The Pepper Hill Fire (Pennsylvania) – October 19, 1938

This Day in History is a brief summary of a powerful learning opportunity and is not intended to second guess or be judgmental of decisions and actions. Put yourself in the following situation as if you do not know the outcome. What are the conditions? What are you thinking? What are YOU doing?

Incident Summary:

Most of north-central Pennsylvania had been extensively logged by large timber companies from 1890 to 1930.  By 1938, fuels in the area consisted of very young second-growth hardwoods, ericaceous shrubs, and logging slash. Following an unusually hot and dry summer, a killing frost on October 7, caused the foliage to cure.  Precipitation for the previous three months had been substantially below normal. High temperatures persisted in the 80s with relative humidity (RH) of 20-25%.

At 1110 on October 19, 1938, the Hunts Run Civilian Conservation Corp (CCC) Camp #S-132 was notified of a possible forest fire. Upon investigation, several fires were located on Pepper Hill Mountain. Two CCC crews were dispatched to the fires. Both crews had just returned from a fire only hours before, and many enrollees requested to stay behind due to fatigue. All enrollees were ordered to go. The two CCC crews began initial attack from both flanks of the fire, anchoring into a nearby road. Both crews began constructing line from the heel of the fire to the top, burning out as needed.  For reasons which are still not clear, crew #2 was ordered to abandon their firing operation on the right flank and proceed to the head of the fire to construct direct downhill line. The crew was ¾ of the way up Pepper Hill Mountain when the fire below made a rapid run that overtook them. A few were able to find safety atop large nearby rocks. The remaining crew was severely burned, and ultimately eight of the young CCC enrollees would lose their lives.


Discussion Points:

Graphic map representing the location of the Pepper Hill Fire in 1938 showing the locations of the crew. Training – Most of the enrollees received little or no formal training.  They were expected to learn what to do on the job.

  • Most of us will work with new firefighters who have little or no experience. It is not reasonable or safe to assume they will learn everything on the fireline. How will your crew prepare new members for success?

Fatigue – Many of the enrollees assigned to the Pepper Hill Fire had just returned to camp from other fires at 0530 that morning.

  • Though we now have work/rest guidelines to help prevent fatigue, a long fire season can still take its toll on even the fittest firefighter. What signs might we see in our crew members that could indicate fatigue?
  • What impact can fatigue have on your crew, and what can you do to lessen the associated risks?

Tactics – The original plan to use the road as an anchor point seems sound, but poor choices were made on the right flank when the crew moved to the head and abandoned their burnout.

  • Without aviation support, would your crew engage this fire? If so, how?
  • Though not a sound decision at Pepper Hill, describe conditions where, while ensuring safety, attacking the head of a fire could be a viable tactic.

Crew Cohesion – The CCC Enrollees had not worked many fires together.  On their way up the hill, they became separated due to differences in physical ability.  There were no indications that their crew leader gave them any direction during this critical time.

  • No firefighter intends to get into a bad situation. We all train to avoid them, but what if? How would you and your crew manage the safety of all firefighters if faced with a similar situation?

 

 

 

6MFS Suggestion Form


Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee
 


Follow NWCG on X and Facebook
 


 

Last Modified / Reviewed:

NWCG Latest Announcements

ETC Equipment Bulletin: 25-003 Flame-Resistant Shirt Survey

Date: June 12, 2025
Questions?  Please contact:
Equipment Technology Committee

The U.S. Forest Service National Technology and Development Program (NTDP) is seeking input on the Forest Service-designed flame-resistant (FR) shirt, currently available through the National Interagency Support Cache system and FedMall.

NTDP is conducting a product review to improve future FR shirt designs. As part of this effort, a short survey is now open for federal employees who have worn any of three recent FR shirt models. Feedback will guide design improvements to better meet the needs of wildland firefighters.

To comply with the Paperwork Reduction Act, responses are limited to federal employees. The survey is open through September 12, 2025. 

References:

NWCG Alerts

ETC Equipment Bulletin: 25-003

NEW! S-130, Firefighter Training (Blended) Now Available

Date: June 10, 2025
If you have questions, please visit our FAQ page. 
If your question is not answered there, you can 
submit your question using our Contact Us form. 
 

The S-130, Firefighter Training (Blended), equips new wildland firefighters with essential skills through a mix of online learning and hands-on training. The course features a required online component and an instructor-led exercise, reinforcing online concepts with practical performance-based training.

The course builds competencies in wildland fire operations, safety, and equipment use, applicable across various operational environments. Both the online component and instructor-led field exercise must be completed to receive a certificate of completion. Students are required to finish the prerequisite S-190, Introduction to Wildland Fire Behavior, before enrolling in S-130, Firefighter Training (Blended).

References:

S-130, Firefighter Training (Blended)

S-190, Introduction to Wildland Fire Behavior

Wildland Fire Learning Portal

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

Date: June 3, 2025
Questions?  Please contact:
Emergency Medical Committee

The Emergency Medical Committee has issued interim guidance for Rapid Extraction Module Support (REMS) teams. Until further notice, Type I and II REMS teams must designate a team leader qualified at Firefighter Type 1 Squad Boss (FFT1) or higher. This temporary change replaces the Single Resource Boss (SRB) requirement, which is currently not feasible due to administrative barriers.

This memorandum does not include any other changes to the NWCG Standards for Rapid Extraction Module Support, PMS 552. This interim change takes effect immediately and will remain in place until further notice.

References:

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

NWCG Standards for Rapid Extraction Module Support, PMS 552

Equipment Bulletin 25-002: Chaps, Chain Saw, M-2020, Nonconformities Affecting Use, Appearance, and Serviceability

Date: June 2, 2025
Questions?  Please contact:
Equipment Technology Committee

The Equipment Technology Committee issued Equipment Bulletin: 25-002 to address a manufacturing nonconformity affecting Forest Service specification, 6170-4K Chain Saw Chaps. The issue applies to chaps manufactured in 2024 and 2025 and distributed through FedMall. These chaps may have incorrectly bound edges that expose inner protective layers.

Independent purchasers should inspect all chain saw chaps received from FedMall beginning in 2024, prior to use. Review the full Equipment Bulletin: 25-002 for inspection criteria and recommended actions.

References:

NWCG Alerts

ETC Equipment Bulletin: 25-002