Skip to main content

Valve – Wye, Gated, Brass, 3/4” NH-F X 3/4” NF-M X 3/4” NH-M

NFES #
000904
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for the following:
    1. Handles-bent, broken, missing, too tight, too loose, expansion pins coming out or missing, handles correct (left and right) and positioned properly.
    2. Male flange-flange missing, lock-ring and set-screws functional, damaged threads, smooth flat surface on flange, burrs on threads, or loose male flange.
    3. Female coupling-Coupling spins freely, gasket present and in good condition, free of cracks, damage, or burrs on threads.
    4. Casting (body)-Fire damage—look for further damage, O-rings in good condition, corrosion, cracks, and burrs.
    5. Plastic sphere-Inspect sphere while turning handle; if pitted or rough, replace.
  2. Return to stock if item is clean, passes inspection, and is in unused condition.
  3. Refurbish if deficiencies are discovered during the inspection process and item requires cleaning.
  4. Dispose of item if damages are not repairable or item has sustained damage caused by fire.

Refurbishing Procedures

A. Cleaning

  1. Clean in a mild detergent with brush and scouring pad or use parts washer or high-pressure wash to remove foreign matter such as mud, dirt, or grease. Rinse thoroughly.
  2. Do not soak for extended periods of time as detergent will corrode the metal.
  3. Stand upright with barrels in open position to drain water and dry.
  4. Lubricate with appropriate type of lubricant.

B. Repair

  1. Replace missing or damaged O-rings and gaskets.
  2. Replace broken, missing handles.
  3. Repair or replace male flange if damaged is discovered on face or threads.
  4. Replace female coupling or bearings if not spinning freely.

C. Testing for Performance

  1. Install valve on test pump.
  2. Turn on water to pump and open valve to expel air then close valve.
  3. Turn on pump
  4. NFES #000259 and NFES #000231 test at 300 PSI for 3 minutes.
  5. NFES #000904 test at 100 PSI for 3 minutes.
  6. Inspect for leaks around the gasket, at the handles, and around flanges while on test pump.
  7. If valve leaks, repair as necessary, or dispose of through local procedures.
  8. Retest after repairs are made.

D. Repackaging

  1. Ensure item is completely dry prior to packaging.
  2. Packaging: 
    • Use NFES #008064 carton (10” x 8” x 6”) for a standard pack of 50 EA.

 

Share on Social Media

NWCG Latest Announcements

NEW! S-320, Introduction to Incident Management Teams (Blended) Available Now

Date: December 18, 2025
Questions about RT-130? 
Please contact: Incident and Position Standards Committee

NWCG is excited to announce that S-320, Introduction to Incident Management Teams (Blended) is now available on the Wildland Fire Learning Portal!

This blended course combines online learning with instructor-led training, designed for individuals seeking to build leadership skills and gain experience in incident management.

Students are required to complete the prerequisite trainings ICS-100, Introduction to Incident Command System (ICS), ICS-200, Basic ICS for Initial Response, and ICS-700, An Introduction to the National Incident Management System (NIMS) prior to attending S-320.

References:

S-320, Introduction to Incident Management Teams (Blended)

Wildland Fire Learning Portal

New! Ransom Road WFSTAR Module

Date: December 16, 2025
Questions about RT-130? 
Please contact: NWCG Audiovisual Specialist

NWCG is excited to announce the release of the new Ransom Road Fire Module to RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR).

This module features a firsthand account from Rob Lee, official reports, and animated maps of the Ransom Road Fire which occurred on June 8, 1981, in Florida's Merritt Island National Wildlife Refuge.

The module is available now in NWCG's RT-130, WFSTAR Catalog.

References:

WFSTAR Catalog

Wildland Fire Lessons Learned Center

Call for Nominations: Paul Gleason Lead by Example Award

Date: December 11, 2025
Questions? Please contact:
 Leadership Committee 

Do you know someone working in wildland fire who strives to make positive change and is undeterred by obstacles or setbacks? Now is your chance to give that person the acknowledgment they deserve by nominating them for a Paul Gleason Lead by Example Award.

This award, is presented by the NWCG Leadership Committee to remember Paul Gleason's contributions to the wildland fire community and to recognize individuals or groups that exhibit the same spirit and dedication to leadership – those who lead by example.

Nominations can be submitted via email with an attached Lead by Example Form to BLM_FA_Leadership_Feedback@blm.gov or through the online form

Tips for successful nominations and more information can be found on the Lead by Example webpage. All nominations must be submitted by December 31, 2025.

References:

Paul Gleason Lead By Example Award 

Paul Gleason Lead by Example Award Nomination Form 2025 

Leadership Committee 

Coming Soon! Ransom Road WFSTAR Module

Date: December 9, 2025
Questions about RT-130? 
Please contact: NWCG Audiovisual Specialist

On June 8, 1981, the Ransom Road Fire swept across Merritt Island National Wildlife Refuge in Florida, marking a defining moment in wildland fire management. This event led directly to the creation of the U.S. Fish and Wildlife Service's professional fire program.

Later this month, NWCG will release a compelling video that brings the Ransom Road Fire to life through firsthand accounts, official reports, and animated maps. Rob Lee, second on site during the deployment, shares his powerful recollections of that day. 

This video will be going live later this month in NWCG's RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) Catalogue.

References:

WFSTAR Catalogue 

Wildland Fire Lessons Learned Center