Skip to main content

PMS 448

Net – Cargo, 15’X 15’, 6,000 lb. Capacity

NFES #
000458
Category
Aviation
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria  

  1. Inspect for fraying or deterioration of lines. Ultraviolet exposure is the most important factor in the degradation of the strength of the cargo nets constructed from polypropylene rope, not use or age. There is no visual or other field inspection technique that will guarantee that a cargo net is free from degradation due to ultraviolet exposure. However, if the net is free of brittleness, has no more than 10 percent broken strands in any two adjacent cycles, and there is no chalking or other visible damage, then the net is probably safe for further use.
    • Inspect for more than 10 percent of strands in any two adjacent cycles of the net being broken.
    • Inspect for brittleness by bending several areas of the nets rope 180 degrees back on itself. If more than two strands break per bend, dispose of net, or return to manufacturer for repair.
    • Inspect for chalking by running a lightly grasped hand over several of the ropes in the net. If small, white, chalk-like fragments of the rope come off in your hand then chalking has occurred. If chalking is present, it is likely that the net has received enough ultraviolet exposure to cause embrittlement and the net must be further inspected for broken strands.
  2. Inspect all ropes for fraying, burns, or wear points. All netting cord strands at splices and terminations should be free of fraying and unraveling. Netting terminations on the perimeter rope (purse strings) must have a metal thimble. All splices and terminations shall incorporate a minimum of four tucks back into the netting ropes. All rope terminations and splices should be visually inspected for the minimum number of tucks. Note that due to the length of some of the rope ends past the splice, some rope ends were tucked between other rope strands to constrain the extra rope. This is an acceptable condition for the net.
    • NFES 000458 cargo nets manufactured by Lift-It Manufacturing, Inc. in 2016 under contract number AG-82X9-P-16-6013 will have rubber electrical tape wrapping the polypropylene rope ends. Inspect rope ends to ensure tape is in place. If there is no tape, see Cache Memo 20-02 and taping instructions in Reference Section below for additional information.
  3. Inspect netting for contamination by fuel oils or other liquids considered degenerative to netting.
  4. Verify an identification tag is attached to every net. If a tag is not attached, attach one but only if the chain of custody can be verified. There are many companies that make similar looking nets that are not of the same capacity. If the chain of custody cannot be verified, the net must be taken to a net manufacturer and proof tested to twice its Workload (e.g., tested to 6,000 lbs.) for a 3,000 lb. net. (Note: It has been found that the cost to perform this test for a net missing its tag is about ¾ the cost of new net. The custodian of the net should consider the economics before sending the net out for proof testing.)
    • Replacement tag info should include NFES #, Working Load Limit (WLL) in pounds, i.e., 3,000 lbs. /6,000 lbs., cache identifier and date.
    • Inspect loop thimbles for cracks, wear, and deformation. Ensure thimbles are not loose from net and easily removed.
    • On some heavy cargo nets (NFES #000458), the mesh intersections are fixed with molded plastic crosses. These should be visually inspected for cracks and missing parts. Remove from service if broken or missing components are identified.
    • Any NFES #000795 net that is constructed of black mesh must be taken out of service.
    • Return to stock if items pass inspection, are clean, and in unused condition.
    • Refurbish if deemed necessary through inspection and repairs economically feasible.
  5. Dispose of item if refurbishment or repair will not correct deficiencies identified during the inspection process.

Refurbishing Procedures

A. Cleaning

  1. Clean all dirt from netting.
  2. Remove all flagging, string, and rope.
  3. Hang or stack polypropylene nets and clean with water from high-pressure hose.
  4. Dry completely before packaging.

B. Repairs

Any repairs should be completed by net manufacturers.

C. Testing for Performance

none

D. Repackaging

Suggested cartons are: 

  • Package 1 each in NFES #000645 carton (42” X 13.5” X 14”)

 

NWCG Latest Announcements

Leadership Committee IAP Flyer Now Available

Date:  May 8, 2026
Questions? 
Please contact: Leadership Committee

The NWCG Leadership Committee promotes and enables leadership development across the wildland fire service. The committee provides education, training opportunities, and support for leadership innovation and best practices throughout the community.

A new IAP flyer is now available on the committee website, offering an overview of the products, curriculum, and learning opportunities the Leadership Committee develops. This resource is ideal for posting in your office, sharing with new employees, or distributing through your incident management teams to engage new voices in the leadership journey and reinforce a culture of self‑reflection, development, and growth.

References:

Leadership Committee 2026 IAP Flyer

Incident Operations Subcommittee Updates the Next Generation Position Task Book for FFT1

Date:  May 7, 2026
Questions? 
Please contact: Incident Operations Subcommittee

The NWCG Incident Operations Subcommittee (IOSC) has updated the NWCG Position Task Book for Firefighter Type 1 (Squad Boss) (FFT1), PMS 311‑14. The FFT1 Position Task Book transitioned to the Next Generation (Next Gen PTB) format in June 2025 through the Incident Performance and Training Modernization effort. Since then, IOSC has received feedback from the wildland fire community regarding coding for one of the tasks. Task #13 has been updated to include the option of evaluation in a simulation.

See IOSC Memorandum 26‑01: Transition Plan for Implementation of Updates to the NWCG Position Task Book for Firefighter Type 1 (Squad Boss) (FFT1), PMS 311‑14 for more information.

References:

IOSC Memorandum 26-01: Transition Plan for Implementation of Updates to the NWCG Postion Task Book for Firefighter Type 1

NWCG Firefighter Type 1 Squad Boss Position Page 

NEW! S-212, Intermediate Faller (Online) Course Available Now 

Date:  April 23, 2026
Questions? 
Please contact: Hazard Tree and Tree Felling Subcommittee

NWCG is pleased to announce that the new S‑212, Intermediate Faller (Online), course is now available on the Wildland Fire Learning Portal (WFLP). This second course in the series provides students with the knowledge and skills required to perform the duties of an Intermediate Faller (FAL2), as described in the FAL2 Incident Position Description. This course is intended for individuals seeking to advance from Basic Faller (FAL3) to FAL2.

S‑212, Intermediate Faller is a fully online, self‑paced training program consisting of 13 units. Learners will engage with interactive, scenario‑based content designed to progressively build foundational skills and knowledge essential for the FAL2 role.

Students must be qualified as a Basic Faller (FAL3) prior to enrolling in S‑212, Intermediate Faller course.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1, scheduled for January 2027.

References:

S-212 Intermediate Faller (Online)

RMC Memo 26-01: Transition Plan for Implementing Updates to Intermediate Faller (FAL2) Position Qualifications

Intermediate Faller (FAL2) Position Page

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212

New Aircraft Flight Schedule Form, PMS 249

Date:  April 17, 2026
Questions? 
Please contact: National Coordination System Committee

A new publication from the National Coordination System Committee (NCSC) is now available. The NWCG Aircraft Flight Schedule Form, PMS 249, will be used for aviation crews and dispatch to share flight information that is needed for resource tracking, and if needed, for emergency procedures.

For further details, please contact your NCSC representative. 

References:

NCSC Memo 26-01: Implementation of NWCG Aircraft Flight Schedule Form, PMS 249

NWCG Aircraft Flight Schedule Form, PMS 249