Skip to main content

Submission of Innovative Ideas

Image
ETC header graphic. photo of firefighter with a hose inset in photo of fire.  Decorative.

Key Points

  • The Innovation Proposal Form must contain:
    • Innovation Proposal
    • Implementation Narrative
    • Safety Narrative
  • The submission of the Innovation Proposal Form may constitute a public disclosure. Please check with the United States Patent and Trademark Office for information and timelines.
  • The Equipment Technology Committee (ETC) or the NWCG partner agencies are not responsible for the cost incurred in the preparation of proposals.
  • Materials submitted to ETC through the Innovation Proposal process may not be returned.
  • Funding for further development of a concept or product is not available through this process.
  • ETC or cooperating agencies may be working on the same or a similar idea already from another individual or organization.

Introduction

This procedure outlines the process for submitting innovative ideas to improve wildland firefighter safety, operating efficiency, and cost reduction. NWCG encourages the submission of innovative ideas or product proposals (collectively, Innovation Proposal) that will contribute to its mission. ETC is chartered under NWCG and is responsible to receive and review these proposals as part of the innovation and program lifecycle process. ETC will review innovative proposals to determine whether the innovation can be practically implemented into wildland fire suppression, prevention, or rehabilitation operations.

Innovative ideas include new technology, significant improvement to existing products or new application of existing technology. Feedback to assist the proponent to develop the concept, idea, or product further will be provided when appropriate. However, this does not imply interest or endorsement of the idea, concept, or product.

Submission of Innovative Proposals

ETC will consider innovation proposals from individuals, organizations, and manufacturers. There are no specific dates for the submission of innovation proposals; however, proposals are only reviewed twice a year. The cutoff dates are March 15 and September 15. Submissions received after the cutoff date will be accepted but not reviewed until after the next cutoff date. Receipt of proposals will be acknowledged via electronic or written communications.

Multiple submissions of an Innovation Proposal to other ETC members or cooperating agency offices are not necessary. This central receipt point is aware of other areas of interest and tries to ensure that each proposal is sent to potentially interested programs.

The proposals will be reviewed fairly and objectively by subject matter experts available to ETC. The proposer will be notified of the results of the review. Correspondence will be sent to the proposer within 60 days after the cut-of date. The proposer will be contacted if more information or time is needed for the response.

The submission of the proposal form constitutes a public disclosure and may affect the application of a patent. Please refer to the United States Patent and Trademark Office for more information. The disclosure of an Idea to ETC does not establish a confidential relationship or obligate ETC and cooperating agencies to treat the idea (or any related materials) as secret or confidential.

What to Submit

Each proposal should be self-contained and written with clarity and thoroughness. The Innovation Proposal, at a minimum, must contain the following items:

  • Innovation Proposal
  • Implementation Narrative
  • Safety Narrative

The Innovation Proposal Form serves as a base document for the proposal.

It is used to assess which program area it is most applicable to. The Innovation Proposal Form is below.

An Implementation and Safety narrative, no more than 500 words, must be included to identify the following:

  • Objectives.
  • Implementation. How the proposed idea could be implemented operationally.
  • Safety and training requirements.

Additional documents such as technical drawings, artist sketches, or product brochures should also be submitted. Concepts must be validated by test results and test methods. Prototypes or product samples may be requested later as part of the evaluation process.

Review Process

The Innovation Proposal document package will be reviewed to determine if further evaluation is warranted. The review panel consists of subject matter experts within the National Technology & Development Program (NTDP) and other cooperating agencies. The review panel will recommend one of the following:

  1. No further action – The proposal does not meet agency needs, is not a new product or application of an existing product, or implementation is beyond the scope of the agency.
  2. Evaluate as part of product lifecycle – The product can be included in a current specification and will be evaluated as part of the lifecycle to improve products covered in that specification.
  3. The proposal meets a need; however, further development beyond the authority of ETC through this program is needed – The proposal may be referred to other programs for consideration if the submitter is looking for funding assistance. Funding for further development of a concept or product is not available through the innovation process.
  4. The proposal has merit; however, more information is needed.

Submissions are reviewed twice annually. Cutoff dates are March 15 and September 15.

Submission Form

  • Receipt of proposals will be acknowledged via electronic or written communications.
  • The submission of the Innovation Proposal Form is entirely voluntary.
  • Multiple submissions are not necessary, your proposal will be shared with other cooperating agencies.

This form is not allowing attachments at this time. Please email your attachments to
NWCG Webmaster BLM_FA_NWCG_Webmaster@blm.gov.

NWCG Latest Announcements

Incident Position Standards and Next Generation Position Task Book Available for Helicopter Crewmember

Date: April 28, 2025
Questions?  Please contact:
Interagency Helicopter Operations Subcommittee

NWCG is excited to announce that the NWCG Incident Position Standards for Helicopter Crewmember, PMS 350-22, and the NWCG Position Task Book for Helicopter Crewmember (HECM), PMS 311-22, are now available.

These resources, part of the Performance Support Package developed through the Incident Performance and Training Modernization (IPTM) effort, support trainees, qualified personnel, and evaluators.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Incident Position Standards for Helicopter Crewmember, PMS 350-22

NWCG Incident Position Standards for Helicopter Crewmember, PMS 350-22

NWCG Position Task Book for Helicopter Crewmember (HECM), PMS 311-22

Updated NWCG Standards for Fire Unmanned Aircraft Systems Operations, PMS 515

Date: April 23, 2025
Questions?  Please contact:
Interagency Fire Unmanned Aircraft Systems Subcommittee

The NWCG Standards for Fire Unmanned Aircraft Systems Operations, PMS 515 standardizes processes and procedures for the interagency use of Unmanned Aircraft Systems (UAS), including pilot inspections and approvals. This updated publication provides the aviation community with standards to ensure UAS are used safely, effectively, and efficiently in support of fire management goals and objectives.

References:

NWCG Standards for Fire Unmanned Aircraft Systems Operations, PMS 515

NWCG National Interagency Aviation Committee

ETC Bulletin 25-001: Retrofitted Hot/Cold Beverage Kits - 2025 Field Season

Date: April 16, 2025
Questions?  Please contact:
Equipment Technology Committee

Due to spout failures and the associated risk of burn injuries, manufacturers have retrofitted the Hot/Cold Beverage Kits using a heat-shrinking band to secure the black spout at the insertion site. The updated kits feature a fluorescent label on each full kit assembly for easy identification. Catering units are encouraged to confirm the clear heat-shrinking bands are intact around each spout before filling.

ETC Bulletin 24-001 regarding Hot/Cold Beverage Kits has been archived and replaced by ETC Bulletin 25-001 for the 2025 season.

References:

NWCG Alerts

ETC-EB-25-001 Retrofitted Hot/Cold Beverage Kits

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)