Skip to main content

Pump – Trombone, Backpack, Single Action

NFES #
000151
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for obvious damage. 
  2. Inspect for burns and cracks. Dispose of if these are found.
  3. Inspect for damaged threads. If beyond repair dispose of. Ensure tip is secured to wand with a 3-4 inch length of ball chain.
  4. Place hose in water and pump handle to validate that pump works properly.
  5. Return item to stock if it shows no sign of use or damage.
  6. Dispose of item if unable to repair.

Refurbishing Procedures

A. Cleaning

  1. Wash and clean all items of foreign matter, such as mud, dirt, and grease.
  2. Clean in mild detergent with brush or scouring pad as needed.
  3. Rinse thoroughly.

B. Repair

  1. If pump pressure is not sufficient, remove pump unit and replace O-rings.
  2. If suction hose is kinked, replace hose.
  3. Ensure quick connection on pump has proper seating.
  4. Check hose connection to pump for tightness; if loose, use a hose clamp.
  5. Replace length of ball chain between wand and removable tip if missing.
  6. Check supply hose on pump assembly for obstructions and tight connections, bent push rods, and clogged tips.
  7. Check spring and ball bearing.
  8. Lubricate slide with appropriate lubricant, e.g., Chevron NLGI2 or equivalent.

C.  Tests for Performance

  • Place end of hose in water and pump trombone. Ensure that it fills and discharges water properly without back feeding water out of the suction hose.

D.  Repackaging

  1. Suggested packaging of NFES #000151, 10 each in NFES #000385 carton (7.25” x 9.25” x 26”) or 25 each in NFES #002006 carton (23” x 19” x 10”).
  2. Ensure suction hose is not kinked when packaging.

 

NWCG Latest Announcements

NEW! S-130, Firefighter Training (Blended) Now Available

Date: June 10, 2025
If you have questions, please visit our FAQ page. 
If your question is not answered there, you can 
submit your question using our Contact Us form. 
 

The S-130, Firefighter Training (Blended), equips new wildland firefighters with essential skills through a mix of online learning and hands-on training. The course features a required online component and an instructor-led exercise, reinforcing online concepts with practical performance-based training.

The course builds competencies in wildland fire operations, safety, and equipment use, applicable across various operational environments. Both the online component and instructor-led field exercise must be completed to receive a certificate of completion. Students are required to finish the prerequisite S-190, Introduction to Wildland Fire Behavior, before enrolling in S-130, Firefighter Training (Blended).

References:

S-130, Firefighter Training (Blended)

S-190, Introduction to Wildland Fire Behavior

Wildland Fire Learning Portal

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

Date: June 3, 2025
Questions?  Please contact:
Emergency Medical Committee

The Emergency Medical Committee has issued interim guidance for Rapid Extraction Module Support (REMS) teams. Until further notice, Type I and II REMS teams must designate a team leader qualified at Firefighter Type 1 Squad Boss (FFT1) or higher. This temporary change replaces the Single Resource Boss (SRB) requirement, which is currently not feasible due to administrative barriers.

This memorandum does not include any other changes to the NWCG Standards for Rapid Extraction Module Support, PMS 552. This interim change takes effect immediately and will remain in place until further notice.

References:

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

NWCG Standards for Rapid Extraction Module Support, PMS 552

Equipment Bulletin 25-002: Chaps, Chain Saw, M-2020, Nonconformities Affecting Use, Appearance, and Serviceability

Date: June 2, 2025
Questions?  Please contact:
Equipment Technology Committee

The Equipment Technology Committee issued Equipment Bulletin: 25-002 to address a manufacturing nonconformity affecting Forest Service specification, 6170-4K Chain Saw Chaps. The issue applies to chaps manufactured in 2024 and 2025 and distributed through FedMall. These chaps may have incorrectly bound edges that expose inner protective layers.

Independent purchasers should inspect all chain saw chaps received from FedMall beginning in 2024, prior to use. Review the full Equipment Bulletin: 25-002 for inspection criteria and recommended actions.

References:

NWCG Alerts

ETC Equipment Bulletin: 25-002

2024 Wildland Fire Emergency Medical Service Awards

Date: May 22, 2025
Questions?  Please contact:
Emergency Medical Committee

The NWCG Emergency Medical Committee (EMC) is proud to announce the recipients of the 2024 Wildland Fire Emergency Medical Service Awards. Each year, EMC recognizes individuals and groups who have demonstrated exceptional actions or accomplishments that go above and beyond their normal mission or job duties.

Congratulations to all the awardees and nominees. Through leadership and initiative, they have made significant contributions to the safety and well-being of the wildland fire community. These honors are well deserved.

References:

2024 Wildland Fire EMS Awards

NWCG Emergency Medical Committee