Skip to main content

PMS 448

Berm – Containment, 55 GL (1 to 4 drums)

NWCG Committee Realignment Website Updates: Content will continue to be updated over the coming days as we work through final reviews and adjustments, and all publications and products are currently under revision.

NFES #
000692
Category
Miscellaneous
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for dirt, debris, fuel, and other liquids which may be present and/or soiled absorbent cloth.  Dispose of soiled absorbent cloth according to local hazardous materials standards.
  2. Must have foam bumper around the outer edge (see photo below).  The lay flat style is being removed from service.
  3. Inspect for torn or missing tie down grommets, holes, rips, or tears that are large or too numerous. Repair if holes or tears are 1 inch or less, or a combination of 3 holes with a combined length of 1.5 inches.
  4. Return to stock if item shows no signs of use and passes initial inspection.
  5. Refurbish if damage detected is repairable.
  6. Dispose of item if damage is determined to be unrepairable.

Refurbishing Procedures

A. Cleaning

  1. Clean with pressure washer to remove matter such as mud, dirt, and grease.
  2. Use a solution of mild detergent and water to remove grease with an absorbent cloth.
  3. Dispose of saturated cloth according local hazardous materials standards.
  4. Wipe dry or let air dry.

B. Repair

  1. Hold up to strong light or sun to locate holes.  Holes or tears 1 inch or less or a combination of 3 holes with a combined length of 1.5 inches are acceptable for repair.
  2. With suitable cleaner, apply vinyl adhesive to both surfaces, i.e., patch and berm.
  3. Let dry till tacky.
  4. Place patch on damaged area and apply pressure with roller or suitable device for at least 1 minute.
  5. Let berm sit flat and dry.
  6. Vinyl welding with patch material like in thickness and color of berm material is acceptable for repair.  Follow instructions or established local procedures for completing vinyl welding repairs.

C. Testing for Performance

  • None

D. Repackaging

  1. Roll berm and band for storage. (see photos below for details)
  2. Suggested packaging is 1 each in NFES #000513 carton (36” x 24” x 17”).

EXAMPLE ROLL FOR PLACING IN #000645 CARTON

Fold left side to center.

Fold right side to center.

Roll up folded berm.

Tie rolled berm with twine.

Place rolled and bound berm in box.

 

 

NWCG Latest Announcements

Intermediate Faller (FAL2) Position Task Book Update

Date:  July 24, 2026
Questions? 
Please contact: Tree Felling Subcommittee

NWCG Operations Management Committee (OMC) has issued an update to the NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91. To ensure clarity for both trainees and evaluators, the updated FAL2 Position Task Book (PTB) explicitly states who is authorized to sign off on your tasks:

“Evaluators must be qualified as a FAL2, or an Advanced Faller (FAL1).”

If you are currently working out of a previously published version of the FAL2 PTB, you do not need to restart. However, OMC highly encourages you to take the following step to prevent any confusion in the field:

  • Print and replace the updated evaluator information page (page 2) in your current physical PTB.

References:

Intermediate Faller (FAL2) Position Page

RMC Memo 26-01: Transition Plan for Implementing Updates to Intermediate Faller (FAL2) Position Qualifications

NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Date:  July 10, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics/Equipment Management Committee (LMC) has released Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups. This advisory highlights multiple U.S. Forest Service regions reporting front driveline joint failure incidents.

This advisory recommends firefighters and fire managers to: 

  • Follow all Ram-issued inspection, maintenance, and service guidance for front driveline joints. 
  • Consider installing a driveline loop. 
  • Coordinate with fleet managers and service providers to determine the most appropriate driveline loop kit for each pickup.

For further details, please refer to the complete advisory.

References:

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Technical Service Bulletin: 03-002-21

NEW! NWCG Standard Operating Procedures, PMS 900

Date:  July 9, 2026
Questions? 
Please contact: NWCG Staff

NWCG is excited to announce the publication of the NWCG Standard Operating Procedures, PMS 900.

The new publication establishes general, consistent, and uniform standards for conducting business with the National Wildfire Coordinating Group.

References:

NWCG Standard Operating Procedures, PMS 900

Quarter Four Materials for the 2025-2026 Wildland Fire Leadership Campaign Now Available

Date:  July 8, 2026
Questions? 
Please contact: Leadership Development Subcommittee

NWCG is excited to announce that Fourth Quarter materials for the 2025/2026 Wildland Fire Leadership Campaign are now available. This annual initiative offers all students of leadership and wildland fire management an opportunity to engage with essential leadership skills and knowledge needed to lead effectively in dynamic environments.

Quarter Four materials focus on Leadership Level 4: Leader of Leaders (Provide Direction). Leadership Level 4 is where you are setting the conditions for others to do things well, even when you are not present. This quarter focuses on equipping experienced leaders with skills to provide direction, build trust across teams, and foster strong decision making. 

References:

2025/2026 NWCG Leadership Campaign - Leadership Levels

Wildland Fire Leadership Development Program

Leadership Development Subcommittee