2024
Contact: Wildland Fire Learning Portal

The Wildland Fire Learning Portal (WFLP) is back online following a migration to a new learning management system (LMS) application. The WFLP team is actively addressing any issues that may arise as a result of the update, and appreciates your patience as the team works to enhance your experience. NWCG will share information from the WFLP as it is available.

Should you have any issues with accessing or using the WFLP, please use the link below to submit a ticket through the Help Center.

References:

Wildland Fire Learning Portal

Wildland Fire Learning Portal Help Center

NWCG Equipment Technology Committee Releases New Equipment Bulletins

Date: September 27, 2024
Contact: Equipment Technology Committee

The Equipment Technology Committee (ETC) has released three new Equipment Bulletins:

  • ETC-EB-24-003 Diesel exhaust fluid (DEF) in fuel containers.
  • ETC-EB-24-004 Two-compartment fuel and oil container (Dolmar) unavailable in the United States (US) and reminders for upkeeping current inventories.
  • ETC-EB-24-005 Personal Protective Equipment (PPE): Inspection, Care, and Maintenance.

These bulletins remind field going personnel of important issues related to equipment for wildland firefighting efforts.

References:

NWCG Alerts

ETC-EB-24-003 Diesel exhaust fluid (DEF) in fuel containers

ETC-EB-24-004 Two-compartment fuel and oil container (Dolmar) unavailable in the United States (US) and reminders for upkeeping current inventories

ETC-EB-24-005 Personal Protective Equipment (PPE): Inspection, Care, and Maintenance

The Experiential Learning Subcommittee is looking for your feedback on Staff Rides

Date: September 20, 2024
Contact: Ashleigh D'Antonio and George Risko, Leadership Committee

The Experiential Learning Subcommittee needs to hear from the field about where the greatest need lies regarding staff rides and their accessibility.

  • Do you have an event you would like to turn into a learning experience?
  • Do you have a staff ride built, but are struggling to implement the delivery?
  • Do you need help building capacity?
  • What other ideas do you have to support experiential leadership training?

Fill out this short survey below to help us help you.

References:

Staff Rides: Feedback

Staff Rides