Skip to main content

Simultaneous Loading and Fueling (SL+F) Airtankers

 

SL+F is a relatively new process for airtankers, having been approved in 2014. When done correctly, it is very safe and reduces time spent on the ground, which makes delivery of fire retardant to the incident more expeditious. Only airtankers with nationally-approved risk assessments and procedures specific to SL+F will be allowed to take part in the procedure.

Each base that plans to take part in SL+F of airtankers must have a written plan approved by their regional/state Aviation Officer/Manager or equivalent.

Discuss process, procedures, and personnel needed to execute a SL+F.

  • Have all current ramp personnel reviewed the plan and had training specific to SL+F?
  • Only the Airtanker Base Manager (ATBM), in agreement with the pilot, can request to SL+F. Discuss the regularity at which this operation takes place.
    • What are the trigger points and how is the decision communicated to the Ramp Manager (RAMP)?
  • At your base, will the Fixed Wing Parking Tender (FWPT) have full view of both the retardant loading and fueling operation in all parking configurations? Discuss where the FWPT must stand in order to observe the entire operation.
    • What are the possible hazards of the operation?
    • What does the FWPT need to stop the operation if there is a hazard present?
  • How will personnel operating a SL+F on the ramp effectively communicate an issue that could compromise safety?
    • Who is responsible for identifying safety issues on the ramp and how do they communicate these issues?
  • When both loading and fueling operations are taking place on the same side of an airtanker all participants must ensure these functions stay apart from each other.
    • Discuss whether base allows SL+F and when it can be authorized to be on the same side versus opposite sides of the fuselage.
    • What are the procedures for maintaining separation during same-side operations at your base?
Category

6MFS Suggestion Form


Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee
 


Follow NWCG on X and Facebook
 


 

NWCG Latest Announcements

Intermediate Faller (FAL2) Position Task Book Update

Date:  July 24, 2026
Questions? 
Please contact: Tree Felling Subcommittee

NWCG Operations Management Committee (OMC) has issued an update to the NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91. To ensure clarity for both trainees and evaluators, the updated FAL2 Position Task Book (PTB) explicitly states who is authorized to sign off on your tasks:

“Evaluators must be qualified as a FAL2, or an Advanced Faller (FAL1).”

If you are currently working out of a previously published version of the FAL2 PTB, you do not need to restart. However, OMC highly encourages you to take the following step to prevent any confusion in the field:

  • Print and replace the updated evaluator information page (page 2) in your current physical PTB.

References:

Intermediate Faller (FAL2) Position Page

RMC Memo 26-01: Transition Plan for Implementing Updates to Intermediate Faller (FAL2) Position Qualifications

NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Date:  July 10, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics/Equipment Management Committee (LMC) has released Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups. This advisory highlights multiple U.S. Forest Service regions reporting front driveline joint failure incidents.

This advisory recommends firefighters and fire managers to: 

  • Follow all Ram-issued inspection, maintenance, and service guidance for front driveline joints. 
  • Consider installing a driveline loop. 
  • Coordinate with fleet managers and service providers to determine the most appropriate driveline loop kit for each pickup.

For further details, please refer to the complete advisory.

References:

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Technical Service Bulletin: 03-002-21

NEW! NWCG Standard Operating Procedures, PMS 900

Date:  July 9, 2026
Questions? 
Please contact: NWCG Staff

NWCG is excited to announce the publication of the NWCG Standard Operating Procedures, PMS 900.

The new publication establishes general, consistent, and uniform standards for conducting business with the National Wildfire Coordinating Group.

References:

NWCG Standard Operating Procedures, PMS 900

Quarter Four Materials for the 2025-2026 Wildland Fire Leadership Campaign Now Available

Date:  July 8, 2026
Questions? 
Please contact: Leadership Development Subcommittee

NWCG is excited to announce that Fourth Quarter materials for the 2025/2026 Wildland Fire Leadership Campaign are now available. This annual initiative offers all students of leadership and wildland fire management an opportunity to engage with essential leadership skills and knowledge needed to lead effectively in dynamic environments.

Quarter Four materials focus on Leadership Level 4: Leader of Leaders (Provide Direction). Leadership Level 4 is where you are setting the conditions for others to do things well, even when you are not present. This quarter focuses on equipping experienced leaders with skills to provide direction, build trust across teams, and foster strong decision making. 

References:

2025/2026 NWCG Leadership Campaign - Leadership Levels

Wildland Fire Leadership Development Program

Leadership Development Subcommittee