Skip to main content

Valve – Shut Off, 1 1/2”

NFES #
001207
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for obvious damage including burrs and thread damage, gaskets missing or damaged, a female collar that must turn freely if applicable, and inspect for damage caused by fire exposure.
  2. Return to stock if item is clean, passes inspection and is in unused condition.
  3. Refurbish if deficiencies are discovered during the inspection process and item requires cleaning.
  4. Dispose of item if damages are not repairable or item has sustained damage caused by fire.

Refurbishing Procedures

A. Cleaning

  1. Clean in a mild detergent with brush and scouring pad or use parts washer or high pressure wash to remove foreign matter such as mud, dirt or grease. Rinse thoroughly.
  2. Do not soak for extended periods of time as detergent will corrode the metal.
  3. Stand upright with barrel in open position to drain water and dry.

B. Repair

  • Replace missing or damaged gaskets or components that are serviceable.

C. Testing for Performance

  1. Install valve on test pump.
  2. Turn on water to pump and open valve to expel air then close valve.
  3. Turn on pump
  4. NFES #001201 and NFES #001207 test at 300 PSI for 3 minutes.
  5. NFES #000835 and NFES #000738 test at 100 PSI for 3 minutes.
  6. Inspect for leaks around the gasket and at the handles while on test pump.
  7. If valve leaks, repair as necessary or dispose of through local procedures.
  8. Retest after repairs are made.

D. Repackaging

  1. Ensure item is completely dry prior to packaging.
  2. Packaging:
    • Use NFES #008066 carton (12” x 9” x 10”) for the following: NFES #001201, #001207 standard pack of 20 EA per carton. 
    • Use NFES #008064 carton (10” x 8” x 6”) for the following: NFES #000835 standard pack of 50 EA per carton. 
    • Use NFES #008076 carton (8” x 4” x 4”) for the following: NFES #000738 standard pack of 10 EA per carton.

 

NWCG Latest Announcements

RMC Memorandum 26-02: SAFENET Modernization and SafeNetX Launch

Date:  June 25, 2026
Questions? 
Please contact: Risk Management Committee

The Risk Management Committee (RMC) is pleased to announce the launch of SafeNetX, the modernized safety reporting system now available to the wildland fire community. Effective June 15, 2026, SafeNetX enables reporting of unsafe, unhealthy, near-miss, and high-risk operations across wildland fire, all-hazard incidents, training, and related work environments.

SafeNetX is the result of a multi-agency modernization effort led by RMC, which began evaluating improvements to the legacy SAFENET system in 2021. To learn more, read the full RMC memorandum in the links provided.

References:

SafeNetX

RMC Safety Memorandum 26-02: SAFENET Modernization and SafeNet X Launch

2025 Wildland Fire EMS Awards

Date:  June 12, 2026
Questions? 
Please contact: Emergency Medical Committee

The NWCG Emergency Medical Committee (EMC) announces the recipients of the 2025 Wildland Fire Emergency Medical Service (EMS) Awards. EMC annually recognizes individuals and groups who have demonstrated outstanding actions or accomplishments that are above and beyond the expectation of one’s normal mission or job duties.

Congratulations to all the awardees and nominees. Through leadership and initiative, they have made significant contributions to the safety of the wildland fire community. These awards are well deserved.

References:

2025 Wildland Fire EMS Awards

Emergency Medical Committee

Incident Position Standards and the Next Generation Position Task Book Now Available for RAMP

Date:  June 12, 2026
Questions? 
Please contact: Airtanker Base Operations Unit

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Book are now available for Ramp Manager (RAMP).

The Performance Support Package for this position was developed as part of the Incident Performance and Training Modernization effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1, scheduled for release in January 2027.

References:

NWCG Ramp Manager Position Page

National Interagency Aviation Committee

Make an Impact: Serve the Wildland Fire Community as an IPTM SME!

Date:  June 11, 2026
Questions? 
Please contact: NWCG SME Specialist

Note: Positions with an * will last approximately 6 months.
Positions with ** will last 12 - 18 months.

NWCG is seeking experienced wildland firefighters and support personnel to serve as Subject Matter Experts (SMEs) for the Incident Performance and Training Modernization (IPTM) initiative. IPTM aims to transition NWCG’s training and qualification system to a performance-based model by updating position descriptions, Incident Position Standards, Next Generation Position Task Books (Next Gen PTBs), and training where needed.

NWCG is currently recruiting SMEs for the Fall 2026 positions listed below:

  • Equipment Manager (EQPM)*
  • Fixed Wing Parking Tender (FWPT)**
  • Mixmaster (MXMS)*
  • Public Information Officer Complex (PIOC)*
  • Retardant Crewmember (RTCM)*
  • Strike Team Leader Crew (STCR)*
  • Strike Team Leader Engine (STEN)*
  • Strike Team Leader Heavy Equipment (STEQ)*
  • Task Force Leader (TFLD)**
  • Wildland Fire Investigator (INVF)** 

Projects begin October 2026. Sign up by July 10, 2026, at the link below and review the attached document for additional details. 

References:

NWCG SME Interest Sign-up

IPTM Subject Matter Expert Duties and Expectations Document

Incident Performance and Training Modernization (IPTM)