Skip to main content

Wye – Plain, 1” X 1” X 1” NPSH

NFES #
000839
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

This item has been deleted from the NFES catalog.

Initial Inspection/Disposal Criteria

  1. Inspect threads for damage and cracks. Inspect for damaged, missing or stiff gaskets.
  2. Return to stock if item is clean, passes inspection, and is in unused condition.
  3. Refurbish if item has been used, cleaning and testing are required or components need to be replaced.
  4. Dispose of item if it is damaged beyond repair or had damage due to fire exposure.

Refurbishing Procedures

A. Cleaning

  1. High pressure wash or clean in a mild dishwashing detergent with a brush or scouring pad as needed to remove all mud, dirt, and grease.
  2. Do not soak for extended periods of time as detergent will corrode the metal.
  3. Stand upright with barrels in open position to drain water and dry.

B. Repair

  • Replace missing or damaged gaskets.

C. Testing for Performance

  1. Install wye on test pump and cap male ends.
  2. Turn on water to pump and open caps to expel air then close.
  3. Turn on pump.
  4. NFES #000839 and NFES #000883 test at 300 PSI for 3 minutes.
  5. NFES #000739 test at 100 PSI for 3 minutes.
  6. Inspect for leaks.
  7. Retest after repairs are made.

D. Repackaging

  1. Ensure item is completely dry prior to packaging.
  2. Packaging:
    • ​​NFES #000739, 60 EA in NFES#008064 carton (10” x 8” x 6”).
    • NFES #000839 and #000883 - Local cache option.

 

NWCG Latest Announcements

WFSTAR 2025 Core Component Module Package and 2024 Fire Year in Review Now Available

Date: March 14, 2025
Questions?  Please contact:
Joe Schindel at mschindel@blm.gov
 

The 2025 Core Component Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2024 Fire Year in Review are now available on the NWCG website. The 2025 Core Component Module Package provides all content needed to deliver RT-130.

References:

2025 Core Component Module Package

2024 Fire Year in Review Module

NEW! NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053

Date: March 12, 2025
Contact: Wildland Urban Interface Mitigation Committee

The NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 provides mitigation practitioners at all experience levels with recommendations on the most effective and efficient ways to accomplish mitigation work in communities at risk to wildfire damage or destruction. The content in this guide was written in coordination with the NWCG Standards for Mitigation in the Wildland Urban Interface, PMS 052.

References:

NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514