Skip to main content

PMS 448

Shelter – Fire, Complete, M2002

NFES #
000925
Category
PPE
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect the following:
    1. Shelter – Do not open polyvinyl liner for inspection. 

      1. Fire shelter manufactured prior to 2006 should be removed from service as per NWCG Equipment Advisory 22-03. This can be determined by either a white or pink colored paper insert label inside of the polyvinyl chloride bag.
      2. Check to ensure that the bag has been modified to include small slits under the pull tabs as per  NWCG Equipment Advisory 21-01. Retro fitted bags will have a yellow dot sticker on the bag. New bags will have the slits and no sticker.
      3. Inspect polyvinyl bag for cuts, puncture, or torn seams. If the bag has any anomaly that may affect the integrity of the bag or the shelter, remove shelter from service.
      4. Inspect that the red pull rings are unbroken and the quick-opening tear strip is sealed to the bag the entire length and is unbroken. Dispose of shelters with damaged or missing red tear strip.
      5. Look through bag at the shelter for tears in shelter material along seams. If any tears are evident in the shelter material or polyvinyl bag, or if significant gray discoloration of the interior of the polyvinyl bag has obscured interior inspection, remove shelter from service and dispose.
      6. Further inspection should include identifying PVC bags which have unreinforced yellow pull tabs. Per Cache Memo #07-4 “Polyvinyl Bag Retrofit” Some shelters may have a glued webbing reinforcement visible on the PVC bag yellow pull strap. Any shelter lacking webbing reinforcement (glued or stitched) should be removed from service.
      7. Fire shelters lacking any label inside of the PVC bag should be removed from service.

      Carrying Case

      1. Inspect for cuts, tears, torn seams or flaps.
      2. Ensure that M-2002 Use Instructions (English on one side, Spanish on the other) are in the “Use Instructions” pocket on the front.
      3. Check for two belt clips and ensure they are working properly.
    2. Liner
      1. Inspect the polyvinyl liner for cracks or tears.
      2. Return to stock if item shows no sign of use.
      3. Refurbish, clean only.
      4. Dispose of item if any damage. Any doubt as to the condition to the shelter: REMOVE FROM SERVICE.
  2. Return to stock if item is new or like new, passes inspection, and does not require refurbishment.
  3. Refurbish if item passes inspection but light cleaning is required.
  4. Dispose of item if it fails inspection.
    1. Shelters that show signs of damage can be used as practice shelters. Clearly identify each as PRACTICE ONLY. This item may be used for practice when clearly marked as practice only.

Refurbishing Procedures

A. Cleaning

Do not open polyvinyl liner for refurbishment.

  1. Clean the Shelter, Case, and Liner with a damp cloth.
  2. Brush dirt off heavily soiled case with a stiff brush.
  3. Remove oils from carrying case using a solution of warm water and detergent and brush.
  4. Rinse with clear water and let dry.

B. Repair

  • None

C. Testing for performance

  • None

D. Repackaging

  1. 10 each in NFES #008072 carton (24” x 12” x 10”). 

NWCG Latest Announcements

Updated! L-280, Followership to Leadership (Instructor-led) Course

Date: October 3, 2024
Questions? Please contact:
Leadership Committee

NWCG is pleased to announce the updated L-280, Followership to Leadership (Instructor-led) course is now available. L-280 is intended for operational personnel at the Firefighter Type 1 level, and for individuals pursuing Leadership Level 2, New Leader. 

This instructor-led course is a primer on leadership and the second formal course in the Wildland Fire Leadership Development Program. It helps emerging leaders build the confidence, skills, and mindset needed to lead effectively in high-risk environments. 

For more information about leadership development and available courses, visit the Leadership Committee Web Portal.

References:

L-280, Followership to Leadership (Instructor-led)

Wildland Fire Leadership Development Program

Wildland Fire Learning Portal

Equipment Advisory 25-01: Pre-2006 Fire Shelter Degradation and Discontinuation of Use

Date: Sept 26, 2025
Questions? Please contact:
Equipment Technology Committee 

The Equipment Technology Committee (ETC) has released Equipment Advisory 25-01: Pre-2006 Fire Shelter Degradation and Discontinuation of Use. This advisory recommends all pre-2006 fire shelters should be removed from service by January 1, 2026.

This advisory recommends firefighters and fire managers to:

  • Inspect fire shelters immediately
  • Replace and destroy any pre-2006 shelters (identified by white or pink insert label)
  • Order replacements as needed

For further details, please refer to the complete advisory. 

References:

Equipment Advisory 25-01: Pre-2006 Fire Shelter Degradation and Discontinuation of Use

NWCG Fire Inspection Flowchart, PMS 411-1

NWCG Alerts

NEW! S-219, Firing Operations (Blended) Now Available

Date: Sept 11, 2025
Questions? Please contact:
Fuels Management Committee 

The S-219, Firing Operations (Blended) course is now available on the Wildland Fire Learning Portal. Developed through the Incident Performance and Training Modernization (IPTM) effort, this training supports individuals working towards Firing Boss, Single Resource (FIRB) incident qualifications.

This blended course combines online and instructor-led training to provide students with the knowledge and skills required to perform the duties of the FIRB, as described in the NWCG Incident Position Standards for Firing Boss, Single Resource, PMS 350-105.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1, scheduled for January 2026.

References:

S-219, Firing Operations (Blended)

NWCG Firing Boss, Single Resource Position Page

Wildland Fire Learning Portal

NWCG Committees Observe Suicide Prevention Awareness Week: September 7-13, 2025

Date: Sep 5, 2025
Questions? Please contact:
Mental Health Subcommittee

The NWCG Mental Health Subcommittee (MHSC) and Risk Management Committee (RMC) recognize the unique challenges and demands faced by the wildland fire community. The MHSC and RMC know that we are all stronger together and believe in fostering a culture of support, understanding, and resilience.

Suicide Prevention Awareness encourages us to actively connect with and support each other. For more information that could make a difference for yourself or someone else please review the materials and resources provided for the 2025 Suicide Prevention Awareness Week.

References:

2025 Suicide Prevention Awareness Week Materials and Resources