Skip to main content

Pump – 2½”, 6.5 –13HP, Centrifugal

NFES #
007648
Category
Small Engine Equipment
Updated
Storage and Shelf Life Checks
Yes
Storage and Shelf Life Procedure
Date Last Tested (DLT) not to exceed 12 months.

Initial Inspection/Disposal Criteria

  1. Visually inspect for evidence of use (dust, oil, starter seal broken), damage or missing parts.
  2. Return to stock if there is no sign of use or damage and date last tested (DLT) does not exceed 12 months.
  3. Refurbish as necessary if unit has been used or fueled, damaged, or shelf life is exceeded.
  4. Dispose of the unit if it is not economically repairable.

Refurbishment Procedures

A. Cleaning

  1. Remove dirt and oil, using detergent or degreaser as necessary.
  2. Use pressure washer to remove heavy deposits of oil and grease.
  3. Equipment should be repaired and tested as quickly as possible after washing to minimize rust formation on metal parts.

B. Repair

  1. Check for loose and/or missing parts or mounting hardware; tighten or replace as needed.
  2. Inspect power-head (engine) for freeness of all moving parts, ensuring that the crankshaft, piston/cylinder and all engine bearings are not damaged.
  3. Check condition of engine oil, spark plug, air filter, and fuel filter; clean or replace as needed.
  4. Inspect exhaust system; make sure there are no cracks or leaks. Check for loose and/or missing parts and hardware, tighten or replace as needed.
  5. Ensure all decals (operations and warning) are affixed and legible.
  6. Ensure all gaskets on the pump fittings/adapters are in place and functioning properly.

C. Test for Performance

  1. Ensure recoil starter functions properly. Check for damage or fraying of pull cord; repair or replace as necessary.
  2. Engine should start easily, run smoothly, be free from fuel leaks, oil leaks, and provide sufficient power to the pump end.
  3. Ensure engine controls are operational and functional; stop switch, throttle and choke.
  4. Adjust carburetor by setting idle speed to 1200 RPM, Maximum engine speed is 3500 RPM.
  5. Check max PSI with nozzle closed. Minimum pressure: 50 PSI.
  6. Ensure pump packing or mechanical seal is not leaking, repair or replace as necessary.
  7. Should any function fail a test, refer to the manufacturer’s repair manual and troubleshooting guide to correct the problem.
  8. Remove all gasoline from fuel tank and run engine until carburetor is completely empty of gas.

D. Repackaging

  1. Use nylon “zip-tie” to tie off (seal) starter rope to the frame.
  2. Attach certification tag that indicates date last tested (DLT), property #, and name of individual certifying performance.
  3. Ensure that all identification (property #, serial #, owner ID) is affixed and legible.

 

NWCG Latest Announcements

ETC/RMC Safety Bulletin: 25-001 New Guidance on Laundering Wildland Fire Clothing to Reduce Contamination

Date: Aug 8, 2025
Questions? Please contact:
Equipment Technology Committee
 Risk Management Committee

The Equipment Technology Committee (ETC) and the Risk Management Committee (RMC) have issued Safety Bulletin 25-001: Laundering to Decontaminate Wildland Fire Clothing. Recent research revealed that wildland fire flame-resistant pants and shirts can be contaminated with chemicals from combustion byproducts, including carcinogens, and that common laundering practices can effectively remove these harmful contaminants from wildland firefighter clothing more effectively than previously understood. It is recommended to decontaminate wildland fire clothing as frequently as possible. 

Frequently Asked Questions about this new information and how to implement recommendations can be found on the NWCG Alerts page. Read the complete ETC/RMC Safety Bulletin: 25-001 to learn more. 

References:

NWCG Alerts

ETC Safety Bulletin: 25-001

Frequently Asked Questions (FAQ) on Laundering to Decontaminate Wildland Fire Clothing

Equipment Technology Committee

Risk Management Committee

FAQ Now Available for Archiving Type 1 and Type 2 Incident Positions

Date: Aug 6, 2025
Questions? Please contact:
Incident and Position Standards Committee

To support the transition to Complex Incident Management (CIM), NWCG will archive all Type 1 and Type 2 Command and General Staff (C&G) position qualifications in January 2026, as outlined in NWCG Executive Board Memo 25-002. To assist with this transition, a new Frequently Asked Questions (FAQ) document is now available.

This resource answers common questions about the status of Type 1 and Type 2 qualifications, impacts to incident qualification management, training requirements, and resource ordering considerations. Review the full FAQ to learn more.

For additional information on CIM and the transition of C&G positions, see NWCG Executive Board Memos 23-005, 24-005, and 25-002, as well as the Incident Workforce and Development Group webpage.

References:

NWCG Type 1 & Type 2 Position Archiving FAQ

NWCG Executive Board Correspondence

Incident Workforce Development Group

Incident and Position Standards Committee

Incident Position Standards and the Next Generation Position Task Books Now Available for UASD, UASM, UASL and UASP

Date: July 31, 2025
Questions?  Please contact:
Interagency Fire Unmanned Aircraft Systems Subcommittee
 

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Books are now available for all four Unmanned Aircraft Systems positions:

  • Unmanned Aircraft Systems, Data Specialist (UASD)
  • Unmanned Aircraft Systems, Manager (UASM)
  • Unmanned Aircraft Systems, Module Leader (UASL)
  • Unmanned Aircraft Systems Pilot (UASP)

The Performance Support Packages for these positions were developed as part of the Incident Performance and Training Modernization effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1, scheduled for January 2026.

References:

NWCG Unmanned Aircraft Systems, Data Specialist Position Page

NWCG Unmanned Aircraft Systems, Manager Position Page

NWCG Unmanned Aircraft Systems, Module Leader Position Page

NWCG Unmanned Aircraft Systems Pilot Position Page

Incident Position Standards and the Next Generation Position Task Books Now Available for RADO and INCM

Date: July 30, 2025
Questions?  Please contact:
Incident Logistics Subcommittee
 

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Books are now available for Radio Operator (RADO) and Incident Communications Center Manager (INCM).

The Performance Support Packages for these positions were developed as part of the Incident Performance and Training Modernization effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1, scheduled for January 2026.

References:

NWCG Radio Operator Position Page

NWCG Incident Communications Center Manager Position Page