Skip to main content

Blower – Mist, Leaf Blower

NFES #
007040
Category
Small Engine Equipment
Updated
Storage and Shelf Life Checks
Yes
Storage and Shelf Life Procedure
Date Last Tested (DLT) not to exceed 12 months.

Initial Inspection/Disposal Criteria

  1. Visually inspect for evidence of use (dust, oil, starter seal broken), damage or missing parts.
  2. Return to stock if there are no signs of use or damage and date last tested (DLT) does not exceed 12 months.
  3. Refurbish as necessary if the unit has been used or fueled, damaged, or shelf life is exceeded.
  4. Dispose of the unit if it is not economically repairable.

Refurbishment procedures

A. Cleaning

  1. Remove dirt and oil using compressed air or detergent and shop towels as necessary.
  2. Use pressure washer and degreaser to remove heavy deposits of oil and grease.
  3. Equipment should be repaired and tested as quickly as possible after pressure washing to minimize rust formation on metal parts.

B. Repair

  • This equipment is primarily serviced at a “factory authorized” repair facility. Ensure that the servicing repair facility has a copy of this refurbishment standard.

C. Test for Performance

  1. Refer to the owner’s manual for operations and specifications information specific to blower model.
  2. Check condition of fuel mix; ensure fuel is fresh and the correct mix oil ratio is used prior to starting the engine. Use a fuel stabilizer in fuel during testing to help ensure proper operation of engine at post storage start up.
  3. Ensure recoil starter functions properly. Check for damage or fraying of pull cord; repair or replace as necessary.
  4. Engine should: Start easily, run smoothly, be free of fuel leaks, and provide sufficient power to the blower attachment.
  5. Ensure all engine operational controls are functioning properly; stop switch, throttle and choke.
  6. Ensure fuel geyser danger sticker is present and legible. Reference cache memo 17-2 below.
  7. Test for blower performance (see owner’s manual for specific performance data).
  8. Should any function fail a test, refer to the manufacturer’s repair manual and troubleshooting guide to correct the problem.
  9. Remove all gasoline from fuel tank and run engine until carburetor is completely empty of fuel.

D. Repackaging

  1. Use a nylon “zip-tie” to tie off (seal) starter rope to the handle grip.
  2. Attach a certification tag that indicates date last tested (DLT), property #, and name of inspector certifying the performance.
  3. Ensure that all identification (property #, serial #, owner ID) is affixed and legible.

 

NWCG Latest Announcements

Incident Operations Subcommittee Updates the Next Generation Position Task Book for FFT1

Date:  May 7, 2026
Questions? 
Please contact: Incident Operations Subcommittee

The NWCG Incident Operations Subcommittee (IOSC) has updated the NWCG Position Task Book for Firefighter Type 1 (Squad Boss) (FFT1), PMS 311‑14. The FFT1 Position Task Book transitioned to the Next Generation (Next Gen PTB) format in June 2025 through the Incident Performance and Training Modernization effort. Since then, IOSC has received feedback from the wildland fire community regarding coding for one of the tasks. Task #13 has been updated to include the option of evaluation in a simulation.

See IOSC Memorandum 26‑01: Transition Plan for Implementation of Updates to the NWCG Position Task Book for Firefighter Type 1 (Squad Boss) (FFT1), PMS 311‑14 for more information.

References:

IOSC Memorandum 26-01: Transition Plan for Implementation of Updates to the NWCG Postion Task Book for Firefighter Type 1

NWCG Firefighter Type 1 Squad Boss Position Page 

NEW! S-212, Intermediate Faller (Online) Course Available Now 

Date:  April 23, 2026
Questions? 
Please contact: Hazard Tree and Tree Felling Subcommittee

NWCG is pleased to announce that the new S‑212, Intermediate Faller (Online), course is now available on the Wildland Fire Learning Portal (WFLP). This second course in the series provides students with the knowledge and skills required to perform the duties of an Intermediate Faller (FAL2), as described in the FAL2 Incident Position Description. This course is intended for individuals seeking to advance from Basic Faller (FAL3) to FAL2.

S‑212, Intermediate Faller is a fully online, self‑paced training program consisting of 13 units. Learners will engage with interactive, scenario‑based content designed to progressively build foundational skills and knowledge essential for the FAL2 role.

Students must be qualified as a Basic Faller (FAL3) prior to enrolling in S‑212, Intermediate Faller course.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1, scheduled for January 2027.

References:

S-212 Intermediate Faller (Online)

RMC Memo 26-01: Transition Plan for Implementing Updates to Intermediate Faller (FAL2) Position Qualifications

Intermediate Faller (FAL2) Position Page

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212

New Aircraft Flight Schedule Form, PMS 249

Date:  April 17, 2026
Questions? 
Please contact: National Coordination System Committee

A new publication from the National Coordination System Committee (NCSC) is now available. The NWCG Aircraft Flight Schedule Form, PMS 249, will be used for aviation crews and dispatch to share flight information that is needed for resource tracking, and if needed, for emergency procedures.

For further details, please contact your NCSC representative. 

References:

NCSC Memo 26-01: Implementation of NWCG Aircraft Flight Schedule Form, PMS 249

NWCG Aircraft Flight Schedule Form, PMS 249

New Glossary Term for Review

Date:  April 15, 2026
Questions? 
Please contact: Data Standards and Terminology Board (DSTB)

The Data Standards and Terminology Board is requesting feedback on a new glossary term: Resource Protection Measure (RPM).

The proposed definition is: Practical guidance provided for incident personnel in a manner in which incident objectives can be achieved while reducing impacts to identified resources across the landscape. RPMs are informed by, but not restricted to, Minimum Impact Strategies and Tactics (MIST).

Please review, share with your subgroups, and provide feedback as appropriate through the following form: Request Feedback The comment period will close May 10, 2026.

Thank you for your engagement in the NWCG glossary process – your participation is key to our success.

References:

Glossary Request Feedback