Skip to main content

Hose Roller – Electric

NFES #
000633
Category
Small Engine Equipment
Updated
Storage and Shelf Life Checks
Yes
Storage and Shelf Life Procedure
Date Last Tested (DLT) not to exceed 12 months.

Initial Inspection/Disposal Criteria

  1. Inspect for missing parts, proper foot pedal switch operation, cracks in frame structure, roller pins in place, exterior motor damage; damaged or cut power cord.
  2. Verify that the protective guards are on any and all moving parts. (i.e., foot pedal shroud)
  3. Return to stock if there is no sign of use or damage and date last tested (DLT) does not exceed 12 months.
  4. Refurbish as necessary if unit has been used, damaged, or shelf life is exceeded.
  5. Dispose of the unit if it is not economically repairable.

Refurbishment Procedures

A. Cleaning

  1. Blow dust and dirt out of electric motor.
  2. If needed wash with high-pressure washer (cover electric motor).
  3. Let dry.

B. Repair

  1. Repair cracks in frame as needed.
  2. Repair or replace power cord if damaged. Ensure no exposed wire, grounding hazards or electrical shock risks.
  3. Ensure all decals (operations and warning) are affixed and legible.

C. Test for Performance

  1. Plug in to power source and test motor and moving parts.
  2. Test roller under a load by means of rolling lengths of hose.
  3. Retest after servicing motor and/or transfer case.

D. Repackaging

  1. Use nylon “zip-tie” to tie off (seal) power cord to frame.
  2. Attach certification tag that indicates date last tested (DLT), property #, and name of individual certifying performance.
  3. Ensure that all identification (property #, serial #, owner ID) is affixed and legible.

 

NWCG Latest Announcements

New Aircraft Flight Schedule Form, PMS 249

Date:  April 17, 2026
Questions? 
Please contact: National Coordination System Committee

A new publication from the National Coordination System Committee (NCSC) is now available. The NWCG Aircraft Flight Schedule Form, PMS 249, will be used for aviation crews and dispatch to share flight information that is needed for resource tracking, and if needed, for emergency procedures.

For further details, please contact your NCSC representative. 

References:

NCSC Memo 26-01: Implementation of NWCG Aircraft Flight Schedule Form, PMS 249

NWCG Aircraft Flight Schedule Form, PMS 249

New Glossary Term for Review

Date:  April 15, 2026
Questions? 
Please contact: Data Standards and Terminology Board (DSTB)

The Data Standards and Terminology Board is requesting feedback on a new glossary term: Resource Protection Measure (RPM).

The proposed definition is: Practical guidance provided for incident personnel in a manner in which incident objectives can be achieved while reducing impacts to identified resources across the landscape. RPMs are informed by, but not restricted to, Minimum Impact Strategies and Tactics (MIST).

Please review, share with your subgroups, and provide feedback as appropriate through the following form: Request Feedback The comment period will close May 10, 2026.

Thank you for your engagement in the NWCG glossary process – your participation is key to our success.

References:

Glossary Request Feedback

Quarter Three Materials for the 2025-2026 Wildland Fire Leadership Campaign Now Available

Date:  April 1, 2026
Questions? 
Please contact: Leadership Committee

NWCG is excited to announce that Quarter Three materials for the 2025/2026 Wildland Fire Leadership Campaign are now available. This annual initiative offers all students of leadership and wildland fire management an opportunity to engage with essential leadership skills and knowledge needed to lead effectively in dynamic environments.

Quarter Three materials focus on Leadership Level 3: Leader of People (Develop Intent). Leadership Level 3 is where your values, your team, and your influence come together. Leaders of People put their teams first, build trust, and lead with authenticity. They mentor future leaders and shape decisions up and down the chain.

References:

2025/2026 NWCG Leadership Campaign - Leadership Levels

Wildland Fire Leadership Development Program

Leadership Committee

WFSTAR 2026 Core Components Module Package and 2025 Fire Year in Review Now Available

Date:  March 23, 2026
Questions? 
Please contact: Joe Schindel

The 2026 Core Components Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2025 Fire Year in Review are now available on the NWCG website. The 2026 Core Components Module Package provides all content needed to deliver RT-130.

References:

2026 Core Components Module Package

2025 Fire Year in Review Module