Skip to main content

Valve – Shut Off, 1 1/2”

NFES #
001207
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for obvious damage including burrs and thread damage, gaskets missing or damaged, a female collar that must turn freely if applicable, and inspect for damage caused by fire exposure.
  2. Return to stock if item is clean, passes inspection and is in unused condition.
  3. Refurbish if deficiencies are discovered during the inspection process and item requires cleaning.
  4. Dispose of item if damages are not repairable or item has sustained damage caused by fire.

Refurbishing Procedures

A. Cleaning

  1. Clean in a mild detergent with brush and scouring pad or use parts washer or high pressure wash to remove foreign matter such as mud, dirt or grease. Rinse thoroughly.
  2. Do not soak for extended periods of time as detergent will corrode the metal.
  3. Stand upright with barrel in open position to drain water and dry.

B. Repair

  • Replace missing or damaged gaskets or components that are serviceable.

C. Testing for Performance

  1. Install valve on test pump.
  2. Turn on water to pump and open valve to expel air then close valve.
  3. Turn on pump
  4. NFES #001201 and NFES #001207 test at 300 PSI for 3 minutes.
  5. NFES #000835 and NFES #000738 test at 100 PSI for 3 minutes.
  6. Inspect for leaks around the gasket and at the handles while on test pump.
  7. If valve leaks, repair as necessary or dispose of through local procedures.
  8. Retest after repairs are made.

D. Repackaging

  1. Ensure item is completely dry prior to packaging.
  2. Packaging:
    • Use NFES #008066 carton (12” x 9” x 10”) for the following: NFES #001201, #001207 standard pack of 20 EA per carton. 
    • Use NFES #008064 carton (10” x 8” x 6”) for the following: NFES #000835 standard pack of 50 EA per carton. 
    • Use NFES #008076 carton (8” x 4” x 4”) for the following: NFES #000738 standard pack of 10 EA per carton.

 

NWCG Latest Announcements

NEW! S-130, Firefighter Training (Blended) Now Available

Date: June 10, 2025
If you have questions, please visit our FAQ page. 
If your question is not answered there, you can 
submit your question using our Contact Us form. 
 

The S-130, Firefighter Training (Blended), equips new wildland firefighters with essential skills through a mix of online learning and hands-on training. The course features a required online component and an instructor-led exercise, reinforcing online concepts with practical performance-based training.

The course builds competencies in wildland fire operations, safety, and equipment use, applicable across various operational environments. Both the online component and instructor-led field exercise must be completed to receive a certificate of completion. Students are required to finish the prerequisite S-190, Introduction to Wildland Fire Behavior, before enrolling in S-130, Firefighter Training (Blended).

References:

S-130, Firefighter Training (Blended)

S-190, Introduction to Wildland Fire Behavior

Wildland Fire Learning Portal

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

Date: June 3, 2025
Questions?  Please contact:
Emergency Medical Committee

The Emergency Medical Committee has issued interim guidance for Rapid Extraction Module Support (REMS) teams. Until further notice, Type I and II REMS teams must designate a team leader qualified at Firefighter Type 1 Squad Boss (FFT1) or higher. This temporary change replaces the Single Resource Boss (SRB) requirement, which is currently not feasible due to administrative barriers.

This memorandum does not include any other changes to the NWCG Standards for Rapid Extraction Module Support, PMS 552. This interim change takes effect immediately and will remain in place until further notice.

References:

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

NWCG Standards for Rapid Extraction Module Support, PMS 552

Equipment Bulletin 25-002: Chaps, Chain Saw, M-2020, Nonconformities Affecting Use, Appearance, and Serviceability

Date: June 2, 2025
Questions?  Please contact:
Equipment Technology Committee

The Equipment Technology Committee issued Equipment Bulletin: 25-002 to address a manufacturing nonconformity affecting Forest Service specification, 6170-4K Chain Saw Chaps. The issue applies to chaps manufactured in 2024 and 2025 and distributed through FedMall. These chaps may have incorrectly bound edges that expose inner protective layers.

Independent purchasers should inspect all chain saw chaps received from FedMall beginning in 2024, prior to use. Review the full Equipment Bulletin: 25-002 for inspection criteria and recommended actions.

References:

NWCG Alerts

ETC Equipment Bulletin: 25-002

2024 Wildland Fire Emergency Medical Service Awards

Date: May 22, 2025
Questions?  Please contact:
Emergency Medical Committee

The NWCG Emergency Medical Committee (EMC) is proud to announce the recipients of the 2024 Wildland Fire Emergency Medical Service Awards. Each year, EMC recognizes individuals and groups who have demonstrated exceptional actions or accomplishments that go above and beyond their normal mission or job duties.

Congratulations to all the awardees and nominees. Through leadership and initiative, they have made significant contributions to the safety and well-being of the wildland fire community. These honors are well deserved.

References:

2024 Wildland Fire EMS Awards

NWCG Emergency Medical Committee