Skip to main content

PMS 530-1

Personnel, Government

Helicopter Operations Risk Assessments

Aircraft | Facilities | Operations | Personnel Contractors | Personnel Government | Technology


SYSTEM:  Helicopter Operations, Personnel (Government)

Sub-System Hazards Pre-Mitigation Mitigation Post-Mitigation

Probability

Severity

Risk Level

Probability

Severity

Risk Level

Policy Operational and mission goals during all-hazard assignments may be unstated or unclear and may conflict with interagency standards and policy

Likely

Critical

Extremely High

Adequate in-brief and dissemination of Commander's intent. Clarification of scope of authority and policy in place.  Adhere to interagency policy, procedures and guidelines (e.g., NSHO). If unable to perform duties utilizing interagency policy, perform a separate risk assessment with appropriate approval sign off. Ensure personnel are working within the scope of their employment. Implementation of Aviation Doctrine may further mitigate conflicts between direction and policy.

Possible

Critical

High

Training Unable to bring seasonals on early enough to provide all the required training prior to sending on incidents

Almost Certain

Critical

Extremely High

Ensure line officers are committed to providing adequate time and funding to develop personnel as necessary.

Possible

Critical

High

Lack of Crew Resource Management (CRM)

Likely

Critical

Extremely High

Provide adequate time for training and provide time for Modules to develop CRM prior to field season.  Provide training in CRM for Modules annually. Brief/debrief, maintain positive attitude.

Possible

Critical

High

Human Factors Fatigue/burnout due to incident duration as well as year-round All Risk incident support

Likely

Critical

Extremely High

Adhere to work/rest guidelines. Monitor fatigue levels of crews. Rotate personnel and helicopter programs to manage fatigue and burnout. Manage number and duration of assignments. Ensure adequate time off and provide quality R and R while on assignments.

Possible

Critical

High

Acceptance of high-risk missions as normal

Likely

Catastrophic

Extremely High

Review risk assessment and existing policy/procedures, brief/debrief with all personnel and utilize risk management tools to include Go-No-Go Checklists. Educate personnel on the hazards of normalization of risk and complacency. Mission decision made at appropriate level. Must have better communication and collaboration between Operations and Aviation.

Unlikely

Catastrophic

High

High workload for Maintenance Inspectors may compromise their ability to perform thorough inspections.  Standard inspections criteria not followed consistently among agencies or regions

Likely

Critical

Extremely High

Increase amount of personnel available to perform the duties of Maintenance Inspector in proportion with span of control. Ensure inspection standards are developed and maintained by agencies.

Unlikely

Critical

Medium

Conflicting personalities resulting in hazardous attitudes

Possible

Critical

High

If individuals cannot professionally resolve differences, managers and supervisors must intervene immediately. Brief/debrief, employ CRM, provide honest and objective feedback, maintain positive attitude. Maintain professionalism and mission focus at all times.

Unlikely

Critical

Medium

 

Download the Word version (docx) of this information and the Risk Assessment Matrix (pdf) to use with the Risk Assessment Worksheet (docx).

 

 

Last Modified / Reviewed:

NWCG Latest Announcements

2025 Wildland Fire EMS Awards

Date:  June 12, 2026
Questions? 
Please contact: Emergency Medical Committee

The NWCG Emergency Medical Committee (EMC) announces the recipients of the 2025 Wildland Fire Emergency Medical Service (EMS) Awards. EMC annually recognizes individuals and groups who have demonstrated outstanding actions or accomplishments that are above and beyond the expectation of one’s normal mission or job duties.

Congratulations to all the awardees and nominees. Through leadership and initiative, they have made significant contributions to the safety of the wildland fire community. These awards are well deserved.

References:

2025 Wildland Fire EMS Awards

Emergency Medical Committee

Incident Position Standards and the Next Generation Position Task Book Now Available for RAMP

Date:  June 12, 2026
Questions? 
Please contact: Airtanker Base Operations Unit

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Book are now available for Ramp Manager (RAMP).

The Performance Support Package for this position was developed as part of the Incident Performance and Training Modernization effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1, scheduled for release in January 2027.

References:

NWCG Ramp Manager Position Page

National Interagency Aviation Committee

Make an Impact: Serve the Wildland Fire Community as an IPTM SME!

Date:  June 11, 2026
Questions? 
Please contact: NWCG SME Specialist

Note: Positions with an * will last approximately 6 months.
Positions with ** will last 12 - 18 months.

NWCG is seeking experienced wildland firefighters and support personnel to serve as Subject Matter Experts (SMEs) for the Incident Performance and Training Modernization (IPTM) initiative. IPTM aims to transition NWCG’s training and qualification system to a performance-based model by updating position descriptions, Incident Position Standards, Next Generation Position Task Books (Next Gen PTBs), and training where needed.

NWCG is currently recruiting SMEs for the Fall 2026 positions listed below:

  • Equipment Manager (EQPM)*
  • Fixed Wing Parking Tender (FWPT)**
  • Mixmaster (MXMS)*
  • Public Information Officer Complex (PIOC)*
  • Retardant Crewmember (RTCM)*
  • Strike Team Leader Crew (STCR)*
  • Strike Team Leader Engine (STEN)*
  • Strike Team Leader Heavy Equipment (STEQ)*
  • Task Force Leader (TFLD)**
  • Wildland Fire Investigator (INVF)** 

Projects begin October 2026. Sign up by July 10, 2026, at the link below and review the attached document for additional details. 

References:

NWCG SME Interest Sign-up

IPTM Subject Matter Expert Duties and Expectations Document

Incident Performance and Training Modernization (IPTM)

RMC Safety Bulletin 26-001: Rhabdomyolysis in Wildland Firefighters

Date:  May 28, 2026
Questions? 
Please contact: Risk Management Committee

The Risk Management Committee (RMC) has issued Safety Bulletin 26-001: Rhabdomyolysis in Wildland Firefighters. Research from 2016 to 2025 shows that 88 cases of rhabdomyolysis (rhabdo) were reported. Analysis of reports from eSafety, the Safety Management Information System (SMIS), and the Wildland Fire Lessons Learned Center (LLC) indicates that rhabdo is common during this time of year due to Work Capacity Tests and contributing factors such as weather, hydration, nutrition, and medication or supplement use.

RMC issued this safety bulletin to raise awareness in the Wildland Fire Community, and to provide research findings and educational resources that support reducing future cases of rhabdo.

References:

NWCG Alerts

RMC Safety Bulletin 26-001: Rhabdomyolysis in Wildland Firefighters