Skip to main content

PMS 530-1

Contracts

NWCG Committee Realignment Website Updates: Content will continue to be updated over the coming days as we work through final reviews and adjustments, and all publications and products are currently under revision.

Large Airtanker (LAT) Risk Assessments

Aircraft | Contracts | Operations | Personnel

SYSTEM:  Large Airtanker, Contracts


Sub-System Hazards Pre-Mitigation Mitigation Post-Mitigation

Probability

Severity

Risk Level

Probability

Severity

Risk Level

Contract Management Unfamiliar with exclusive use vs call-when-needed

Almost Certain

Moderate

High

Educate dispatch centers, ATBMs, and fire management on the differences between the contract types and ordering processes. Provide contracts to all end users, regardless of agency. Ensure CORs and COs are available for questions from end users.

Possible

Negligible

Low

Not enough CORs to manage contract line items

Almost Certain

Moderate

High

Encourage more aviation-specific COR training. Provide information and assistance on becoming a COR for LAT/VLAT contracts, regardless of agency. Develop an incentive program for the CORs additional duties.

Possible

Moderate

Medium

Lack of home bases may affect quality and timeliness of maintenance on aircraft

Likely

Catastrophic

Extremely High

Ensure contractors have a maintenance area for required scheduled maintenance, inspections/overhauls of engines and aircraft components. Coordinate with maintenance inspectors on all unscheduled maintenance. Assist contractors with obtaining airport security clearance for working overnight at airports.

Unlikely

Critical

Medium

 

Download the Word version (docx) of this information and the Risk Assessment Matrix (pdf) to use with the Risk Assessment Worksheet (docx).

 

 

Last Modified / Reviewed:

NWCG Latest Announcements

Intermediate Faller (FAL2) Position Task Book Update

Date:  July 24, 2026
Questions? 
Please contact: Tree Felling Subcommittee

NWCG Operations Management Committee (OMC) has issued an update to the NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91. To ensure clarity for both trainees and evaluators, the updated FAL2 Position Task Book (PTB) explicitly states who is authorized to sign off on your tasks:

“Evaluators must be qualified as a FAL2, or an Advanced Faller (FAL1).”

If you are currently working out of a previously published version of the FAL2 PTB, you do not need to restart. However, OMC highly encourages you to take the following step to prevent any confusion in the field:

  • Print and replace the updated evaluator information page (page 2) in your current physical PTB.

References:

Intermediate Faller (FAL2) Position Page

RMC Memo 26-01: Transition Plan for Implementing Updates to Intermediate Faller (FAL2) Position Qualifications

NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Date:  July 10, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics/Equipment Management Committee (LMC) has released Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups. This advisory highlights multiple U.S. Forest Service regions reporting front driveline joint failure incidents.

This advisory recommends firefighters and fire managers to: 

  • Follow all Ram-issued inspection, maintenance, and service guidance for front driveline joints. 
  • Consider installing a driveline loop. 
  • Coordinate with fleet managers and service providers to determine the most appropriate driveline loop kit for each pickup.

For further details, please refer to the complete advisory.

References:

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Technical Service Bulletin: 03-002-21

NEW! NWCG Standard Operating Procedures, PMS 900

Date:  July 9, 2026
Questions? 
Please contact: NWCG Staff

NWCG is excited to announce the publication of the NWCG Standard Operating Procedures, PMS 900.

The new publication establishes general, consistent, and uniform standards for conducting business with the National Wildfire Coordinating Group.

References:

NWCG Standard Operating Procedures, PMS 900

Quarter Four Materials for the 2025-2026 Wildland Fire Leadership Campaign Now Available

Date:  July 8, 2026
Questions? 
Please contact: Leadership Development Subcommittee

NWCG is excited to announce that Fourth Quarter materials for the 2025/2026 Wildland Fire Leadership Campaign are now available. This annual initiative offers all students of leadership and wildland fire management an opportunity to engage with essential leadership skills and knowledge needed to lead effectively in dynamic environments.

Quarter Four materials focus on Leadership Level 4: Leader of Leaders (Provide Direction). Leadership Level 4 is where you are setting the conditions for others to do things well, even when you are not present. This quarter focuses on equipping experienced leaders with skills to provide direction, build trust across teams, and foster strong decision making. 

References:

2025/2026 NWCG Leadership Campaign - Leadership Levels

Wildland Fire Leadership Development Program

Leadership Development Subcommittee