Skip to main content

Nozzle – Plastic, 35 GPM, 1” NPSH-F

NFES #
000138
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for burrs and cracks, broken plastic, or fire damage. Inspect gasket and replace if missing, cracked, or stiff.  Inspect for screw and nylon washer.  Inspect hose coupling threads for damage.
  2. Barrel must turn freely.
  3. Return to stock if nozzle functions properly, is free of damage and clean.
  4. Refurbish if nozzle is repairable.
  5. Dispose of any nozzle that is damaged beyond repair, has burn damage, or fails Testing for Performance and deficiencies cannot be corrected. Old style KK: Inspect threads inside of barrel; if they are damaged, dispose of nozzle.

Refurbishing Procedures

A. Testing for Performance

  1. Replace gasket if necessary.
  2. Connect nozzles to pump or manifold. Confirm connection ends are not out of round and there is no damage to threads.
    1. Pressure Test:
      1. Start pump.
      2. Make sure nozzles are open. Let all air escape. Shut nozzles.
      3. Pressurize to 300 PSI and hold for 3 minutes
  3. Inspect for leak:
    • Around the gasket
    • Behind the barrel
    • The tip of the barrel
      ​Note: Due to manufacturing processes a water tight shut-off seal on NFES #000137 and #000138 is very difficult to attain. Minimal drips or slight mist spray from the tip are acceptable for RFI condition.

B. Cleaning

  1. All items will be washed and cleaned of foreign matter, such as mud, dirt, and grease. Clean in a mild detergent with brush and scouring pad, or high pressure wash as needed. Do not soak for extended periods of time as the detergent will corrode the metal.
  2. Rinse thoroughly.
  3. Stand upright with barrel in open position to drain water and dry.
  4. Lubricate threads on back of the barrel with appropriate dry lubricant (graphite).

C. Repair

  1. Replace gaskets, washers or screws as needed.
  2. If plastic nozzle is found defective, dispose (NFES #000137, #000138).

D. Retesting

  • Following completion of any repairs, retesting of nozzles must be completed following Testing for Performance, above.

E. Repackaging

  • Stand upright and dry completely prior to repackaging.
    • Use NFES #008064 carton (10” x 8” x 6”)
    • Use NFES #008018 carton (12” x 12” x 6”) 10 PER CARTON 
    • Use NFES #008017 carton (18” x 12” x 10”) 60 PER CARTON

 

NWCG Latest Announcements

NWCG Risk Management Committee Releases Safety Bulletin: 24-001 Use of Respirators on Wildland Fires

Date: November 7, 2024
Contact: Risk Management Committee

The Risk Management Committee (RMC) has released Safety Bulletin: 24-001 Use of Respirators on Wildland Fires. As wildland fire respirators are available through several established vendors, wildland fire personnel need to understand regulations and limitations of respirator use in the workplace.

Safety Bulletin 24-001 outlines the following topics regarding respirator use for wildland fires:

  • Requirements for Respirator Use
  • Voluntary Respirator Use
  • Current Respirator Options
  • Unknown Risks of Respirator Use

This bulletin also provides mitigation recommendations to help reduce smoke exposure for wildland firefighting efforts.

References:

NWCG Safety Bulletin: 24-001 Use of Respirators on Wildland Fires

NWCG Smoke Management Guide for Prescribed Fire, PMS 420-3

VIDEO: Protecting Wildfire Personnel from Smoke - How Incident Management Teams Address Smokes Risks

VIDEO: Smoke, Knowing the Risks

The Incident Position Standards and Next Generation Position Task Book are now available for Medical Unit Leader (MEDL)

Date: October 16, 2024
Contact: Incident Medical Subcommittee

NWCG is excited to announce that the NWCG Incident Position Standards for Medical Unit Leader, PMS 350-39 and NWCG Position Task Book for Medical Unit Leader (MEDL), PMS 311-39 are now available.

The Performance Support Package, which for MEDL includes the Incident Position Standards and Next Generation Position Task Book, were developed through the Incident Performance and Training Modernization (IPTM) effort. The Performance Support Package will support trainees, those qualified in the position, and evaluators.

References:

NWCG Medical Unit Leader Position Page

NWCG Incident Position Standards for Medical Unit Leader, PMS 350-39

NWCG Position Task Book for Medical Unit Leader (MEDL), PMS 311-39

The Wildland Fire Learning Portal is Now Available

Date: October 9, 2024
Contact: Wildland Fire Learning Portal

The Wildland Fire Learning Portal (WFLP) is back online following a migration to a new learning management system (LMS) application. The WFLP team is actively addressing any issues that may arise as a result of the update, and appreciates your patience as the team works to enhance your experience. NWCG will share information from the WFLP as it is available.

Should you have any issues with accessing or using the WFLP, please use the link below to submit a ticket through the Help Center.

References:

Wildland Fire Learning Portal

Wildland Fire Learning Portal Help Center

NWCG Equipment Technology Committee Releases New Equipment Bulletins

Date: September 27, 2024
Contact: Equipment Technology Committee

The Equipment Technology Committee (ETC) has released three new Equipment Bulletins:

  • ETC-EB-24-003 Diesel exhaust fluid (DEF) in fuel containers.
  • ETC-EB-24-004 Two-compartment fuel and oil container (Dolmar) unavailable in the United States (US) and reminders for upkeeping current inventories.
  • ETC-EB-24-005 Personal Protective Equipment (PPE): Inspection, Care, and Maintenance.

These bulletins remind field going personnel of important issues related to equipment for wildland firefighting efforts.

References:

NWCG Alerts

ETC-EB-24-003 Diesel exhaust fluid (DEF) in fuel containers

ETC-EB-24-004 Two-compartment fuel and oil container (Dolmar) unavailable in the United States (US) and reminders for upkeeping current inventories

ETC-EB-24-005 Personal Protective Equipment (PPE): Inspection, Care, and Maintenance