Skip to main content

After Action Review (AAR) – Part 1

How to Conduct an Effective After Action Review (AAR)

An AAR is a professional discussion of an event. The objective is to identify successes and failures. It is a tool that leaders, teams, crews, and units can use to get maximum learning benefit from every incident or project. It is essential for wildland firefighters to learn from mistakes and to capitalize on successes. It is considered a valuable tool in high-risk professions, where the smallest mistakes can lead to disastrous results. An AAR is not a critique and not a forum to assign blame. It is an open, honest, and professional discussion for purposes of improvement.

Once you (the leader/facilitator) have demonstrated that the AAR works and that it will be part of your team's standard operating procedures, the discussion will become more open. Finding out what they did is not nearly as important as why they did it. Good active listening skills are essential. Do not immediately try to solve or correct the issue, but let it play out. Try to get to the root of the issue. The leader must be a part of the AAR and will have to accept criticism. This is important because the team will be looking for affirmation of the AAR process.

  •  An AAR is performed as immediately after the event as possible by the personnel involved.
  • The leader’s role is to ensure skilled facilitation of the AAR.
  • Reinforce that respectful disagreement is okay. Keep focused on the what, not the who.
  • Make sure everyone participates.
  • Pay attention to time.
  • Establish clear ground rules: encourage candor and openness, all participants have equal ownership, focus on improving performance, and keep all discussions confidential.
  • End the AAR on a positive note.

1. What was planned?

Review the intent of the mission
Desired end state (what does right look like).

2. What actually happened?

Establish the facts
Pool multiple perspectives to build a shared picture of what happened.

3. Why did it happen?

Analysis of cause and effect
Provide progressive refinement for drawing out explanations of what occurred.

4. What are we going to do next time?

Correct weaknesses and sustain strengths
Focus on items you can fix, rather than external forces outside of your control.

 

Also see: AAR part 2

6MFS Suggestion Form


Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee
 


Follow NWCG on X and Facebook
 


 

Last Modified / Reviewed:

NWCG Latest Announcements

Updated! L-280, Followership to Leadership (Instructor-led) Course

Date: October 3, 2024
Questions? Please contact:
Leadership Committee

NWCG is pleased to announce the updated L-280, Followership to Leadership (Instructor-led) course is now available. L-280 is intended for operational personnel at the Firefighter Type 1 level, and for individuals pursuing Leadership Level 2, New Leader. 

This instructor-led course is a primer on leadership and the second formal course in the Wildland Fire Leadership Development Program. It helps emerging leaders build the confidence, skills, and mindset needed to lead effectively in high-risk environments. 

For more information about leadership development and available courses, visit the Leadership Committee Web Portal.

References:

L-280, Followership to Leadership (Instructor-led)

Wildland Fire Leadership Development Program

Wildland Fire Learning Portal

Equipment Advisory 25-01: Pre-2006 Fire Shelter Degradation and Discontinuation of Use

Date: Sept 26, 2025
Questions? Please contact:
Equipment Technology Committee 

The Equipment Technology Committee (ETC) has released Equipment Advisory 25-01: Pre-2006 Fire Shelter Degradation and Discontinuation of Use. This advisory recommends all pre-2006 fire shelters should be removed from service by January 1, 2026.

This advisory recommends firefighters and fire managers to:

  • Inspect fire shelters immediately
  • Replace and destroy any pre-2006 shelters (identified by white or pink insert label)
  • Order replacements as needed

For further details, please refer to the complete advisory. 

References:

Equipment Advisory 25-01: Pre-2006 Fire Shelter Degradation and Discontinuation of Use

NWCG Fire Inspection Flowchart, PMS 411-1

NWCG Alerts

NEW! S-219, Firing Operations (Blended) Now Available

Date: Sept 11, 2025
Questions? Please contact:
Fuels Management Committee 

The S-219, Firing Operations (Blended) course is now available on the Wildland Fire Learning Portal. Developed through the Incident Performance and Training Modernization (IPTM) effort, this training supports individuals working towards Firing Boss, Single Resource (FIRB) incident qualifications.

This blended course combines online and instructor-led training to provide students with the knowledge and skills required to perform the duties of the FIRB, as described in the NWCG Incident Position Standards for Firing Boss, Single Resource, PMS 350-105.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1, scheduled for January 2026.

References:

S-219, Firing Operations (Blended)

NWCG Firing Boss, Single Resource Position Page

Wildland Fire Learning Portal

NWCG Committees Observe Suicide Prevention Awareness Week: September 7-13, 2025

Date: Sep 5, 2025
Questions? Please contact:
Mental Health Subcommittee

The NWCG Mental Health Subcommittee (MHSC) and Risk Management Committee (RMC) recognize the unique challenges and demands faced by the wildland fire community. The MHSC and RMC know that we are all stronger together and believe in fostering a culture of support, understanding, and resilience.

Suicide Prevention Awareness encourages us to actively connect with and support each other. For more information that could make a difference for yourself or someone else please review the materials and resources provided for the 2025 Suicide Prevention Awareness Week.

References:

2025 Suicide Prevention Awareness Week Materials and Resources