Date:
Oct 2012
Included the Infrared Interpreter (IRIN) position. IRIN Transition Plan can be found at https://www.nwcg.gov/publications/310-1/pms-310-1-historical-documents.
The Infrared Interpreter (IRIN) directs infrared mapping operations when assigned.
Included the Infrared Interpreter (IRIN) position. IRIN Transition Plan can be found at https://www.nwcg.gov/publications/310-1/pms-310-1-historical-documents.
Position created.