Skip to main content

Valve – Wye, Gated, Brass, 3/4” NH-F X 3/4” NF-M X 3/4” NH-M

NFES #
000904
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for the following:
    1. Handles-bent, broken, missing, too tight, too loose, expansion pins coming out or missing, handles correct (left and right) and positioned properly.
    2. Male flange-flange missing, lock-ring and set-screws functional, damaged threads, smooth flat surface on flange, burrs on threads, or loose male flange.
    3. Female coupling-Coupling spins freely, gasket present and in good condition, free of cracks, damage, or burrs on threads.
    4. Casting (body)-Fire damage—look for further damage, O-rings in good condition, corrosion, cracks, and burrs.
    5. Plastic sphere-Inspect sphere while turning handle; if pitted or rough, replace.
  2. Return to stock if item is clean, passes inspection, and is in unused condition.
  3. Refurbish if deficiencies are discovered during the inspection process and item requires cleaning.
  4. Dispose of item if damages are not repairable or item has sustained damage caused by fire.

Refurbishing Procedures

A. Cleaning

  1. Clean in a mild detergent with brush and scouring pad or use parts washer or high-pressure wash to remove foreign matter such as mud, dirt, or grease. Rinse thoroughly.
  2. Do not soak for extended periods of time as detergent will corrode the metal.
  3. Stand upright with barrels in open position to drain water and dry.
  4. Lubricate with appropriate type of lubricant.

B. Repair

  1. Replace missing or damaged O-rings and gaskets.
  2. Replace broken, missing handles.
  3. Repair or replace male flange if damaged is discovered on face or threads.
  4. Replace female coupling or bearings if not spinning freely.

C. Testing for Performance

  1. Install valve on test pump.
  2. Turn on water to pump and open valve to expel air then close valve.
  3. Turn on pump
  4. NFES #000259 and NFES #000231 test at 300 PSI for 3 minutes.
  5. NFES #000904 test at 100 PSI for 3 minutes.
  6. Inspect for leaks around the gasket, at the handles, and around flanges while on test pump.
  7. If valve leaks, repair as necessary, or dispose of through local procedures.
  8. Retest after repairs are made.

D. Repackaging

  1. Ensure item is completely dry prior to packaging.
  2. Packaging: 
    • Use NFES #008064 carton (10” x 8” x 6”) for a standard pack of 50 EA.

 

NWCG Latest Announcements

Quarter Three Materials for the 2025-2026 Wildland Fire Leadership Campaign Now Available

Date:  April 1, 2026
Questions? 
Please contact: Leadership Committee

NWCG is excited to announce that Quarter Three materials for the 2025/2026 Wildland Fire Leadership Campaign are now available. This annual initiative offers all students of leadership and wildland fire management an opportunity to engage with essential leadership skills and knowledge needed to lead effectively in dynamic environments.

Quarter Three materials focus on Leadership Level 3: Leader of People (Develop Intent). Leadership Level 3 is where your values, your team, and your influence come together. Leaders of People put their teams first, build trust, and lead with authenticity. They mentor future leaders and shape decisions up and down the chain.

References:

2025/2026 NWCG Leadership Campaign - Leadership Levels

Wildland Fire Leadership Development Program

Leadership Committee

WFSTAR 2026 Core Components Module Package and 2025 Fire Year in Review Now Available

Date:  March 23, 2026
Questions? 
Please contact: Joe Schindel

The 2026 Core Components Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2025 Fire Year in Review are now available on the NWCG website. The 2026 Core Components Module Package provides all content needed to deliver RT-130.

References:

2026 Core Components Module Package

2025 Fire Year in Review Module

NEW! S-490, Advanced Fire Behavior Calculations (Blended) Available Now

Date:  March 17, 2026
Questions? 
Please contact: Fire Behavior Subcommittee

NWCG is pleased to announce that the new S-490, Advanced Fire Behavior Calculations (Blended), 2026 course is now available.

This training includes performance-based activities that allow students to apply the knowledge and concepts required for the Fire Behavior Analyst (FBAN), Long Term Fire Analyst (LTAN), and Prescribed Fire Burn Boss Type 1 (RXB1) positions. It supports individuals working towards these incident qualifications.

This blended course begins with a self-paced online training (OLT) in the Wildland Fire Learning Portal (WFLP), followed by an in-person instructor-led training (ILT).

References:

S-490, Advanced Fire Calculations (Blended)

NWCG Fire Behavior Analyst (FBAN) Position Page

NWCG Long Term Fire Analyst (LTAN) Position Page

NWCG Prescribed Fire Burn Boss Type 1 (RXB1) Position Page

2024 Paul Gleason Award Winners Announced

Date:  March 13, 2026
Questions? 
Please contact: Leadership Committee

The NWCG Leadership Committee is proud to announce the recipients of the 2024 Paul Gleason "Lead By Example" awards. Award categories include Initiative and Innovation, Mentoring and Teamwork, Motivation and Vision, as well as a Lifetime Achievement Award.

Congratulations to the awardees:

  • Justin Baxter, National Unmanned Aerial System (UAS) Operations Specialist, with the U.S. Forest Service — Initiative and Innovation
  • Kelly Woods, Director of the Wildland Firefighting Lessons Learned Center — Mentoring and Teamwork
  • Doug Booster, Instructor, ProHealth Net, Inc. — Motivation and Vision
  • Pam McDonald, Writer-Editor for the National Interagency Fire Center — Lifetime Achievement Award

References:

Paul Gleason Lead By Example Award

Wildland Fire Leadership Development Program (WFLDP)

Leadership Committee